12-669-001courrr
APPROVED BY:
DEPARTMENT OF REGULATORY & ECONOMIC RESOURCES
OFFICE OF THE PLAN REVIEW SERVICES
LEE HEFTY., ASSISTANT DIRECTOR
DATE: September 25., 2012
IW5#/DERM: TO BE ASSIGN
For the Director: Tomas Fonte.,
'A
DERM#: M2012008609
FOLIO#: 09-4036-073-0001
NOTE: THIS APPROVAL IS NOT INTEMX-FtMCOVER STRUCTURAL DESIGN. NO
CONSTRUCTION SHALL TAKE PLACE ON CONTAMINATED GROUND.
INDUSTRIAL FACILITIES SECTION ONLY
PROJECT NAME: South Miami Advanced Center for Surgery
ADDRESS (APPROX.): 7330 SW 62 PLACE (SUITE 200)
MIAMI, FL
Conditions:
1. This approval is granted for proposed office based surgical facility with two (2) treatment
rooms, pre-op holding room, one (1) bio hazardous area, one (1) operating room, one
(1) large recovery area, one (1) nurse's station rooms , storage & utility room, with
locations as shown on plans.
2. All and any biomedical waste materials to be treated, stored and disposed of will follow
applicable guidelines (Florida Department of Health and OSHA) and placed in red bags
and removed by approved licensed company.
3. The process used for cleaning of equipment will be by using surface disinfectants,
instrument cleaning solutions, lubricants and autoclave cleaning solutions. All of these
chemicals will be stored within the Utility room.
4. Treatment rooms may have skin peel solutions, scrub sinks will have hand scrub
solutions and none of these chemicals either for cleaning and/or for procedures will be
contained in 55 gallons capacity containers.
5. There will be no x-ray equipment, film development equipment, or chemicals used for
photo development. Facility will not be required to utilize any laboratory equipment, no