Loading...
12-669-001courrr APPROVED BY: DEPARTMENT OF REGULATORY & ECONOMIC RESOURCES OFFICE OF THE PLAN REVIEW SERVICES LEE HEFTY., ASSISTANT DIRECTOR DATE: September 25., 2012 IW5#/DERM: TO BE ASSIGN For the Director: Tomas Fonte., 'A DERM#: M2012008609 FOLIO#: 09-4036-073-0001 NOTE: THIS APPROVAL IS NOT INTEMX-FtMCOVER STRUCTURAL DESIGN. NO CONSTRUCTION SHALL TAKE PLACE ON CONTAMINATED GROUND. INDUSTRIAL FACILITIES SECTION ONLY PROJECT NAME: South Miami Advanced Center for Surgery ADDRESS (APPROX.): 7330 SW 62 PLACE (SUITE 200) MIAMI, FL Conditions: 1. This approval is granted for proposed office based surgical facility with two (2) treatment rooms, pre-op holding room, one (1) bio hazardous area, one (1) operating room, one (1) large recovery area, one (1) nurse's station rooms , storage & utility room, with locations as shown on plans. 2. All and any biomedical waste materials to be treated, stored and disposed of will follow applicable guidelines (Florida Department of Health and OSHA) and placed in red bags and removed by approved licensed company. 3. The process used for cleaning of equipment will be by using surface disinfectants, instrument cleaning solutions, lubricants and autoclave cleaning solutions. All of these chemicals will be stored within the Utility room. 4. Treatment rooms may have skin peel solutions, scrub sinks will have hand scrub solutions and none of these chemicals either for cleaning and/or for procedures will be contained in 55 gallons capacity containers. 5. There will be no x-ray equipment, film development equipment, or chemicals used for photo development. Facility will not be required to utilize any laboratory equipment, no