General Terms and Conditions
Scope of Work
ARS Environmental's inspections are limited and non - destructive in nature. Any conditions or materials which were not able to be visually
observed on the surface, or in easily accessible areas, were not inspected and may differ from those observed. It was not within the scope of
this investigation to remove surface materials to investigate portions of the structure or materials which lay beneath the surface. Our selection
of sample locations and frequency is based upon our observations and the assumption that like materials in the same area are homogeneous.
This inspection report is the result of a diligent search of the facility for Asbestos Containing Building Materials (ACBM). The purpose of this
inspection was to identify those materials which may pose a health hazard to occupants of a building and impart future liability to the owners
and insurers of the property. However, we do not claim to have identified all of the asbestos containing building materials present in the
facility. Materials such as underground pipes, any material inside walls, ceilings, floors, or other enclosed and inaccessible areas were not
sampled and are not covered in this report. This report is designed to aid the building owner, architect, construction manager, general
contractor, and potential asbestos abatement contractor in locating asbestos containing building materials. Under no circumstances is this report
to be utilized as a proposal or a project specification document. This report is based upon conditions and practices observed at the property
and information made available to the surveyor. This report does not intend to identify all hazards or unsafe practices, nor to indicate that other
hazards or unsafe practices do not exist at the premises. In the event that demolition or renovation is deemed necessary, parties shall comply
with all applicable laws, ordinances, rules, and regulations of federal, state, and local governmental agencies, including any National Emissions
Standard Hazardous Air Pollutants (NESHAP) notification requirements.
Right of Entry
The client will provide for right of entry to ARS Environmental's personnel in order to complete the above referenced work.
Invoices
ARS Environmental will submit invoices to client upon completion of services.
Ownership of Documents
All reports, field data, field notes, laboratory tests data, calculations, estimates, and any other documents prepared by ARS Environmental as
instruments of service shall remain the property of ARS Environmental.
Assumptions and Limitations
The results, findings, conclusions, and recommendations expressed in this report are based only on conditions which were observed during
inspections by this report. ARS Environmental makes no representation or assumptions as to past conditions or future occurrences.
Assigns
Neither the client nor ARS Environmental may delegate, assign, sublet or transfer his duties or interest in this agreement without the written
consent of the other party.
Roof Cuts
To obtain accurate information in a roof investigation, roof cuts approximately four inch 4" squares, may be deemed necessary. It is the
responsibility of our client to make appropriate repairs to these roof cuts, using materials consistent with the roofing system and in accordance
with any existing material manufacturer's warranties. A roofing contractor or maintenance personnel selected by our client should be on the
roof to make any necessary repairs at the time the samples are being obtained. Although, every attempt will be made to make these repaired
areas water tight, ARS Environmental will in no way be responsible for any water damage to the roofing system, building, or it's contents
resulting from ARS Environmental temporary repairs.
Disclaimer
If in the course of a renovation or demolition activity, suspect materials become exposed, ALL FURTHER ACTIVITY SHOULD
IMMEDIATELY CEASE AND THE STATUS OF THE MATERIAL SHOULD BE DETERMINED BEFORE PROCEEDING.
10097 Cleary Boulevard a #305 • Plantation, FL 33324 • !'hone: 954- 227 -2602 • Fax: 966 - 916 -5110