Loading...
10-201-004LAN DEMOLITION NOTES 1. DASHED LINES INDICATE EXTG. TO BE REMOVED. CONSULT WITH STRUCTURAL MECH., ELECT. & PLUMB. ENGINEERS PRIOR TO DEMOLITION 2. PROTECT EXTG. CONSTRUCTION DURING DEMOLITION & NEW L. CONSTRUCTION. 3. ALL INTERIOR DOORS & HARDWARE INDICATED TO BE DEMOLISHED ARE TO BE REMOVED, CATALOGUED& STORED FOR FUTURE USE 4. ALL NON-OPERATING ALARM EQUIPMENT THAT IS NO LONGER NEEDED IS TO BE REMOVED. CONSULT WITH MEP, ENGINEER PRIOR TO REMOVAL. revisions: A A A 'vo tAool SOO of Of '91 - C' 'amiko0o sf, C11, T" IJILDING ?v71AMJ OUCTURAI �VpRovf'l 8 Y. C), j I Try 'AFIRE, DEP% _qc1r_ME '. a J AI(D MCM - - - - - - - project: I I SOUTH MIAMI D K7) I MEDICAL SQUARE I 1 7330 SW, 62 PLACE D AT/____`� U SOUTH MIAMI, FL 33 3 UPSTAIRS STUDIO (2010 COSMETIC IMPROVEMENTS .11 9°s--° architecture Maricarmen Martinez, AIA 7J U 3941 Midway Street :37 Miami, Florida 33133 (D Tel 305 447-1907 Fax 305 447-1906 (D A2 2 'Z) e -mail: info@upstairsstudioarchitecture.com ■ FLORIDA LICENSE: AA 0003148 J