HVAC NOTES
I
1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY MATERIALS AND LABOR
FOR A COMPLETELY OPERATIONAL HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) SYSTEM AS DEPICTED ON THESE CONTRACT DOCUMENTS.
1.2 INSTALL IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, ASHRAE
SMACNA, NFPA AND LOCAL ORDINANCES.
1.3 SCOPE OF WORK :
PROVIDE THE FOLLOWING COMPLETE SYSTEMS
A. AIR CONDITIONING SUPPLY AND RETURN DUCT SYSTEM.
B. EXHAUST SYSTEM FOR TOILET ROOMS.
C. EXHAUST SYSTEMS FOR WAREHOUSE.
D. AIR CONDITIONING UNITS AND CONTROLS.
E. INDEPENDENT TEST AND BALANCE.
1.4 NOT USED
1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQUIRED
1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS AVAILABLE FOR THE INSTALLATION OF
MATERIALS AND EQUIPMENT PRIOR THE INSTALLATION OF EQUIPMENT AND FABRICATION
OF DUCTS AND PIPING SYSTEMS. COORDINATE SPACE REQUIREMENTS FOR SERVICE
AND MAINTENANCE AND COORDINATE INTERFERENCE WITH OTHER TRADES.
1.7 NATURE OF DESIGN DRAWINGS; DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND
TO SHOW EVERY FITTING, ELBOW, TRANSITION, ETC. THAT WILL BE NECESSARY FOR A
COMPLETE AND OPERATIONAL SYSTEMS REQUIRED BY THESE SPECIFICATIONS.
1.8 COORDINATION DRAWINGS; PREPARE 1/4" SCALE (MIN.) COORDINATION DRAWINGS SHOWING
DUCTWORK, PIPING AND ALL MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL BEFORE
PROCEEDING WITH THE INSTALLATION. IMPLEMENT ALL INFORMATION FROM 1.6 ABOVE.
1.9 SUBMIT SHOP DRAWINGS FOR A/E APPROVAL BEFORE PROCEEDING WITH THE
THE PURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS.
ALL SHOP DRAWINGS MUST BE SUBMITTED IN A SINGLE BOUND AND INDEXED PACKAGE
NO LATER THAN 30 DAYS FROM THE ADJUDICATION OF THE PROJECT.
1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A
A PERIOD OF ONE YEAR FROM THE DATE OF PROJECT ACCEPTANCE.
2.0 MATERw
2.1 DUCTWORK
2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE
DIMENSIONS.
2.1.2 DUCTWORK MATERIALS:
A: GENERAL OFFICE AREAS:
FIVE POUNDS DENSITY 1.5" THICK GLASS FIBER (R -6)
DESIGNED, CONSTRUCTED AND INSTALLED IN ACCORDANCE
WITH SMACNA'S FIBROUS GLASS DUCT CONSTRUCTION STANDARDS.
DUCT JOINTS SHALL BE SEALED AND TAPED.
B: TOILET ROOM EXHAUST AND FRESH AIR INTAKES:
GALVANIZED SHEET METAL, CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
PRESSURE CONSTRUCTION STD. (0.5" W.G.)
C: EXPOSED AIR CONDITIONING DUCTWORK
SPIRAL GALVANIZED SHEET METAL, CDNSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
PRESSURE CONSTRUCTION STD. (0.5" W.G.)
2.1.3 PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL SQUARE ELBOWS.
WHERE THE ELBOWS ARE RECTANGULAR INSTALL SINGLE THICKNESS VANES.
.1 ALTERNATE A: PROVIDE 3 -PIECE ELBOWS IN LIEU
OF TURNING VANES FOR GLASS FIBER DUCTS ONLY.
.2 ALTERNATE A: PROVIDE FULL RADIOS ELBOWS IN LIEU
OF TURNING VANES.
2.1.4 PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY
OUTLET AND AT EACH DUCT BRANCH.
2.2 NOT USED.
2.3 NOT USED.
Town Kitchen and Bar
Restaurant Expansion
SUITE 100+120, GROUND FLOOR, PLAZA 57
7301 S.W. 57TH COURT
CITY OF •
SOUTH . FLORIDA
2.4 AIR DISTRIBUTION PRODUCTS :
2.4.1 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION PRODUCTS.
2.4.2 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS AS INDICATED
ON THE DRAWINGS AND SCHEDULES.
2.4.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION WITH THE
CEILING TYPES AS SHOWN ON ARCHITECTURAL DRAWINGS.
2.4.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS
BEHIND ALL AIR SUPPLY OUTLETS.
2.5 PROVIDE A MINIMUM 5 YEAR WARRANTY FOR ALL AIR CONDITIONING
COMPRESSORS STARTING FROM THE DATE OF PROJECT ACCEPTANCE.
2.6 CONTROLS:
2.6.1 GENERAL: PROVIDE THE NECESSARY AUTOMATIC CONTROLS FOR PROPER OPERATION
OF ALL EQUIPMENT SPECIFIED HEREIN. FURNISH MAGNETIC STARTERS AND INTERLOCK
WIRING INDICATED FOR EACH PIECE OF EQUIPMENT.
2.6.2 OFFICE AREA DX EQUIPMENT:
PROVIDE AIR CONDITIONING UNITS WITH MATCHING LOW VOLTAGE HEAT /COOL
THERMOSTATS WITH ON -OFF AUTO SUB -BASE SWITCH AS FURNISHED
BY THE EQUIPMENT MANUFACTURER.
2.7 STARTERS:
PROVIDE MAGNETIC STARTER FOR ALL MECHANICAL EQUIPMENT IN THIS SECTION
AS DESCRIBED ON THE EQUIPMENT SCHEDULES. ALL STARTERS MUST HAVE
HAND -OFF -AUTO POSITION SWITCH ON THE COVER AND RED /GREEN PILOT LIGHTS.
PROVIDE THE NECESSARY AUXILIARY OPEN AND CLOSED CONTACTS
FOR THE INTENDED OPERATION AND INTERLOCKS.
2.8 NOT USED.
2.9 IDENTIFICATION:
2.9.1 LABEL ALL EQUIPMENT WITH ENGRAVED BLACK PLASTIC PLAQUES 12 "x4" HIGH WITH
WITH 1.5" LETTERS. USE THE SAME NOMENCLATURE AS IN THESE DOCUMENTS.
2.10 RETURN AIR CEILING PLENUMS:
2.10.1 WHEN CEILING SPACES ARE USED AS "RETURN AIR CEILING PLENUMS"
ALL MATERIALS INSIDE THE R/A CEILING PLENUM SHALL HAVE
A MAXIMUM FLAME SPREAD INDEX OF 25 AND A MAXIMUM
SMOKE DEVELOPED INDEX OF 50 PER NFPA 90A.
"NO PVC PIPING IS ALLOWED INSIDE THE R/A PLENUM."
2.10.2 PROVIDE FREE PATH FOR R/A INSIDE CEILING SPACE.
SEE ARCHITECTURAL PLAN FOR COORDINATION
3.0 EXECUTION
3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S MANUALS AND RECOMMENDATIONS, PAYING SPECIAL ATTENTION
TO REQUIRED CLEARANCES FOR INSTALLATION, OPERATION & SERVICE.
FOR INSTALLATION, OPERATION AND SERVICE.
3.2 NOT USED
3.3 THERMOSTAT LOCATION.
THERMOSTAT LOCATION IS CRITICAL TO PROPER EQUIPMENT OPERATION.
INSTALL THERMOSTAT AT LOCATIONS SHOWN ON PLANS.
RELOCATE ONLY WHEN APPROVED BY THE A/E IN WRITING.
3.4 RETURN AIR FOR INDIVIDUAL ROOMS IS BEING PROVIDED AS SHOWN ON PLANS
AND IS SIZED COUNTING ON A 1" UNDERCUT FOR ALL DOORS IN ADDITION TO
THE REQUIRED RETURN OR TRANSFER SYSTEM.
3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION
REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND
TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A /E.
3.6 BALANCE ALL SYSTEMS TO PROVIDE AIR AND WATER QUANTITIES AND CAPACITIES
TO MATCH SPECIFIED FLOWS & CAPACITIES.
CALIBRATE FLOWS TO NEW EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
SUBMIT FINAL TEST AND BALANCE REPORT TO A/E FOR ACCEPTANCE.
A/C S IM DULE
DESIGNATION
YES
EXIST. AC -1
QUANTITY
USE
SUPPLY
AREA SERVED
-
SUITE 120
MANUFACTURER
" ALUMINIUM
RHEEM
FAN COIL MODEL No.
SHOWN ON PLANS'
R5NK -11
CONDENSING UNIT MODEL No.
SIZE
RPMC -030JA
C O M E l l N E D RATINGS
TOTAL SENSIBLE CAPACITY BTU HR
TYPE
20,000
GRAND TOTAL CAPACITY BTU HR
_
21,400
TOTAL HEATING CAPACITY BTU HR
DII =RISER
11000
ENERGY EFFICIENCY RATIO SEER (EER)
ALL ALUMINIUM
13.15
COEFFICIENT OF PERFORMANCE COP
MOUNTING TYPE
T - BAR
F A N N C O I L U N I T
TYPE
NOISE CRITERIA
HORIZONTAL
TOTAL AIR SUPPLY CFM
1000
OUTSIDE AIR SUPPLY CFM
METALAIRE
150
ENTERING AIR CONDITIONS FDB FWB
RCD
80/61
EVAPORATOR COIL MIN. ROWS /MAX. F.P.I.
A C C E S S O R I E S
-
EXTERNAL STATIC PRESSURE "H20
-
0.38
FAN SPEED RPM
-
-
FAN MOTOR HP
CONNECTION SIZE
1/4
ELECTRICAL SERVICE AVAILABLE 1
208/1160
RUNNING LOAD AMPS
-
ELECTRIC RESISTANCE HEATER SIZE KW
5
UNIT WEIGHT
19
C O N D E N S I N G U N I T
TYPE
AIR COOLED
LOCATION
ROOF
REFRIGERANT TYPE
R-22
AMBIENT AIR TEMPERATURE FDB
95'F
NUMBER OF COMPRESSORS
1
NUMBER OF REFRIGERANT CIRCUITS
1
CAPACITY REDUCTION STEPS %
0 -100
ELECTRICAL SERVICE AVAILABLE
208!1160
RUNNING LOAD AMPS
13.5
MINIMUM CIRCUIT AMPS
11
MAXIMUM FUSE SIZE AMPS
Z5
UNIT WEIGHT
225
A C C E S S O R I E S
REFRIGERANT PIPING LENGHT FT.
SEE PLANS
LIQUID LINE TYPE O.D.
AS PER MANUR
SUCTION LINE SIZE O.D.
RECOU. 4 SPECIF
THERMOSTAT
HEAT /COOL
FILTER SECTION AND FILTER TYPE
IV2' THROWAWA
SMOKE DETECTOR
VIBRATION ISOLATORS
FOR FAN COIL UNIT
FOR CONDENSING UNIT
A U T O M A T I C C O N T R O L S
TYPE
DESCRIPTION
N O T E S
(•) FOR REFRIGERANT PIPE SIZING, SEE MANUFACTURER RECOM. 4 SPEC5.
(1) PROVIDE FACTORY INSTALLED DOUBLE WALL FOAM INSULATED CABINET
(2) PROVIDE FACTORY INSTALLED ECM BLOWER MOTOR, DRAIN PANS, ALUMINUM EvAP. COIL.
CU NOTES:
(4) PROVIDE LIQUID 4 SUCTION SERVICE VALVES
(5) PROVIDE LIQUID SOLENOID VALVE, SIGH GLASS 4 LIQUID LINE FILTER DRYER
(6) PROVIDE FACTORY INSTALLED 2 STAGE COMPRESSOR
(1) PROVIDE CO2 SEN50R INTERCONNECTED WITH O/A MOTOIRIZED DAMPER
ANTONIO FRANYIE
PE #11640 MECH
VIVIANA FRANYIE
PE #49965 ME
01
10
Certificate of
0 Authorization #
� 00002906
10610 NW 27 Street, Miami FL 33172
TEL: (305 592- 1360 FAX (305) 594 -9279
www. ran ieen ineers.com
DESIGN DRAWN `',DATE
IP/VF If=
JOB NUMBER 13_12 -1
AIR DISTRIBUTION SCHEDULE
DESIGNATION
YES
NO
Remarks
USE
SUPPLY
RETURN
-
CONSTRUCTION
ALUMINIUM
" ALUMINIUM
-
CAPACITY (C.F.M.)
SHOWN ON PLANS'
-
-
SIZE
SHOWN ON PLANS'
-
-
TYPE
CIRCULAR
_
_
COMMENTS :
DIRECTIONAL CEILING
DII =RISER
-
FINISH
ALL ALUMINIUM
ALL ALUMINIUM
-
MOUNTING TYPE
T - BAR
T - BAR
NOISE CRITERIA
30 MAX
30 MAX
MANUFACTURER
METALAIRE
METALAIRE
MODEL
RCD
RW
A C C E S S O R I E S
OPPOSED BLADE REGIST.
OBD
-
FIRE DAMPER
-
CONNECTION SIZE
SHOWN ON PLAN
NOTES
1. FINISHES AND TYPES OF MOUNTS SHALL BE COORDINATED WITH ARCHITECTURAL DRAWINGS.
2. PROVIDE SINGLE THICKNESS TURNING VANES AT ALL 90D RECTANGULAR ELBOWS AND DOUBLE
THICKNESS TURNING VANES AT ALL 90° SQUARE ELBOWS, OR 3 PIECE ELBOWS.
3. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH
SUPPLY OUTLETS MODEL - OBDC.
DUCT BRANCH TAKE -OFF MODEL - AIRTROL MOD. 102
4. PROVIDE O.B. DAMPER AT ALL SUPPLY OUTLETS.
5. DUCT WORK TYPE SEE A/C NOTES.
6. AIR PATTERN AND DIFFUSOR FACE SHOWN ON PLANS.
7. DIFFUSOR NECK SIZE SHOWN ON PLANS. (6x6, 9x9, 1202, OR 15x15)
HVAC DESIGN REQUIRES:
YES
NO
Remarks
DUCT SMOKE DETECTOR
_
V/
-
FIRE DAMPER(S)
-
-
-
SMOKE DAMPER(S)
-
-
-
FIRE RATED ENCLOSURE
-
-
-
FIRE RATED ROOF/FLOOR
CEILING ASSEMBLY
-
_
_
FIRE STOPPING
-
-
-
SMOKE CONTROL.
-
-
-
SOUTH MIAML FLORDA 33143
TEL (305) 669 -7592
WWW.CHANDLERARCHITECTURE.COM
COFYF1I W 2013
NO. DATE FE-VISION
it tool txrpr„Fr� ®�
ao
No. y
a
2Q
�- aNAL
fI
d.
a a,
,4
g � ;
,,$
A 4P
THESE PLANS ARE FOR BUILDING DEPARTMENT REVIEW. THEY ARE
NOT TO BE CONSTRUED AS FINAL CONSTRUCTION DOCUMENTS
UNTIL ALL BUILDING DEPARTMENT APPROVALS ARE OBTAINED AND
COMMENTS INCORPORATED INTO THESE DWGS. DUE TO THE
VARIATIONS IN INTERPRETATIONS OF THE CODE THAT OCCUR IN
DIFFERENT MUNICIPALITIES FINAL APPROVAL AND REVIEW IS NEEDED
TO ASSURE COMPLIANCE MATH THE APPUCABLE CODES AND
STANDARDS.
DRAWBVC;E TITL C_
HVAC
PkRnAL FLOOR PALN
SUITE 120
SCALE.
DATE- JUNE 24, 201
PROJECT ND 2012
DRAWING NO
M -102
I
t•84 �'