Loading...
09-605-007PLUMBING NOTES mmmwecxml PROVIDE r INSTALL ) ALL NECESSARY MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL PLUMBING SYSTEM AS SHOWN ON DRAWINGS AND HEREIN SPECIFIED. INSTALL IN ACCORDANCE FLORIDA BUILDING CODE AND LOCAL ORDINANCES. SCOPE OF •• PROVIDE r • WING COMP A. SANITARY COLI ECTION. WATER SUPPLY. B. HOT AND C. AIR CONDITIONING ` CONDENSATE. D. ROOF r- 1.3 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED. 1.4 VERIFY AT r: SITE ALL SPACE CONDITIONS, • PIPE, WITH FIXTURES, r EQUIPMENT PRIOR TO FABRICATION OR INSTALLATION. rr-r TO AVOID INTERFERENCE WITH OTHER TRADES. SUBMIT APPROVAL B •- PROCEEDING WITH THE PURCHASE i. INSTALLATION OF • - AND 1.6 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS ANr WORKMANSHIP FOR A PERIOD • ONE .O DATE OF • 2.0 MATERIAL 2.1 PROVIDE SHUT-OFF VALVES FOR EACH FIXTURE AND WATER HAMMEL WHERE SHOWN r WHERE REQUIRED O. PROPER ARRESTOR PERFORMANCE • EQUIPMENT 2.2 PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING TO OF DISSIMILAR METALS. USE CLAMPS AND FASTENERS OF OR ISOLATE THEM FROM PIPING AND SLABS TO PREVENT CORROSION. PIPIN DOMESTIC i AND COLD COPPER TUBING r OR T' WITH SOLDER JOINTS. • BRONZE PROVIDE PRE-MOLDED FIBERGLASS INSULATION • HOT WATER LINES. 2.3.2 SANITARY WASTE, VENT, AND ROOF DRAINAGE CAST IRON PIPING NO-HUB 2.3.3 A/C CONDENSATE: ABOVE FLOOR: •rr D.W.V. PIPE WITH ARMFLEX INSULATION. BELOW ••- PVC SCHEDULE • • INSULATE ALL OVERHEAD HORIZONTAL INSULITIOV. PLUMBING FIXTURE SCHEDULE THE, RICHARD-B'HANDON COMPANY OFFICE CONDO BUILDOUT Jas NUMBER ¢- �a 0- ------- MEN Em :NT. T 'M. UA r r ' .,,• r :,. • J kl. K i. JL l y i • • i W4 a] kyj ,. i � l t. it 'l t. ►: �.r" ii