Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
10-209-001
I I i t i e' t, e 'r 1 f E x STING IIIIIIIIIIIIItt BPS#10 111111111111111 EST2 Cabinet Batt ery Calculation (EXISTING r C I r Description 7 D 7 Quantity C - Standby (ma) Total Standby (ma) Alarm (ma) Total Alarrn(ma) I S18 -1 S18 -2 S18 -3 S S18 -4 S18 -5 S18 -6 S18 -7 S18 -8 PERMIT 5A25 ' SUITE- 533 ".mrm" "+l S SS4aq. fSWftW%M�SS4L4ILSS41LSSSS41LSSs is, 7 75 7 7 2-MCM Main Controller /LCD Front Panel LED Modules -D L-2 Module 2 LSRA Siga Smoke Detectors Siga Single Stage Pull Stations Siga -CT1 Siga -CC1 Siga -CR Siga -IM Siga -1NTM Heat Detector MR -101 SIGA -RM1 S17 -5 S17 -6 S17 -7 S17 -8 S17 =9 S17 =10 S17 -11- SUITE -545 1 1 1 0 36 17 6 8 12 0 4 6 1 0 x x x x x x x x x x x x x x 150 5 10 80 0 045 025 0 25 0 223 01 150 5 10 0 0 0 0 0 0 WTOTAL(A)16500 275 16 20 80 0 045 0.4 04 01 01 0.045 0.68 0045 15 0.2 275 16 20 0 0 0 0 0 0 0 0 0 0 0 SUITE-560 -1 S15 -2 515-3 S15- 4- S S15- 5 - LL515 - 1 r r7 p 7 D 7 7 D EOL STR #14(1.6A) - 75CD 75CD 7 75CD , T T T T SUITE -510 I TOTAL(B) 311.00 I i Battery Calculation 7 D 75CD 75CD 75CD 75CD 75CD 7 0 EOL STR #13(2.8A) T 5 T - 5 T 513 -6 513T 7 513 T Sup ervisory Hours (C) 24 Battery Capacity (A H) = 1.2'[(AxC) +(0.0167xBxD)1/1000 Alarm Minutes (D) 5 Battery Capacity (A•H) = 4.7779685 Supplied 10 A/H T EC- - - - - I I I 1 III I I I III I II I IIII I I I I1l11 l I I II II I I I I I III1I11111I�TRCAi 11I1I I 1I 1SI 1I1t1ll GurrER EXISTING EM 0 BPS 12 2S#9 BPS 18 Im 11 t #12HN GREQ1i1 4/12HHN GREEN l I I I STROBE OUTPUT LOAD TABLE HORN /STR 75CD(ma) I HORN /STIR I10CD(ma) STIR 75CD(ma) HORN/STR 11 CD(ma)WPI TOTAL Length Wire Size Vdrop ILast Device Output Ci I IQTYISub-To QTYISub-Tot I QTY Sub -Tot QTY Sub -Tot I (mA) (feet) AWG V Voltage(V) STIR. CIRC. #18 281 x 5 1405 337 x 0 0 255 x 3 765 329 x 0 0 2170 300 12 4.4669 15.93315 t UCD 1 JQCD HARDWIRE RELAY TO SUPERVISE P EOL ST #12 (0.438A) POWER FOR SHUNT TRIP OPERATION RELAY TO BE ACTIVATED BY HEAT DETECTOR AT EOL HORN 15 (0.08A) ELEV. SHAFT & MACH. RM, 1/R HD -1 /R PRIM. ALT. FIRE uI -'/K -- MODULE TO INDICATE RECALL RECALL HAT SHUNT TRIP SUPERVISION r C I r 75CD- - 7 D 7 C - 75CD 7 TO BPS#12 T T H , „ rL-i H L H I S18 -1 S18 -2 S18 -3 S S18 -4 S18 -5 S18 -6 S18 -7 S18 -8 PERMIT 5A25 ' SUITE- 533 ".mrm" "+l S SS4aq. fSWftW%M�SS4L4ILSS41LSSSS41LSSs is, 7 75 7 7 S17 -1 S17 -2 S17 -3 S17 -4 S S17 -5 S17 -6 S17 -7 S17 -8 S17 =9 S17 =10 S17 -11- SUITE -545 STROBE OUTPUT LOAD TABLE HORN /STR 75CD(ma) I HORN /STIR I10CD(ma) STIR 75CD(ma) HORN/STR 11 CD(ma)WPI TOTAL Length Wire Size Vdrop ILast Device Output Ci I IQTYISub-To QTYISub-Tot I QTY Sub -Tot QTY Sub -Tot I (mA) (feet) AWG V Voltage(V) STIR. CIRC. #18 281 x 5 1405 337 x 0 0 255 x 3 765 329 x 0 0 2170 300 12 4.4669 15.93315 t UCD 1 JQCD HARDWIRE RELAY TO SUPERVISE P EOL ST #12 (0.438A) POWER FOR SHUNT TRIP OPERATION RELAY TO BE ACTIVATED BY HEAT DETECTOR AT EOL HORN 15 (0.08A) ELEV. SHAFT & MACH. RM, 1/R HD -1 /R PRIM. ALT. FIRE uI -'/K -- MODULE TO INDICATE RECALL RECALL HAT SHUNT TRIP SUPERVISION PR I I T 4A) 1 75CD 75CD 75CD 75CD UTTE -83 i 7 D 7 D 75CD 7 75C EOL ST #11C (2. ROOF � S11C -1 S11C -2 S11 C- S11C -4 S11C -5 SUITE -570 5565 -1 5565 -2 5565 -3 5565 -4 I E -y�� ■ 1 - - vi'T5 L------------------------------- - - - --1 , PERMIT AREA IS] 7 D 715D 7 D 75CD 75CD 75CD 75CD 75CD 7 D 75CD 7 D EOL ST 111 (1.7A) SD SD HD , T T T T T Ieee SD -81�5 SD -9/5 HD -3/5 DD-145 j IN S11 -1 S11 -2 S11 -3 S11 -4 S11 -5 S11 -4A S11 -5A S11 -6 S11-7S11-8 Si1-9 i 11 D 11 CD 1IQCD 1 D 1 D 1 D 7 D 7 D 75CD 75CD 75CD -- -- - EOL ST /11B (2.03A) r SD DD DD HD I S11A -1 S11A -2 S11A -3 S11A -4 SI1A -5 S11A -6 S11A -7 S11A -B S11A -9 S11A -10 SS111A -11 I SD -7/5 DD -5/5 DD-6 /SUITE -535 /5 is, 11 D 11 CO 11 CD 1 CD 1 CD 1 D 7 D 1IQCD 11DCD L------------- - - - - -J EOL ST #itA (2.16A) _ _ T _ _ _ _ _ _ _ S11B -1 S11B -2 S118 -3 S11B -4 S11B -5 S119-6 S118 -8 SIIB -10 S119 -11 I SUITE-560 I SUITE -585 i E CT-1/5 WT- 1/5CR -1/5 CR -2 /6 DD -1/5 DD -2/5 DD -3 /i DD -4/5 D D D D F1 /5 F- 2/550 -1/5 SD 2/5 SD 3/5 SD 4/5 SD 5/5 SD 6/5 HD-1 /5 S AC AC 5TH FLOOR i r ---- - - - - -- -------- 75CD - -- 75CD -- - 75CD EOL STRi45871.63A7 7 D 7 D -- ' 75CD 75CD EOL STR #18(1A) I I rgi C 7 CD 75 c, Ott I T SUITE-420 I TO BPS a 10 T' r i SUITE -450 I S18 -1 S18 -2 S18 -3 S18 -4 �543��S450 -2 S4550 -3 5450 -4 5450 -5 5450 -6 __ I ----------------- - - - - -- r - - - - -- - - - - --'� f - - - 75CD 75CD 75CD EOL STRT4 71 07A) - 75CD 75CD 75CD 75CD EOL $1R #410(1.tA) I 1 75CD � I S S T I SUITE -410 I ITO BPS 0 10 1r�1 � r� ' SUITE-430 I 5410 -1 5410 -2 5410 -3 S410-4 j L - - S430 -1 S430 -2 5430-3 5430 -4 --------- - - - - -J LL------------------- - - - - -- --------------- IS-) i7 D 75CD 75SD 75CD 75CD 75CD EOL STR#16(1.5A) ---- - - - --� T T T S,1A r - - - S iA S IA S IA 1 516 -1 516 -2 516 -3 S16-5 516 -6 516 -4 SUITE-440 L-------------------------- Islip] 110CD 110CD 1 CD 1 CD 1 D 1 CD 1tQCD 110CD 75CD IIIIIIIIIIIIIII IIIIIIIIIIIIIII Iltllllllllllll IIIIIIIIIIIIItI I JUNCTION T P T P P EOL ST #9 (1.75A) BPS#7 BPS #6 BPS #5 BPS #4 S9 -1 S9 -2 S9 -3 S9 -4 S9 -5 S9 -6 S9 -7 S9- EOL HORN #4 (0.2A) TIW - [ u11uu11nm uuuuuulu 11uuuu11lu uunuwlm 7 D 715D 7 D 715D 7 D 75CD 75CD EOL Si #10 (1.56A) r •7 r •-1 = - - - T T I II DD-4/ SUITE450 DD I I S,IB,2A SUITE-430 S10 -1 S10 -2 S10 -3 S10 -4 S10 -5 S10 -4A S10 -5A I II DD -4/4 DD-3/4 DD -6/4 DD-5/4 D D GREEN I 1 #12THHN GREEN 1 %1gTFp{N GREEN I 1 110CD 110CD 110CD 11000 110CD 110CD 110CD 110CD 110CD 110CD I D D I L-------- - --- -- J EOL sr #toA (2.OA) CR C SD I I R R PANEL -4Hr• DEDICATE S10A -1 SIGA -2 S10A -3 SIGA -4 SiGA -5 SIGA -6 S10A -7 S10A -8 S10A -9 S1M -10 -4/4C - /4 SD- - -2/4C -1/4 J BREAKER /13 20A,1P,120V r - - - - T - - - - - - - fi == as~ -•' ~�� i WP WT-2i/4 I DD -1/4 DD -2/41 SUITE -410 I SD -12/4 SUITE -420 SD -16/4 1 1'C ALL 3/4- CONDUIT UNLESS OTHERWISED NOTICED F Sa SD E I L - D U - - � - 1 I E D D 1 D S Tj D- 1 - SD -1- / 0 SD-6/S-7/4 S6 8/4 SD -9/4 S 8ID - - - - - - - - - - - - - - - - - - JJ.• - - - - - - - - - 4J -/4 F -2/4 F - 3/4S- 1/4 S - 15,1 4TH FLOOR PARKING 110CD 1 D 1 CD 110CD 1 D 1 CD 110CD� EOL ST #8 (2.OA) 12'X32'X6� f T Sl S6 -1 S6 -2 S6 -3 S6-4 S6 -5 S6 -6 S 7 B JLNE7ICrJ • r 1 �Dl D 1 C�110CD �IQCD �IC 110tD EOL ST #7 (1.53A) S7 -6 S7 -S7-7 B 1 D 110CD iiOCD 11DCD 110CD 1 JQCD 1 D T T EOL ST #8 (1.31A) S8 -1 S8 -2 S8 -3 S8 -4 S8 -5 58 -6 S8-r EOL HORN 13 (0.440A) WP WP WT -1/3 _ 3TH FLOOR PARKING EOL HORNf2 (0.440A) IS 1 EL ST#3 (2.OA) 1 CD 1 CD 1 D 1 CD 1 D 110CD 11(C 12'X12'X6' 1 P P P JUNCTION S3 1 S3 -2 S3 -3 S3 -4 S3 -5 S3 -6 S3-71H BOX B i 11XD 1 D 1 D 110CD 110CD EOL ST #4 (1.53A) EWL S4 -1 S4 -2 S4 -3 S4-3 S4-4 B 101 i 1 D 1 D 1 CD 1 D 1 D 1 D 11CD T EOL ST #5 (1.31A) S5 -1 S5-2 S5 -3 S5 -4 S5 -5 S5 -6 S5 -7 lA,6S,2B IA-) 1'C-\ WP WP Wr -1/2 _ r -- - 1 3S,t 3SJ 3SA 2 IIIIIIIIII 111 1111IIItlllllll IIIIIIIIIIIIIII IIIIIIIIIIIIIII Illllllllllllllllll FACP BPS#111 BPS #1 BPS #2 BPS #3 ,uuuB,lim uunuunw nnuuumtt 111111111111111 7=t L- -- 1 #12THHN GREEN 2 PHONE LINES FOR= EST1111 REMOTE STATION 200 NOTIFICATION = PANEL'4Hr, DEDICATE 1 #12THHN GREEN BREAKER 20A1P,120V CKT-4 (FACP.BPS /1,2,3) I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF r C I r 75CD- - 7 D 7 C - 75CD 7 TO BPS#12 T T H , „ rL-i H L H I S18 -1 S18 -2 S18 -3 S S18 -4 S18 -5 S18 -6 S18 -7 S18 -8 PERMIT 5A25 ' SUITE- 533 ".mrm" "+l S SS4aq. fSWftW%M�SS4L4ILSS41LSSSS41LSSs is, 7 75 7 7 S17 -1 S17 -2 S17 -3 S17 -4 S S17 -5 S17 -6 S17 -7 S17 -8 S17 =9 S17 =10 S17 -11- SUITE -545 -------------- - -- - -- - 7 is,1 7 7jD 75CD 7 D 75CD 7 7 - 11 SUITE-560 -1 S15 -2 515-3 S15- 4- S S15- 5 - LL515 - 1 r r7 p 7 D 7 7 D EOL STR #14(1.6A) - 75CD 75CD 7 75CD , T T T T SUITE -510 I LLS14 -1 514-2 S14 -3 S14-4 S14-6 514-5 1 - - - - - - I i i SCD 7 D 75CD 75CD 7 7 D 75CD 75CD 75CD 75CD 75CD 7 0 EOL STR #13(2.8A) T 5 T - 5 T 513 -6 513T 7 513 T ROOF � S11C -1 S11C -2 S11 C- S11C -4 S11C -5 SUITE -570 5565 -1 5565 -2 5565 -3 5565 -4 I E -y�� ■ 1 - - vi'T5 L------------------------------- - - - --1 , PERMIT AREA IS] 7 D 715D 7 D 75CD 75CD 75CD 75CD 75CD 7 D 75CD 7 D EOL ST 111 (1.7A) SD SD HD , T T T T T Ieee SD -81�5 SD -9/5 HD -3/5 DD-145 j IN S11 -1 S11 -2 S11 -3 S11 -4 S11 -5 S11 -4A S11 -5A S11 -6 S11-7S11-8 Si1-9 i 11 D 11 CD 1IQCD 1 D 1 D 1 D 7 D 7 D 75CD 75CD 75CD -- -- - EOL ST /11B (2.03A) r SD DD DD HD I S11A -1 S11A -2 S11A -3 S11A -4 SI1A -5 S11A -6 S11A -7 S11A -B S11A -9 S11A -10 SS111A -11 I SD -7/5 DD -5/5 DD-6 /SUITE -535 /5 is, 11 D 11 CO 11 CD 1 CD 1 CD 1 D 7 D 1IQCD 11DCD L------------- - - - - -J EOL ST #itA (2.16A) _ _ T _ _ _ _ _ _ _ S11B -1 S11B -2 S118 -3 S11B -4 S11B -5 S119-6 S118 -8 SIIB -10 S119 -11 I SUITE-560 I SUITE -585 i E CT-1/5 WT- 1/5CR -1/5 CR -2 /6 DD -1/5 DD -2/5 DD -3 /i DD -4/5 D D D D F1 /5 F- 2/550 -1/5 SD 2/5 SD 3/5 SD 4/5 SD 5/5 SD 6/5 HD-1 /5 S AC AC 5TH FLOOR i r ---- - - - - -- -------- 75CD - -- 75CD -- - 75CD EOL STRi45871.63A7 7 D 7 D -- ' 75CD 75CD EOL STR #18(1A) I I rgi C 7 CD 75 c, Ott I T SUITE-420 I TO BPS a 10 T' r i SUITE -450 I S18 -1 S18 -2 S18 -3 S18 -4 �543��S450 -2 S4550 -3 5450 -4 5450 -5 5450 -6 __ I ----------------- - - - - -- r - - - - -- - - - - --'� f - - - 75CD 75CD 75CD EOL STRT4 71 07A) - 75CD 75CD 75CD 75CD EOL $1R #410(1.tA) I 1 75CD � I S S T I SUITE -410 I ITO BPS 0 10 1r�1 � r� ' SUITE-430 I 5410 -1 5410 -2 5410 -3 S410-4 j L - - S430 -1 S430 -2 5430-3 5430 -4 --------- - - - - -J LL------------------- - - - - -- --------------- IS-) i7 D 75CD 75SD 75CD 75CD 75CD EOL STR#16(1.5A) ---- - - - --� T T T S,1A r - - - S iA S IA S IA 1 516 -1 516 -2 516 -3 S16-5 516 -6 516 -4 SUITE-440 L-------------------------- Islip] 110CD 110CD 1 CD 1 CD 1 D 1 CD 1tQCD 110CD 75CD IIIIIIIIIIIIIII IIIIIIIIIIIIIII Iltllllllllllll IIIIIIIIIIIIItI I JUNCTION T P T P P EOL ST #9 (1.75A) BPS#7 BPS #6 BPS #5 BPS #4 S9 -1 S9 -2 S9 -3 S9 -4 S9 -5 S9 -6 S9 -7 S9- EOL HORN #4 (0.2A) TIW - [ u11uu11nm uuuuuulu 11uuuu11lu uunuwlm 7 D 715D 7 D 715D 7 D 75CD 75CD EOL Si #10 (1.56A) r •7 r •-1 = - - - T T I II DD-4/ SUITE450 DD I I S,IB,2A SUITE-430 S10 -1 S10 -2 S10 -3 S10 -4 S10 -5 S10 -4A S10 -5A I II DD -4/4 DD-3/4 DD -6/4 DD-5/4 D D GREEN I 1 #12THHN GREEN 1 %1gTFp{N GREEN I 1 110CD 110CD 110CD 11000 110CD 110CD 110CD 110CD 110CD 110CD I D D I L-------- - --- -- J EOL sr #toA (2.OA) CR C SD I I R R PANEL -4Hr• DEDICATE S10A -1 SIGA -2 S10A -3 SIGA -4 SiGA -5 SIGA -6 S10A -7 S10A -8 S10A -9 S1M -10 -4/4C - /4 SD- - -2/4C -1/4 J BREAKER /13 20A,1P,120V r - - - - T - - - - - - - fi == as~ -•' ~�� i WP WT-2i/4 I DD -1/4 DD -2/41 SUITE -410 I SD -12/4 SUITE -420 SD -16/4 1 1'C ALL 3/4- CONDUIT UNLESS OTHERWISED NOTICED F Sa SD E I L - D U - - � - 1 I E D D 1 D S Tj D- 1 - SD -1- / 0 SD-6/S-7/4 S6 8/4 SD -9/4 S 8ID - - - - - - - - - - - - - - - - - - JJ.• - - - - - - - - - 4J -/4 F -2/4 F - 3/4S- 1/4 S - 15,1 4TH FLOOR PARKING 110CD 1 D 1 CD 110CD 1 D 1 CD 110CD� EOL ST #8 (2.OA) 12'X32'X6� f T Sl S6 -1 S6 -2 S6 -3 S6-4 S6 -5 S6 -6 S 7 B JLNE7ICrJ • r 1 �Dl D 1 C�110CD �IQCD �IC 110tD EOL ST #7 (1.53A) S7 -6 S7 -S7-7 B 1 D 110CD iiOCD 11DCD 110CD 1 JQCD 1 D T T EOL ST #8 (1.31A) S8 -1 S8 -2 S8 -3 S8 -4 S8 -5 58 -6 S8-r EOL HORN 13 (0.440A) WP WP WT -1/3 _ 3TH FLOOR PARKING EOL HORNf2 (0.440A) IS 1 EL ST#3 (2.OA) 1 CD 1 CD 1 D 1 CD 1 D 110CD 11(C 12'X12'X6' 1 P P P JUNCTION S3 1 S3 -2 S3 -3 S3 -4 S3 -5 S3 -6 S3-71H BOX B i 11XD 1 D 1 D 110CD 110CD EOL ST #4 (1.53A) EWL S4 -1 S4 -2 S4 -3 S4-3 S4-4 B 101 i 1 D 1 D 1 CD 1 D 1 D 1 D 11CD T EOL ST #5 (1.31A) S5 -1 S5-2 S5 -3 S5 -4 S5 -5 S5 -6 S5 -7 lA,6S,2B IA-) 1'C-\ WP WP Wr -1/2 _ r -- - 1 3S,t 3SJ 3SA 2 IIIIIIIIII 111 1111IIItlllllll IIIIIIIIIIIIIII IIIIIIIIIIIIIII Illllllllllllllllll FACP BPS#111 BPS #1 BPS #2 BPS #3 ,uuuB,lim uunuunw nnuuumtt 111111111111111 7=t L- -- 1 #12THHN GREEN 2 PHONE LINES FOR= EST1111 REMOTE STATION 200 NOTIFICATION = PANEL'4Hr, DEDICATE 1 #12THHN GREEN BREAKER 20A1P,120V CKT-4 (FACP.BPS /1,2,3) I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF i r ---- - - - - -- -------- 75CD - -- 75CD -- - 75CD EOL STRi45871.63A7 7 D 7 D -- ' 75CD 75CD EOL STR #18(1A) I I rgi C 7 CD 75 c, Ott I T SUITE-420 I TO BPS a 10 T' r i SUITE -450 I S18 -1 S18 -2 S18 -3 S18 -4 �543��S450 -2 S4550 -3 5450 -4 5450 -5 5450 -6 __ I ----------------- - - - - -- r - - - - -- - - - - --'� f - - - 75CD 75CD 75CD EOL STRT4 71 07A) - 75CD 75CD 75CD 75CD EOL $1R #410(1.tA) I 1 75CD � I S S T I SUITE -410 I ITO BPS 0 10 1r�1 � r� ' SUITE-430 I 5410 -1 5410 -2 5410 -3 S410-4 j L - - S430 -1 S430 -2 5430-3 5430 -4 --------- - - - - -J LL------------------- - - - - -- --------------- IS-) i7 D 75CD 75SD 75CD 75CD 75CD EOL STR#16(1.5A) ---- - - - --� T T T S,1A r - - - S iA S IA S IA 1 516 -1 516 -2 516 -3 S16-5 516 -6 516 -4 SUITE-440 L-------------------------- Islip] 110CD 110CD 1 CD 1 CD 1 D 1 CD 1tQCD 110CD 75CD IIIIIIIIIIIIIII IIIIIIIIIIIIIII Iltllllllllllll IIIIIIIIIIIIItI I JUNCTION T P T P P EOL ST #9 (1.75A) BPS#7 BPS #6 BPS #5 BPS #4 S9 -1 S9 -2 S9 -3 S9 -4 S9 -5 S9 -6 S9 -7 S9- EOL HORN #4 (0.2A) TIW - [ u11uu11nm uuuuuulu 11uuuu11lu uunuwlm 7 D 715D 7 D 715D 7 D 75CD 75CD EOL Si #10 (1.56A) r •7 r •-1 = - - - T T I II DD-4/ SUITE450 DD I I S,IB,2A SUITE-430 S10 -1 S10 -2 S10 -3 S10 -4 S10 -5 S10 -4A S10 -5A I II DD -4/4 DD-3/4 DD -6/4 DD-5/4 D D GREEN I 1 #12THHN GREEN 1 %1gTFp{N GREEN I 1 110CD 110CD 110CD 11000 110CD 110CD 110CD 110CD 110CD 110CD I D D I L-------- - --- -- J EOL sr #toA (2.OA) CR C SD I I R R PANEL -4Hr• DEDICATE S10A -1 SIGA -2 S10A -3 SIGA -4 SiGA -5 SIGA -6 S10A -7 S10A -8 S10A -9 S1M -10 -4/4C - /4 SD- - -2/4C -1/4 J BREAKER /13 20A,1P,120V r - - - - T - - - - - - - fi == as~ -•' ~�� i WP WT-2i/4 I DD -1/4 DD -2/41 SUITE -410 I SD -12/4 SUITE -420 SD -16/4 1 1'C ALL 3/4- CONDUIT UNLESS OTHERWISED NOTICED F Sa SD E I L - D U - - � - 1 I E D D 1 D S Tj D- 1 - SD -1- / 0 SD-6/S-7/4 S6 8/4 SD -9/4 S 8ID - - - - - - - - - - - - - - - - - - JJ.• - - - - - - - - - 4J -/4 F -2/4 F - 3/4S- 1/4 S - 15,1 4TH FLOOR PARKING 110CD 1 D 1 CD 110CD 1 D 1 CD 110CD� EOL ST #8 (2.OA) 12'X32'X6� f T Sl S6 -1 S6 -2 S6 -3 S6-4 S6 -5 S6 -6 S 7 B JLNE7ICrJ • r 1 �Dl D 1 C�110CD �IQCD �IC 110tD EOL ST #7 (1.53A) S7 -6 S7 -S7-7 B 1 D 110CD iiOCD 11DCD 110CD 1 JQCD 1 D T T EOL ST #8 (1.31A) S8 -1 S8 -2 S8 -3 S8 -4 S8 -5 58 -6 S8-r EOL HORN 13 (0.440A) WP WP WT -1/3 _ 3TH FLOOR PARKING EOL HORNf2 (0.440A) IS 1 EL ST#3 (2.OA) 1 CD 1 CD 1 D 1 CD 1 D 110CD 11(C 12'X12'X6' 1 P P P JUNCTION S3 1 S3 -2 S3 -3 S3 -4 S3 -5 S3 -6 S3-71H BOX B i 11XD 1 D 1 D 110CD 110CD EOL ST #4 (1.53A) EWL S4 -1 S4 -2 S4 -3 S4-3 S4-4 B 101 i 1 D 1 D 1 CD 1 D 1 D 1 D 11CD T EOL ST #5 (1.31A) S5 -1 S5-2 S5 -3 S5 -4 S5 -5 S5 -6 S5 -7 lA,6S,2B IA-) 1'C-\ WP WP Wr -1/2 _ r -- - 1 3S,t 3SJ 3SA 2 IIIIIIIIII 111 1111IIItlllllll IIIIIIIIIIIIIII IIIIIIIIIIIIIII Illllllllllllllllll FACP BPS#111 BPS #1 BPS #2 BPS #3 ,uuuB,lim uunuunw nnuuumtt 111111111111111 7=t L- -- 1 #12THHN GREEN 2 PHONE LINES FOR= EST1111 REMOTE STATION 200 NOTIFICATION = PANEL'4Hr, DEDICATE 1 #12THHN GREEN BREAKER 20A1P,120V CKT-4 (FACP.BPS /1,2,3) I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF ---- - - - --� T T T S,1A r - - - S iA S IA S IA 1 516 -1 516 -2 516 -3 S16-5 516 -6 516 -4 SUITE-440 L-------------------------- Islip] 110CD 110CD 1 CD 1 CD 1 D 1 CD 1tQCD 110CD 75CD IIIIIIIIIIIIIII IIIIIIIIIIIIIII Iltllllllllllll IIIIIIIIIIIIItI I JUNCTION T P T P P EOL ST #9 (1.75A) BPS#7 BPS #6 BPS #5 BPS #4 S9 -1 S9 -2 S9 -3 S9 -4 S9 -5 S9 -6 S9 -7 S9- EOL HORN #4 (0.2A) TIW - [ u11uu11nm uuuuuulu 11uuuu11lu uunuwlm 7 D 715D 7 D 715D 7 D 75CD 75CD EOL Si #10 (1.56A) r •7 r •-1 = - - - T T I II DD-4/ SUITE450 DD I I S,IB,2A SUITE-430 S10 -1 S10 -2 S10 -3 S10 -4 S10 -5 S10 -4A S10 -5A I II DD -4/4 DD-3/4 DD -6/4 DD-5/4 D D GREEN I 1 #12THHN GREEN 1 %1gTFp{N GREEN I 1 110CD 110CD 110CD 11000 110CD 110CD 110CD 110CD 110CD 110CD I D D I L-------- - --- -- J EOL sr #toA (2.OA) CR C SD I I R R PANEL -4Hr• DEDICATE S10A -1 SIGA -2 S10A -3 SIGA -4 SiGA -5 SIGA -6 S10A -7 S10A -8 S10A -9 S1M -10 -4/4C - /4 SD- - -2/4C -1/4 J BREAKER /13 20A,1P,120V r - - - - T - - - - - - - fi == as~ -•' ~�� i WP WT-2i/4 I DD -1/4 DD -2/41 SUITE -410 I SD -12/4 SUITE -420 SD -16/4 1 1'C ALL 3/4- CONDUIT UNLESS OTHERWISED NOTICED F Sa SD E I L - D U - - � - 1 I E D D 1 D S Tj D- 1 - SD -1- / 0 SD-6/S-7/4 S6 8/4 SD -9/4 S 8ID - - - - - - - - - - - - - - - - - - JJ.• - - - - - - - - - 4J -/4 F -2/4 F - 3/4S- 1/4 S - 15,1 4TH FLOOR PARKING 110CD 1 D 1 CD 110CD 1 D 1 CD 110CD� EOL ST #8 (2.OA) 12'X32'X6� f T Sl S6 -1 S6 -2 S6 -3 S6-4 S6 -5 S6 -6 S 7 B JLNE7ICrJ • r 1 �Dl D 1 C�110CD �IQCD �IC 110tD EOL ST #7 (1.53A) S7 -6 S7 -S7-7 B 1 D 110CD iiOCD 11DCD 110CD 1 JQCD 1 D T T EOL ST #8 (1.31A) S8 -1 S8 -2 S8 -3 S8 -4 S8 -5 58 -6 S8-r EOL HORN 13 (0.440A) WP WP WT -1/3 _ 3TH FLOOR PARKING EOL HORNf2 (0.440A) IS 1 EL ST#3 (2.OA) 1 CD 1 CD 1 D 1 CD 1 D 110CD 11(C 12'X12'X6' 1 P P P JUNCTION S3 1 S3 -2 S3 -3 S3 -4 S3 -5 S3 -6 S3-71H BOX B i 11XD 1 D 1 D 110CD 110CD EOL ST #4 (1.53A) EWL S4 -1 S4 -2 S4 -3 S4-3 S4-4 B 101 i 1 D 1 D 1 CD 1 D 1 D 1 D 11CD T EOL ST #5 (1.31A) S5 -1 S5-2 S5 -3 S5 -4 S5 -5 S5 -6 S5 -7 lA,6S,2B IA-) 1'C-\ WP WP Wr -1/2 _ r -- - 1 3S,t 3SJ 3SA 2 IIIIIIIIII 111 1111IIItlllllll IIIIIIIIIIIIIII IIIIIIIIIIIIIII Illllllllllllllllll FACP BPS#111 BPS #1 BPS #2 BPS #3 ,uuuB,lim uunuunw nnuuumtt 111111111111111 7=t L- -- 1 #12THHN GREEN 2 PHONE LINES FOR= EST1111 REMOTE STATION 200 NOTIFICATION = PANEL'4Hr, DEDICATE 1 #12THHN GREEN BREAKER 20A1P,120V CKT-4 (FACP.BPS /1,2,3) I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF 1'C ALL 3/4- CONDUIT UNLESS OTHERWISED NOTICED F Sa SD E I L - D U - - � - 1 I E D D 1 D S Tj D- 1 - SD -1- / 0 SD-6/S-7/4 S6 8/4 SD -9/4 S 8ID - - - - - - - - - - - - - - - - - - JJ.• - - - - - - - - - 4J -/4 F -2/4 F - 3/4S- 1/4 S - 15,1 4TH FLOOR PARKING 110CD 1 D 1 CD 110CD 1 D 1 CD 110CD� EOL ST #8 (2.OA) 12'X32'X6� f T Sl S6 -1 S6 -2 S6 -3 S6-4 S6 -5 S6 -6 S 7 B JLNE7ICrJ • r 1 �Dl D 1 C�110CD �IQCD �IC 110tD EOL ST #7 (1.53A) S7 -6 S7 -S7-7 B 1 D 110CD iiOCD 11DCD 110CD 1 JQCD 1 D T T EOL ST #8 (1.31A) S8 -1 S8 -2 S8 -3 S8 -4 S8 -5 58 -6 S8-r EOL HORN 13 (0.440A) WP WP WT -1/3 _ 3TH FLOOR PARKING EOL HORNf2 (0.440A) IS 1 EL ST#3 (2.OA) 1 CD 1 CD 1 D 1 CD 1 D 110CD 11(C 12'X12'X6' 1 P P P JUNCTION S3 1 S3 -2 S3 -3 S3 -4 S3 -5 S3 -6 S3-71H BOX B i 11XD 1 D 1 D 110CD 110CD EOL ST #4 (1.53A) EWL S4 -1 S4 -2 S4 -3 S4-3 S4-4 B 101 i 1 D 1 D 1 CD 1 D 1 D 1 D 11CD T EOL ST #5 (1.31A) S5 -1 S5-2 S5 -3 S5 -4 S5 -5 S5 -6 S5 -7 lA,6S,2B IA-) 1'C-\ WP WP Wr -1/2 _ r -- - 1 3S,t 3SJ 3SA 2 IIIIIIIIII 111 1111IIItlllllll IIIIIIIIIIIIIII IIIIIIIIIIIIIII Illllllllllllllllll FACP BPS#111 BPS #1 BPS #2 BPS #3 ,uuuB,lim uunuunw nnuuumtt 111111111111111 7=t L- -- 1 #12THHN GREEN 2 PHONE LINES FOR= EST1111 REMOTE STATION 200 NOTIFICATION = PANEL'4Hr, DEDICATE 1 #12THHN GREEN BREAKER 20A1P,120V CKT-4 (FACP.BPS /1,2,3) I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF 1 �Dl D 1 C�110CD �IQCD �IC 110tD EOL ST #7 (1.53A) S7 -6 S7 -S7-7 B 1 D 110CD iiOCD 11DCD 110CD 1 JQCD 1 D T T EOL ST #8 (1.31A) S8 -1 S8 -2 S8 -3 S8 -4 S8 -5 58 -6 S8-r EOL HORN 13 (0.440A) WP WP WT -1/3 _ 3TH FLOOR PARKING EOL HORNf2 (0.440A) IS 1 EL ST#3 (2.OA) 1 CD 1 CD 1 D 1 CD 1 D 110CD 11(C 12'X12'X6' 1 P P P JUNCTION S3 1 S3 -2 S3 -3 S3 -4 S3 -5 S3 -6 S3-71H BOX B i 11XD 1 D 1 D 110CD 110CD EOL ST #4 (1.53A) EWL S4 -1 S4 -2 S4 -3 S4-3 S4-4 B 101 i 1 D 1 D 1 CD 1 D 1 D 1 D 11CD T EOL ST #5 (1.31A) S5 -1 S5-2 S5 -3 S5 -4 S5 -5 S5 -6 S5 -7 lA,6S,2B IA-) 1'C-\ WP WP Wr -1/2 _ r -- - 1 3S,t 3SJ 3SA 2 IIIIIIIIII 111 1111IIItlllllll IIIIIIIIIIIIIII IIIIIIIIIIIIIII Illllllllllllllllll FACP BPS#111 BPS #1 BPS #2 BPS #3 ,uuuB,lim uunuunw nnuuumtt 111111111111111 7=t L- -- 1 #12THHN GREEN 2 PHONE LINES FOR= EST1111 REMOTE STATION 200 NOTIFICATION = PANEL'4Hr, DEDICATE 1 #12THHN GREEN BREAKER 20A1P,120V CKT-4 (FACP.BPS /1,2,3) I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF 3TH FLOOR PARKING EOL HORNf2 (0.440A) IS 1 EL ST#3 (2.OA) 1 CD 1 CD 1 D 1 CD 1 D 110CD 11(C 12'X12'X6' 1 P P P JUNCTION S3 1 S3 -2 S3 -3 S3 -4 S3 -5 S3 -6 S3-71H BOX B i 11XD 1 D 1 D 110CD 110CD EOL ST #4 (1.53A) EWL S4 -1 S4 -2 S4 -3 S4-3 S4-4 B 101 i 1 D 1 D 1 CD 1 D 1 D 1 D 11CD T EOL ST #5 (1.31A) S5 -1 S5-2 S5 -3 S5 -4 S5 -5 S5 -6 S5 -7 lA,6S,2B IA-) 1'C-\ WP WP Wr -1/2 _ r -- - 1 3S,t 3SJ 3SA 2 IIIIIIIIII 111 1111IIItlllllll IIIIIIIIIIIIIII IIIIIIIIIIIIIII Illllllllllllllllll FACP BPS#111 BPS #1 BPS #2 BPS #3 ,uuuB,lim uunuunw nnuuumtt 111111111111111 7=t L- -- 1 #12THHN GREEN 2 PHONE LINES FOR= EST1111 REMOTE STATION 200 NOTIFICATION = PANEL'4Hr, DEDICATE 1 #12THHN GREEN BREAKER 20A1P,120V CKT-4 (FACP.BPS /1,2,3) I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF r -- - 1 3S,t 3SJ 3SA 2 IIIIIIIIII 111 1111IIItlllllll IIIIIIIIIIIIIII IIIIIIIIIIIIIII Illllllllllllllllll FACP BPS#111 BPS #1 BPS #2 BPS #3 ,uuuB,lim uunuunw nnuuumtt 111111111111111 7=t L- -- 1 #12THHN GREEN 2 PHONE LINES FOR= EST1111 REMOTE STATION 200 NOTIFICATION = PANEL'4Hr, DEDICATE 1 #12THHN GREEN BREAKER 20A1P,120V CKT-4 (FACP.BPS /1,2,3) I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF I MARBLESLAB I FOOT SOLUTION 75CD 5CD 17i5�C1D 751D 75CD 1 7�p 75CD 75CD -� -� EOL ST #1 (2.1A) 51 -1 S1 -2 S1 -3 51.4 I FOOT SOLUTION I I 75C 1 75CD 75CD 175 75CD 52A -1 S2A -2 S2A -3 S2 -4 S2A -5 L---- - -'L -- 1 - - -- I JENNA VHITE I PILI CARRERA 1 7r 7r 1 7r 7XD 7r;f 1 75Cn 7.%D Fm S19 -1 S19 -2 L.5Lg-.! S19 -4 519 -5 519 -6 519 -7 2ND FLOOR PARKING A,1P TO FACP �• CR -11 r MARBLE 811J1B i IAj r - - - -iI r - - - -1 WT-1 CR -1 I DD -i F -6 1 E I I WP WP I I CT -1 CT -2 CT -3 CT -4 CT -5 SD SD SD so F F F F F F C D F SD -1 SD -2 Sp_3 SD -4 F -1 F -2 F -3 F -4 F -5 I F -6 I PREV NTER L - - - - - - J MAIN RISER B 1- - - - J L. - - - J VALVE 120V BELL WiTH SIGN B -1 P r - - - - - - - - - - - - - - - - - - - ACHED TOLOCK FCP TO FACP DR I D-2 F-7 SD -9 SD -B SD -7 SD -6 SD-5 I DR -1 1-- - - - - -- FOOT SOLUTION - - - - - - GROUND FLOOR PAF EXISTING FIRE ALARM RISER: N.T.S PERMIT AREA CORRIDOR FIRE ALARM PLAN 1/8"=V-0" SCOPE OF WORK: 1. THIS PROJECT IS A SUITE 525 THAT SHALL BE ADDED TO PLAZA 57 BLDG. MAIN PANEL EXISTING, EDWARDS EST 2. 2. SUITE WILL BE PROVIDED WITH SMOKE DECT, DUCT DECT, STROBES, AND HORN /STB PANEL IS EXISTING AS SHOWN AT RISER DIAGRAM. 3. CALCULATION WILL SHOW EFFECT ON EXISTING SYSTEM ONLY. FIRE ALARM NQU& 1. FIRE ALARM SYSTEM AND DEVICES TO BE UL LISTED, POWER LIMITED AND COMPATIBLE. 2. VISUAL ALARM PER A.N.S.I. A 117.1.4.26 AND F.B.C. 3. FIRE ALARM SYSTEM SHALL BE TOTALLY SUPERVISED. 4. UPON ACTIVATION OF ANY MANUAL OR AUTOMATIC DEVICE A RED LED SHALL ILUMINATE ZONE IN ALARM AT F.A.C.P., IN ADDITION A LOCAL AUDIBLE ALARM SHALL SOUND THE GENERAL EVACUATION SIGNAL. IF AN INITIATION OR SIGNALING DEVICE IS DISCONNECTED OR WIRING TO THOSE DEVICES ARE CUT AN APPROPRIATE YELLOW TROUBLE LED SHALL ILUMINATE AND AN AUDIBLE SIGNAL SHALL SOUND AT THE F.A.C.P. 5. THE SYSTEM SHALL HAVE BATTERY BACK -UP FOR 60 HOURS IN THE SUPERVISORY MODE AND 5 MINUTES MINIMUM IN ALARM. 6. THE INSTALLATION SHALL COMPLY WITH N.E.C. CHAPTER 760 AND N.F.P.A. 72. 7. ALL CEILINGS ARE LESS 10' UNLESS OTHERWISE NOTICE. 8. ALL COMPONENTS ARE LISTED FOR FIRE SERVICE USE. 9. THE EST2 PANEL PROVIDE A CONTROL OF 96 DETECTORS AND 94 MODULES PER CIRCUIT AND PER LOOPS.(SEE CUT - SHEET) 10. HEAT DETECTOR IN ELEVATOR SHAFT SHALL BE FIXED TEMPERATURE. 1357. 24" MAXIMUM DISTANCE FROM SPRINKLER HEAD. PER FIRE DEPARMENT HEAT SENSOR SHALL BE PART OF THE FIRE ALARM SYSTEM, CORRELATE TO A SMART RELAY TO ACTIVATE THE SHUNT TRIP FOR ELEVATORS UPON ALARM ON THE HEAT DETECTOR. FIRE ALARM MUST PROVIDE SUPERVISION FOR POWER AT THE SHUNT TRIP SYSTEM. 11. PROVIDE RELAY FOR FIRE HAT ACTIVATION AT ELEVATOR CAR, UPON ALARM AT SMOKE DETECTORS AT THE MACHINE ROOM & ELEVATOR SHAFT. 12. FIRE ALARM SYSTEM IS A REMOTE MONITORING STATION WITH 2 LINES DIALER. 13. NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B ", STYLE "Y" WITH AN AVERAGE OUTPUT OF 2 AMPS. 14. SEQUENCE OF ELEVETOR CAPTURE: A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. WIRE LEGEND: A = 2 #18 FPL (DATA)(UNSHIELDED)(BLUE) B = 2 #14 FPL (HORN)(UNSHIELDED)(RED) S = 2 #14 FPL (STROBE)(UNSHIELDED)(RED) MINIMUM COUNDUIT ALLOW IS 1/2" EMT MINIMUM 40% FILLED MAX. PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF PLANS ARE BASED ON CONTRACT DRAWINGS PROVIDED BY ENGINEER ON RECORD. TO THE BEST OF MY KNOWLEDGE. I'M PROVIDING THE DESIGN OF CONNECTIONS TO MAIN FIRE ALARM SYSTEM AND PERIPHERAL DEVICES PER MANUFACTURER RECOMMENDATION, INCLUDING DROP OF VOLTAGE AND BATTERY CALCULATIONS tom! �\.+ n NIIANH-DADE COUNTY FIRE DEPARWENT BLDG. PE MiT FIREALARM FIRE SUPPRESSION WATER MAIN EXT. DATES: :57• x�' • loic 13Y• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WrM NFPA 72; 70;101 EXISTING FIRE ALARM DEVICE LEGEND SYMBOL DESCRIPTION CATALOG NUMBER MOUNTING HEIGHT ®OR ®E SMOKE DETECTOR SIGA -PS / SIGA -SB ©D HEAT DETECTOR SIGA -HRS M- DD DUCT DETECTOR SIGA -SD ER CONTROL RELAY SIGA -CR MR MULTI - VOLTAGE CONTROL RELAYS MR -101 75CD 75CD 9 OR © STROBE (75CD) G1 F -VM 80" AFF TO BOTTOM 75CD 75CD OR A HORN /STROBE (75CD) G1 F -HDVM 80" AFF TO BOTTOM 110CD HORN /STROBE (11OCD) 757 -8A -T 80" AFF TO BOTTOM ®T 1wp D STROBE (110CD)(WEATHERPROOF) CS405-8A-TW/LKW- 1 /449 80" AFF TO BOTTOM [ ] 110CD D HORN /STROBE(11 OCD)(WEATHERPROOF) 757- 8A- TW /757A -WBW 80" AFF TO BOTTOM ❑F WP PULL STATION (WEATHERPROOF) SG -32 48" AFF TO CENTER 111 MANUALL PULL STATION SIGA -270 48" AFF TO CENTER ® FIRE ALARM JUNCTIONBOX SIZE AS NEEDED ® BOOSTER POWER SUPPLY BPS -10 ® FIRE ALARM CONTROL PANEL EST -2 (ANALOG CONTROLPANEL) EWL ELEVATOR WARNING LIGHT EL -1 72" AFF TO CENTER ® WATERFLOW/TAMPER MODULE SIGA -WTM ® TAMPER SWITCH BY OTHERS © FLOW SWITCH BY OTHERS ® CONTROL MODULE SIGA -CT1 ® SIGNAL MODULE SIGA -CC1 ® CONTROL MODULE SIGA -CT2 KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF KEY -PLAN N.T.S SE UENC,E OF OPERATION 1. SEQUENCE OF OPERATION SHALL AS FOLLOWS: A. OPERAT191 OF TAMPER SNATCH - SUPERVISORY INDICATION. B. C. OPERATiOV OF PULL STATION - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES. OPERATION OF SMOKE, HEAT, FLOW SWITCH - ALARM INDICATION, ACTIVATION OF AUDIOVISUAL AND VISUAL DEVICES, SHUTDOWN OF AIR HANDLING UNIT(S) IN THE AREA WHERE SIGNAL ORIGINATED. D. DUCT MOUI -LD DETECTOR PROVIDE ALARM INDICATION AT THE PANEL ONLY AND WILL NOT ACTIVATE HORN STROBE. 2. JURISDICTION: FINAL DECISION ON SYSTEM OPERATION DURING ALARM CONDITION AND LOCATION OF CENTRALIZED PERMANENTLY SUPERVISED LOCATION SHALL BE ESTABLISHED BY OWNER, FIRE MARSHALL AND RULING AUTHORITIES. CONTRACTOR SHALL COORDINATE OPERATION AND LOCATION OF DEVICES ACCORDINGLY BEFORE COMMENCING WORK. 3. TESTING: UPON COMPLETION OF THE INSTALLATION CONTRACTOR SHALL CONDUCT A COMPLETE TEST OF THE SYSTEM AREA AFFECTING THE TENANT SPACE IN QUESTION IN THE PRESENCE OF THE TENANT, LANDLORD AND FIRE DEPARTMENTS REPRESENTATiVE(S). ANY CORRECTIONS TO THE SYSTEM REQUIRED FOR FiNAL APPROVAL SHALL BE DONE. 4. SEQUENCE OF ELEVETOR CAPTURE (EXISTING): A. INITIATION OF SMOKE DETECTOR AT MACHINE ROOM SHALL CAPTURE THE ELEVATOR TO THE FIRST FL. IN ADDITION FIRE HAT AND ELEVATOR WARNING LIGHT AT ELEVATOR CAR SHALL BE ACTIVATED. B. INITIATION OF SMOKE DETECTOR AT FIRST FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE SECOND FLOOR. C. INITIATION OF HEAT DETECTOR (OPEN AREA) AT SECOND AND THIRD FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. D. INITIATION OF SMOKE DETECTOR FROM FOUTH AND FIFTH FLOOR ELEVATOR LOBBY SHALL CAPTURE THE ELEVATOR TO THE FIRST FLOOR. 5.- SEQUENCE OF OPERATION WITH REGARDS TO THE OPERATION OF THE FLOW BELL BE AS FOLLOWS: A FLOW BELL SHALL SOUND UPON THE ACTIVATION OF 'F�%S""`djV'�;"' "' (B) FLOW BELL SHALL SOUND THE ENTIRE TiME OF WATER 1 4.,�ie:.:`.• t' ~ '� I I `111 t; (C) FLOW BELL SHALL BE INCAPABLE OF BEING SILENCED - CEILING � -- ' ' '_ .- - ' _ ; ., • .. ,`: 3' -2" MIN. - (r,_I idtldiu,a> SMOKE DETECTOR A/C AND /OR FLUORECENT LIGHT t+- SMOKE DETECTOR MOUNTING DETAI N.T.S System No. C -AJ -1149 F Rating - 2 Hr T Rating - 0 Hr _ L Rating At Ambient - Less Than 1 CFWsq ft L Rating At 400 F -4 CFM /sq ft # I A 2 _.. _. .. _ _ .., s- . :11�! rtt�xrti'g **pow A wt�j\o SECTION A -A 1. Floor or ♦call #a m 0* - Tin 4-1/2 in N* reidaced IAA or ramnd ee4it (10D -150 pd) concrete. tld may obo be cwah lad d any LL CloeaT•ed Conaela Socks '. Max diem of operirq is 12 h See Concrete Bode (CAM arAM in Us Fn Reastorm Directsy for nonrs of msiia.•Mn. 2. TkMh Psiebarie - Ons mdalia pipe, cor" or hbing to be inetded wt% 1M firestop q- Pipe, -" or tubing to be r" erpported on both weds of floc or d crow*. TM amJw epos wind be 0 in. (point coated) to mar 1 -1/4 h The foln" types and ease of metdk pips, cmdub or tubig may be wed: A Steel Pipe -Nam 10 h dean (or safer) Sdsdle 10 (er heavier) ebd pipe. B. Cadet -Nam 4 h 6" (or wrier) aced dedrkd mddk 1Jisg or ew canal. C. Copper Tu big - Nom 4 h dam (or wialer) Type L (or heavier) Copper M Capper i P�pe -- Nom 4 h &n (or wdbr) %wW (or heavier) wiper 3. Poo" Material - Tin 3 in. Sclum of min 4 pd m wd wool bad emulation for nom 4 h dam (sid ender) POM widub or t&V and a min 4 n. ftknes of min 4 pd mnwd wool bat iroJotion for pipe yeoEer fiian nom 4 h ft% firmly paled into opediy m o pennonei gam Palrg mderSd to be scsaed from top Mace of floor or from bath w10 m of wd os reed to aaammdate tls replied Biclovse or fil mdarSd 4. Fill, Void or CoAty Moterlol' - Sedod - fin 1/2 h WdOm Of fill mat* oppid wft the onniAn. fish wlh the top surface of floor or both wfam of wol At the point d aarmd location bebeew POO and co ante, o mn 1/2 h darn beod of fill moto dial be applied at the caiaate /pipe in wIm on Os lop sefoce of floor and on both wfas Of voll. 1111.11 CONS11 CM f1VWAS. DN OF 1111 iNC - CPti M CP606 or FS-W Sealed 01ft L Rd" op* &*J wisn FS-OlE Soaked is wed). the u Cloedkaion Mahe ��q D=n= ='ij_=0w rPd r 171 la Cerl"w` / d RrsroP SYSTEMS Oxw6w 706 2 o C • 1� w M m Ul m Q U_ N Q J G O L 1 N z) Ll1 O W In lie- •• LA LA 3, 1 Z O d. (n LIJ 0 W Q 0 I 0� O 0 I.I. 2 Lt) I tea/ I.L. Q W 0� LL _O O O1 .� N M V l.- lLJ1 O ^ O f- M MI M N N 4-0 b N 00 E S U_ 00 In a--► 00 "ry O O ,tA 4, OJ r v ai O H LL � O d' �L- r4 W E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF E. BORJA P.E.# 36040 ELECTRICAL CAD DATE: 3/8/10 SCALE: N.T.S yk r''•xe4. EB# 000 7048' SHEET: Fe -1 OF