11-358-010COLUMN STRAPPING SCHEDULE
A INDICATE.^, TYFE OF STUD
T1 INDICATES TYPE OF TIE DOWN STRAP
* INDICATES WITH RIDGE BEAM BEARING
STIFFENER ( SEE RIDGE BEAM NOTES
FOR SPECIFICATIONS)
COLUMN STRAPPING SCHEDULE
a� (2) 2x4 ` SPF #2 THIS HALF &2 2x4 SPF #2 EACH HALF
CO (3) 2x4 SPF #2 THIS HALF DD (3) 2x4 SPF #2 EACH HALF
0 (4) 2x4 SPF #2 THIS HALF D (4) 2x4 SPF #2 EACH HALF
(D (5) 2x4 SPF #2 THIS HALF &5) 2x4 SPF #2 EACH HALF
O (6) 2x4 SPF #2 THIS HALF O (6) 2x4 SPF #2 EACH HALF
O (7) 2x4 .SPF 02 THIS HALF O (7) 2x4 SPF #2 EACH HALF
(8) 2x4 SPF #2 THIS HALF &8) 2x4 SPF #2 EACH HALF
NOTES:
1. ALL COLUMN STUDS SHALL BE NAILED TOGETHER PER NDS AND
FASTENED TOGETHER WITH 100% PVA GLUE COVERAGE.
2. COLUMN STUDS SHALL NOT BE NOTCHED OR BORED.
3. INSTALL ONE TIE DOWN STRAP FROM RIDGE BEAM TO COLUMN AND
FROM COLUMN TO FLOOR RIM JOIST FOR EACH STUD OF COLUMNS. '
(ie: 3 STUD COLUMN WILL REQUIRE 4 TIE DOWN. STRAPS)
4. STRAPS SHALL NOT BE OVERLAPPED OR DOUBLED UNLESS SPECIFIED
OTHERWISE.
TIE DOWN STRAP DESCRIPTION,
Ti 20 GA. X 1 - 1/2" GALV. STEEL STRAP WITH (7) 0;148'v° X 3" NAILS
EACH END. TWO 26 GA. X 1.5" GALV. STEEL STRAPS MAY BE
SUBSTITUTED FOR ONE 20 GA: X 1 1/2" STRAP,, NAILS MUST
PENETRATE 2" MININUM INTO ALL MEMBERS. PENETRATION MAY
BE REDUCED TO 1 - 1/2" IF 8 NAILS ARE USED IN LIEU OF 7.
IN NO CASE SHALL SPLITTING OF WOOD BE PERMITTED.
L4 3 ALA rt M tit AM - • L '
368 �/ N ,A1 '
ELECTRICAL SCHEDULE PANEL "A"
CIRCUIT
NOMENCLATURE
CF)`
WIRE SIZE
CU. NM.
W /G.
■
Or-M
do
60A (2P)
HACR TYPE
O•r-
o NC
e- N
LIGHTS
Qo 0
0
�
4A -6A
w
I 20A.,
Z
oo o-4
a
°
JL
O
u.•
F
U
n
O
c
Z
'
c
w
C
L4 3 ALA rt M tit AM - • L '
368 �/ N ,A1 '
ELECTRICAL SCHEDULE PANEL "A"
CIRCUIT
NOMENCLATURE
BREAKER
(AMPS)
WIRE SIZE
CU. NM.
W /G.
1,3A
HVAC DISCONNECT
**
60A (2P)
HACR TYPE
N'Y'SE
W / #10 GRND
2A
LIGHTS
I 20A
12 =2 NM
4A -6A
RECEPTS & FAN
I 20A.,
12 -2 NM
ELECTRICAL SCHEDULE PANEL "B"
CIRCUIT
NOMENCLATURE
BREAKER
(AMPS)
WIRE SIZE
CU. NM.
W /G.
1,313
HVAC DISCONNECT
**
60A (2P)
HACR TYPE
6 -2 SE
W / #10 GRND
2B
LIGHTS
20A
12 -2 NM
4B,5B
RECEPTS & FAN
20A
12 -2 NM
LHV, 3/4"
3/4"
WC
3/4
_ 3 ,
T &P
7n n-Al VAS vF
W / H
INSTALL AT FACTORY
3"
CIO
Z W
O ~
L Y 0
N 0
y�
al
O
a
t
O
w
a!
F—
U
CU
U
CCU .-
1-
o
U)
(c)
J
0
L...1
CITY OF SOIJ rH N1IA s1
BUILDING �GD_
DEPT.
O
�
8 RU r1tA D SECTION
"APPROVED W. J
,r
ie-
C `
1 5 RECEPTS @ 180 VA / 1000 2.70 11 RECEPTS @ 180 VA / 1000 1.98
3" TO WASTE TERM.
E.RM.
EEMAX HEATER 6.5 KW - - -- WATER HEATER 4.5 SUPPLY LINE IS BASED
@ @ KW 4.5 ON AN ASSUMED
-- FAN .3 KW X 1.25 - -- _L FAN @ .3 KW X 1.25 .75 AVAILABLE PRESSURE OF 46 TO 60 PSI AT MAIN
INLET. ALL STUB-UPS - _ .�__, ��� REVISION D ! .`
P 1/2 >r�..�:,� ATE.. -:, •: � DATE.. 04- 05 -2011
HVAC 10.5 HVAC 10.5
ALL SINK & LAWS I f2OVIDEED WITH 1 1/2
OTHER - OTHER _ TRAPS WITH SLIP JOINT CONNECTIONS.
-
ECTIONS. SUPPL? .�.
TOTAL 16.97 KW q .: ' `•• � DRAWN: R.C.S.
) • :r
PLUMBING. RISER � . � � . ,., � . • . g
DI�•,V
' �m, •. 9
TOTAL / 240 X 1000 70.71A 10110&00
f
TOTAL 21.5 KW . , _ :
SCALE.. ,z, r a ...�
INSTALL 100 AMP PANEL 120 / 240 1
.. _ NTS - ,. , .� � C. • .. JOB
V � TOTAL / 240 X 1000 89.60 A - � m•, ,
INSTALL 100 AMP PANEL 120 / 240V 1 UT
PEF SHEET 6, , .�..,�.,�� s0 � NO.
1
.n „ire. ... r..:.....
t
ED i