Loading...
13-735-0090 z a u 0 LA 0 CL CL HVAC NOTES I 1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SYSTEM AS DEPICTED ON THESE CONTRACT DOCUMENTS. 1.2 INSTALL IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, ASHRAE SMACNA, NFPA AND LOCAL ORDINANCES. 1.3 SCOPE OF WORK : PROVIDE THE FOLLOWING COMPLETE SYSTEMS A. AIR CONDITIONING SUPPLY AND RETURN DUCT SYSTEM. B. EXHAUST SYSTEM FOR TOILET ROOMS. C. EXHAUST SYSTEMS FOR WAREHOUSE. D. AIR CONDITIONING UNITS AND CONTROLS. E. INDEPENDENT TEST AND BALANCE. 1.4 NOT USED 1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED 1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS AVAILABLE FOR THE INSTALLATION OF MATERIALS AND EQUIPMENT PRIOR THE INSTALLATION OF EQUIPMENT AND FABRICATION OF DUCTS AND PIPING SYSTEMS. COORDINATE SPACE REQUIREMENTS FOR SERVICE AND MAINTENANCE AND COORDINATE INTERFERENCE WITH OTHER TRADES. 1.7 NATURE OF DESIGN DRAWINGS; DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND TO SHOW EVERY FITTING, ELBOW, TRANSITION, ETC. THAT WILL BE NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEMS REQUIRED BY THESE SPECIFICATIONS. 1.8 COORDINATION DRAWINGS; PREPARE 1/4" SCALE (MIN.) COORDINATION DRAWINGS SHOWING DUCTWORK, PIPING AND ALL MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL BEFORE PROCEEDING WITH THE INSTALLATION. IMPLEMENT ALL INFORMATION FROM 1.6 ABOVE. 1.9 SUBMIT SHOP DRAWINGS FOR A/E APPROVAL BEFORE PROCEEDING WITH THE THE PURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. ALL SHOP DRAWINGS MUST BE SUBMITTED IN A SINGLE BOUND AND INDEXED PACKAGE NO LATER THAN 30 DAYS FROM THE ADJUDICATION OF THE PROJECT. 1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A A PERIOD OF ONE YEAR FROM THE DATE OF PROJECT ACCEPTANCE. 2.0 MATERw 2.1 DUCTWORK 2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. 2.1.2 DUCTWORK MATERIALS: A: GENERAL OFFICE AREAS: FIVE POUNDS DENSITY 1.5" THICK GLASS FIBER (R -6) DESIGNED, CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH SMACNA'S FIBROUS GLASS DUCT CONSTRUCTION STANDARDS. DUCT JOINTS SHALL BE SEALED AND TAPED. B: TOILET ROOM EXHAUST AND FRESH AIR INTAKES: GALVANIZED SHEET METAL, CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW PRESSURE CONSTRUCTION STD. (0.5" W.G.) C: EXPOSED AIR CONDITIONING DUCTWORK SPIRAL GALVANIZED SHEET METAL, CDNSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW PRESSURE CONSTRUCTION STD. (0.5" W.G.) 2.1.3 PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR INSTALL SINGLE THICKNESS VANES. .1 ALTERNATE A: PROVIDE 3 -PIECE ELBOWS IN LIEU OF TURNING VANES FOR GLASS FIBER DUCTS ONLY. .2 ALTERNATE A: PROVIDE FULL RADIOS ELBOWS IN LIEU OF TURNING VANES. 2.1.4 PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH. 2.2 NOT USED. 2.3 NOT USED. Town Kitchen and Bar Restaurant Expansion SUITE 100+120, GROUND FLOOR, PLAZA 57 7301 S.W. 57TH COURT CITY OF • SOUTH . FLORIDA 2.4 AIR DISTRIBUTION PRODUCTS : 2.4.1 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION PRODUCTS. 2.4.2 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS AS INDICATED ON THE DRAWINGS AND SCHEDULES. 2.4.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL DRAWINGS. 2.4.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS BEHIND ALL AIR SUPPLY OUTLETS. 2.5 PROVIDE A MINIMUM 5 YEAR WARRANTY FOR ALL AIR CONDITIONING COMPRESSORS STARTING FROM THE DATE OF PROJECT ACCEPTANCE. 2.6 CONTROLS: 2.6.1 GENERAL: PROVIDE THE NECESSARY AUTOMATIC CONTROLS FOR PROPER OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN. FURNISH MAGNETIC STARTERS AND INTERLOCK WIRING INDICATED FOR EACH PIECE OF EQUIPMENT. 2.6.2 OFFICE AREA DX EQUIPMENT: PROVIDE AIR CONDITIONING UNITS WITH MATCHING LOW VOLTAGE HEAT /COOL THERMOSTATS WITH ON -OFF AUTO SUB -BASE SWITCH AS FURNISHED BY THE EQUIPMENT MANUFACTURER. 2.7 STARTERS: PROVIDE MAGNETIC STARTER FOR ALL MECHANICAL EQUIPMENT IN THIS SECTION AS DESCRIBED ON THE EQUIPMENT SCHEDULES. ALL STARTERS MUST HAVE HAND -OFF -AUTO POSITION SWITCH ON THE COVER AND RED /GREEN PILOT LIGHTS. PROVIDE THE NECESSARY AUXILIARY OPEN AND CLOSED CONTACTS FOR THE INTENDED OPERATION AND INTERLOCKS. 2.8 NOT USED. 2.9 IDENTIFICATION: 2.9.1 LABEL ALL EQUIPMENT WITH ENGRAVED BLACK PLASTIC PLAQUES 12 "x4" HIGH WITH WITH 1.5" LETTERS. USE THE SAME NOMENCLATURE AS IN THESE DOCUMENTS. 2.10 RETURN AIR CEILING PLENUMS: 2.10.1 WHEN CEILING SPACES ARE USED AS "RETURN AIR CEILING PLENUMS" ALL MATERIALS INSIDE THE R/A CEILING PLENUM SHALL HAVE A MAXIMUM FLAME SPREAD INDEX OF 25 AND A MAXIMUM SMOKE DEVELOPED INDEX OF 50 PER NFPA 90A. "NO PVC PIPING IS ALLOWED INSIDE THE R/A PLENUM." 2.10.2 PROVIDE FREE PATH FOR R/A INSIDE CEILING SPACE. SEE ARCHITECTURAL PLAN FOR COORDINATION 3.0 EXECUTION 3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S MANUALS AND RECOMMENDATIONS, PAYING SPECIAL ATTENTION TO REQUIRED CLEARANCES FOR INSTALLATION, OPERATION & SERVICE. FOR INSTALLATION, OPERATION AND SERVICE. 3.2 NOT USED 3.3 THERMOSTAT LOCATION. THERMOSTAT LOCATION IS CRITICAL TO PROPER EQUIPMENT OPERATION. INSTALL THERMOSTAT AT LOCATIONS SHOWN ON PLANS. RELOCATE ONLY WHEN APPROVED BY THE A/E IN WRITING. 3.4 RETURN AIR FOR INDIVIDUAL ROOMS IS BEING PROVIDED AS SHOWN ON PLANS AND IS SIZED COUNTING ON A 1" UNDERCUT FOR ALL DOORS IN ADDITION TO THE REQUIRED RETURN OR TRANSFER SYSTEM. 3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A /E. 3.6 BALANCE ALL SYSTEMS TO PROVIDE AIR AND WATER QUANTITIES AND CAPACITIES TO MATCH SPECIFIED FLOWS & CAPACITIES. CALIBRATE FLOWS TO NEW EQUIPMENT PER MANUFACTURER'S REQUIREMENTS. SUBMIT FINAL TEST AND BALANCE REPORT TO A/E FOR ACCEPTANCE. A/C S IM DULE DESIGNATION YES EXIST. AC -1 QUANTITY USE SUPPLY AREA SERVED - SUITE 120 MANUFACTURER " ALUMINIUM RHEEM FAN COIL MODEL No. SHOWN ON PLANS' R5NK -11 CONDENSING UNIT MODEL No. SIZE RPMC -030JA C O M E l l N E D RATINGS TOTAL SENSIBLE CAPACITY BTU HR TYPE 20,000 GRAND TOTAL CAPACITY BTU HR _ 21,400 TOTAL HEATING CAPACITY BTU HR DII =RISER 11000 ENERGY EFFICIENCY RATIO SEER (EER) ALL ALUMINIUM 13.15 COEFFICIENT OF PERFORMANCE COP MOUNTING TYPE T - BAR F A N N C O I L U N I T TYPE NOISE CRITERIA HORIZONTAL TOTAL AIR SUPPLY CFM 1000 OUTSIDE AIR SUPPLY CFM METALAIRE 150 ENTERING AIR CONDITIONS FDB FWB RCD 80/61 EVAPORATOR COIL MIN. ROWS /MAX. F.P.I. A C C E S S O R I E S - EXTERNAL STATIC PRESSURE "H20 - 0.38 FAN SPEED RPM - - FAN MOTOR HP CONNECTION SIZE 1/4 ELECTRICAL SERVICE AVAILABLE 1 208/1160 RUNNING LOAD AMPS - ELECTRIC RESISTANCE HEATER SIZE KW 5 UNIT WEIGHT 19 C O N D E N S I N G U N I T TYPE AIR COOLED LOCATION ROOF REFRIGERANT TYPE R-22 AMBIENT AIR TEMPERATURE FDB 95'F NUMBER OF COMPRESSORS 1 NUMBER OF REFRIGERANT CIRCUITS 1 CAPACITY REDUCTION STEPS % 0 -100 ELECTRICAL SERVICE AVAILABLE 208!1160 RUNNING LOAD AMPS 13.5 MINIMUM CIRCUIT AMPS 11 MAXIMUM FUSE SIZE AMPS Z5 UNIT WEIGHT 225 A C C E S S O R I E S REFRIGERANT PIPING LENGHT FT. SEE PLANS LIQUID LINE TYPE O.D. AS PER MANUR SUCTION LINE SIZE O.D. RECOU. 4 SPECIF THERMOSTAT HEAT /COOL FILTER SECTION AND FILTER TYPE IV2' THROWAWA SMOKE DETECTOR VIBRATION ISOLATORS FOR FAN COIL UNIT FOR CONDENSING UNIT A U T O M A T I C C O N T R O L S TYPE DESCRIPTION N O T E S (•) FOR REFRIGERANT PIPE SIZING, SEE MANUFACTURER RECOM. 4 SPEC5. (1) PROVIDE FACTORY INSTALLED DOUBLE WALL FOAM INSULATED CABINET (2) PROVIDE FACTORY INSTALLED ECM BLOWER MOTOR, DRAIN PANS, ALUMINUM EvAP. COIL. CU NOTES: (4) PROVIDE LIQUID 4 SUCTION SERVICE VALVES (5) PROVIDE LIQUID SOLENOID VALVE, SIGH GLASS 4 LIQUID LINE FILTER DRYER (6) PROVIDE FACTORY INSTALLED 2 STAGE COMPRESSOR (1) PROVIDE CO2 SEN50R INTERCONNECTED WITH O/A MOTOIRIZED DAMPER ANTONIO FRANYIE PE #11640 MECH VIVIANA FRANYIE PE #49965 ME 01 10 Certificate of 0 Authorization # � 00002906 10610 NW 27 Street, Miami FL 33172 TEL: (305 592- 1360 FAX (305) 594 -9279 www. ran ieen ineers.com DESIGN DRAWN `',DATE IP/VF If= JOB NUMBER 13_12 -1 AIR DISTRIBUTION SCHEDULE DESIGNATION YES NO Remarks USE SUPPLY RETURN - CONSTRUCTION ALUMINIUM " ALUMINIUM - CAPACITY (C.F.M.) SHOWN ON PLANS' - - SIZE SHOWN ON PLANS' - - TYPE CIRCULAR _ _ COMMENTS : DIRECTIONAL CEILING DII =RISER - FINISH ALL ALUMINIUM ALL ALUMINIUM - MOUNTING TYPE T - BAR T - BAR NOISE CRITERIA 30 MAX 30 MAX MANUFACTURER METALAIRE METALAIRE MODEL RCD RW A C C E S S O R I E S OPPOSED BLADE REGIST. OBD - FIRE DAMPER - CONNECTION SIZE SHOWN ON PLAN NOTES 1. FINISHES AND TYPES OF MOUNTS SHALL BE COORDINATED WITH ARCHITECTURAL DRAWINGS. 2. PROVIDE SINGLE THICKNESS TURNING VANES AT ALL 90D RECTANGULAR ELBOWS AND DOUBLE THICKNESS TURNING VANES AT ALL 90° SQUARE ELBOWS, OR 3 PIECE ELBOWS. 3. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH SUPPLY OUTLETS MODEL - OBDC. DUCT BRANCH TAKE -OFF MODEL - AIRTROL MOD. 102 4. PROVIDE O.B. DAMPER AT ALL SUPPLY OUTLETS. 5. DUCT WORK TYPE SEE A/C NOTES. 6. AIR PATTERN AND DIFFUSOR FACE SHOWN ON PLANS. 7. DIFFUSOR NECK SIZE SHOWN ON PLANS. (6x6, 9x9, 1202, OR 15x15) HVAC DESIGN REQUIRES: YES NO Remarks DUCT SMOKE DETECTOR _ V/ - FIRE DAMPER(S) - - - SMOKE DAMPER(S) - - - FIRE RATED ENCLOSURE - - - FIRE RATED ROOF/FLOOR CEILING ASSEMBLY - _ _ FIRE STOPPING - - - SMOKE CONTROL. - - - SOUTH MIAML FLORDA 33143 TEL (305) 669 -7592 WWW.CHANDLERARCHITECTURE.COM COFYF1I W 2013 NO. DATE FE-VISION it tool txrpr„Fr� ®� ao No. y a 2Q �- aNAL fI d. a a, ,4 g � ; ,,$ A 4P THESE PLANS ARE FOR BUILDING DEPARTMENT REVIEW. THEY ARE NOT TO BE CONSTRUED AS FINAL CONSTRUCTION DOCUMENTS UNTIL ALL BUILDING DEPARTMENT APPROVALS ARE OBTAINED AND COMMENTS INCORPORATED INTO THESE DWGS. DUE TO THE VARIATIONS IN INTERPRETATIONS OF THE CODE THAT OCCUR IN DIFFERENT MUNICIPALITIES FINAL APPROVAL AND REVIEW IS NEEDED TO ASSURE COMPLIANCE MATH THE APPUCABLE CODES AND STANDARDS. DRAWBVC;E TITL C_ HVAC PkRnAL FLOOR PALN SUITE 120 SCALE. DATE- JUNE 24, 201 PROJECT ND 2012 DRAWING NO M -102 I t•84 �'