Loading...
14-1064-007a Q a .L 0 a .- 3 cn r m ul a`a a a n a s 0 0 V) N I, i _f N �(V 0 .. GENERAL NOTES: 1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. DRAWINGS ARE NOT TO BE SCALED. 2. SHOULD CONTRACTOR FIND ANY DISCREPANCY IN DIMENSIONS OR BETWEEN PLANS AND SPECIFICATIONS AND ACTUAL OR EXISTING CONDITIONS, HE SHALL NOTIFY ARCHITECT /ENGINEER IMMEDIATELY IN WRITING FOR POSSIBLE RE- DESIGN PRIOR TO EXECUTION OF THE WORK. 3. ACCESSIBILITY FOR THE PHYSICALLY HANDICAPPED: ALL BUILDING COMPONENTS SHALL COMPLY WITH ALL THE REQUIREMENTS OF ACCESSIBILITY CODE FOR THE PHYSICALLY HANDICAPPED AS PER STATE OF FLORIDA, CHAPTER 553, PART V, THE AMERICAN CODE (LATEST EDITION AND AMERICANS WITH DISABILITIES ACT (ADA) LATEST EDITION. 4. CONTRACTOR SHALL COORDINATE ADDITIONAL TENANT REQUIREMENTS SUCH AS REFRIGERATION EQUIPMENT, FLOOR DRAINS, ROOF OPENING FOR EXHAUST FANS, ETC., WITH TENANT IMPROVEMENT DRAWINGS, PRIOR TO GYPSUM WALLBOARD INSTALLATION. 5. VERIFY ALL DIMENSIONS IN FIELD BEFORE FABRICATION OF ANY WORK OR BUILT -IN ITEM OR EQUIPMENT. 6. WHEN A DETAIL, DIMENSION OR REFERENCE IS INDICATED AS "TYPICAL" IT APPLIES TO ALL SIMILAR SITUATIONS, WHETHER INDICATED OR NOT, UNTIL IT IS CHANGED BY ANOTHER DETAIL, DIMENSION OR REFERENCE. 7. GUARANTEE AND WARRANTY: THE CONTRACTOR SHALL WARRANT AND /OR GUARANTEE ALL MATERIAL AND WORKMANSHIP TO BE FREE FROM DEFECTS AND IN PERFECT CONDITION, INCLUDING BUT NOT LIMITED TO : HARDWARE, FIXTURE, MECHANICAL, AND ELECTRICAL EQUIPMENT AND INSTALLATION FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. ALL MATERIAL USED ON THIS PROJECT WILL BE NEW. AT THE END OF THE WORK, THE CONTRACTOR SHALL FURNISH THE OWNER WITH ALL WRITTEN EQUIPMENT /FIXTURE GUARANTEES AND /OR WARRANTIES FURNISHED BY THE MANUFACTURER FOR ALL EQUIPMENT /FIXTURES WHETHER OR NOT SUCH GUARANTEE IS REQUIRED IN THE PLANS AND SPECIFICATIONS. COPIES OF PURCHASE ORDERS OR INVOICES SHALL BE FURNISHED FOR GUARANTEE AND WARRANTY PURPOSES UPON THE REQUEST OF THE OWNER. IN ADDITION, THE CONTRACTOR SHALL FURNISH TO THE OWNER, ALL OPERATION, MAINTENANCE AND REPAIR MANUALS SUPPLIED BY THE MANUFACTURER AND SHALL CLEARLY MARK ON ALL ELECTRICAL PANELS THE CIRCUITS DESIGNATING AREAS AND EQUIPMENT SERVED. CONTRACTOR SHALL PROVIDE THE FOLLOWING WRITTEN GUARANTEE /WARRANTIES BY THE MANUFACTURER. 7.1 NEW AIR CONDITIONING - 5 YEAR LABOR AND MATERIAL 7.2 ALL OTHER WORK - 2 YEAR LABOR AND MATERIAL 7.3 FINAL ACCEPTANCE: NO LATER THAN 30 DAYS PRIOR TO EXPIRATION DATE OF GENERAL CONTRACTOR'S GUARANTEE PERIOD, THE GENERAL CONTRACTOR SHALL NOTIFY (BY REGISTERED MAIL) THE OWNER AND ARCHITECT THAT THE GUARANTEE PERIOD IS ABOUT TO EXPIRE AND A FINAL INSPECTION TO NOTE ANY DEFECTS AND DEFICIENCIES HAS BEEN SCHEDULED. THE WORK WILL NOT BE ACCEPTED UNTIL SAID DEFICIENCIES /DEFECTS HAVE BEEN CORRECTED. THE GENERAL CONTRACTOR'S GUARANTEE PERIOD SHALL BE EXTENDED UNTIL SUCH TIME AS GUARANTEE REPAIRS HAVE BEEN COMPLETED AND ACCEPTED IN WRITING. FAILURE TO NOTIFY OR SCHEDULE WITH OWNER /ARCHITECT OF SUCH INSPECTION WILL EXTEND THE GUARANTEE PERIOD UNTIL INSPECTION IS PERFORMED. rr •r• , r r ••r r ',, SC: 3/16" = 1' -0" `3: zi4 8. SUBSTITUTIONS WILL ONLY BE ENTERTAINED BY THE ARCHITECT /ENGINEER WITHIN 10 DAYS AND ONLY WHEN THEY ARE ACCOMPANIED BY EXPLANATORY NOTE STARTING: 8.1 REASON FOR SUBSTITUTION. 8.2 ADJUSTMENT TO CONTRACT COST AND CONTRACT TIME SCHEDULE. 8.3 AVAILABILITY ASSURANCE. 8.4 SHOP DRAWINGS/ BROCHURES /CATALOG CUTS, SUBSTANTIATING "EQUAL" QUALITY AN /ORPERFORMANCE TO THE ARCHITECT'S /ENGINEER'S SATISFACTION. PROPOSED SUBSTITUTION IS SUBJECT TO OWNER /ARCHITECT'S APPROVAL AND MAY NOT BE GRANTED. 9. SHOP DRAWING: CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING (3) THREE PRINTS OF THE SHOP DRAWINGS AND MANUFACTURER'S BROCHURE FOR THE ITEMS LISTED BELOW ON A TIMELY BASIS SO AS TO ALLOW FOR PROPER PROCESSING BY THE ARCHITECT /ENGINEER WITHOUT CAUSE OF DELAY TO THE WORK. SHOP DRAWINGS REQUIRED TO BE SUBMITTED TO THE ARCHITECT /ENGINEER FOR APPROVAL PRIOR TO THE FABRICATION /ERECTION: 9.1 HARDWARE SCHEDULES 9.2 HVAC EQUIPMENT 9.3 ELECTRICAL LIGHT FIXTURES 9.4 PLUMBING FIXTURES 9.5 HOLLOW METAL AND WOOD DOORS 10. SAMPLES: CONTRACTOR SHALL SUBMIT /PROVIDE TO THE ARCHITECT /ENGINEER FOR APPROVAL PRIOR TO PURCHASE/ EXECUTION, THE SAMPLE AND MANUFACTURER'S BROCHURES FOR ITEMS LISTED BELOW: (SEE DRAWINGS FOR ANY ADDITIONAL REQUIREMENTS). 10.1 STUCCO FINISH* 10.2 CERAMIC TILE (SAMPLE SHOWING COLOR VARIATION AND RANGE) BASIC COLOR AND ACCENT TILE. (20F. EACH) 10.3 FINISH HARDWARE 10.4 BASEBOARD 10.5 FRAMES AND PAINTING 10.6 ALL RESTROOM FIXTURES 11. CLEANING 11.1 DURING CONSTRUCTION: OVERSEE CLEANING AND ENSURE THAT BUILDING GROUNDS ARE MAINTAINED FREE FROM ACCUMULATIONS OF WASTE MATERIALS, RUBBISH, AND DEBRIS FROM THE SITE AND LEGALLY DISPOSE OF AT PUBLIC OR PRIVATE DUMPING AREA OFF THE JOB SITE. BROOM CLEAN INTERIOR BUILDING AREAS. 11.2 SPECIAL CLEANING : BESIDES THE GENERAL BROOM CLEANING, DO THE FOLLOWING SPECIAL CLEANING AT COMPLETION OF WORK (FOR ALL TRADES), USING ONLY CLEANING MATERIALS RECOMMENDED BY MANUFACTURER OF SURFACE TO BE CLEANED, AND ONLY ON SURFACES RECOMMENDED BY CLEANING MATERIAL MANUFACTURER. REMOVE PUTTY STAINS AND PAINT FROM ALL GLASS AND MULLIONS AND POLISH SAME. CARE SHALL BE TAKEN NOT TO SCRATCH GLASS. REMOVE ALL MARKS, STAINS, FINGERPRINTS AN OTHER SOIL AND /OR DIRT FORM ALL PAINTED, DECORATED AND STAINED WORK. CLEAN AND POLISH ALL HARDWARE AND FIXTURES FOR ALL TRADES: INCLUDING REMOVAL OF STAINS, DUST, PAINT, ETC. UPON COMPLETION. LEGEND: Po EXISTING STRUCTURAL MEMBERS EXISTING BLOCK WALL NEW METAL STUD PARTITION (# } NEW DOOR SYMBOL Ln DENOTES EXISTING DOOR �j TO REMAIN cn NEW WINDOW SYMBOL NEW PARTITION SYMBOL hUA11iii-DADE hUl'­T-l-f °4 FIRE DEPARTIVIE-PqT r ."TION MAY "QUIRE A BOARD APPEARANCE) 11 ! 1 1 1' ♦ 1 1 1 p` r W ! a 12. CONTRACTOR TO ENSURE THAT EXISTING BUILDING STAYS FULLY OPERATIONAL DURING ALL STAGES OF CONSTRUCTION. CONTRACTOR SHALL NOT INTERRUPT TRAFFIC FLOW AND ENTRANCE TO THE BUILDING. OPERATIONS OF EXISTING TENANTS SHALL NOT BE DISTURBED. 13. CONTRACTOR SHALL TAKE ALL POSSIBLE MEASURES TO ENSURE THAT THE PATRONS, TENANTS, AND ITS EMPLOYEES ARE NOT IMPACTED OR INJURED DUE TO ANY ACTION OF CONTRACTOR, ITS EMPLOYEES, VENDORS AND BY HIS SUB - CONTRACTORS. 14. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FROM THE OWNER FOR AREAS TO BE USED FOR CONTRACTOR'S STORAGE, AND STAGING. 15. CONTRACTOR SHALL NOT GENERATE DUST BETWEEN THE HOURS OF 9:00 A.M. TO 10:00 P.M. 16. CONTRACTOR SHALL NOT CAUSE DISRUPTION OF EXISTING UTILITIES SERVICE TO EXISTING TENANTS. 17. ALL WORK AT THE WALLS AND INSIDE THE BUILDING SHALL BE FULLY COORDINATED WITH THE OWNER BY THE CONTRACTOR. SEEK WRITTEN APPROVAL PRIOR TO PROCEEDING WITH ANY WORK IN AND AROUND THE BUILDING. CONTRACTOR SHALL COMPLY WITH ALL RESTRICTIONS IMPOSED BY BUILDING'S OWNER. 18. CONTRACTOR MUST FAMILIARIZE ITSELF WITH ALL EXISTING CONDITIONS AT THE PROJECT SITE PRIOR TO SUBMITTING BID. EXISTING CONDITIONS NOT SHOWN ON DRAWING IS NOT JUSTIFICATION FOR CHANGE ORDERS. CONTRACTOR IS TO COMPLETE THE ENTIRE PROJECT, AS SHOWN, AND PERFORM ALL WORK STRONGLY ADVISED TO VISIT THE SITE MANY TIME PRIOR TO COMMENCING WORK TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS, SHOWN OR NOT HEREIN, THAT MAY RESULT IN ADDITIONAL COST TO THE CONTRACTOR. 19. CONTRACTOR SHALL MAKE ITS OWN ARRANGEMENTS FOR TRASH PICK UP. DO NOT USE BUILDING'S DUMPSTERS FOR TRASH. B MIAMI-DADE COWITY FIRE M. W_ ~ � M O W IZ Ln Q 4) ;= aG cn C c� � � �C• M co .. o = t% w w o it .� L9"o VIEIA, /R& #1- 6Q41e!` 0 • .. -6 .. i CL i i ` i 0 .. �0 1 r) • Cie Lu • • • • ` _ LLU E4 ry go • �. • • . L9"o VIEIA, /R& #1- 6Q41e!` r' W o DATE: 08/22/14 SCALE: AS SHOWN DWN. BY: CHKD. BY: R.P.L R.CA DSGN. BY. CHKD. BY: R.CA R.CA PROJECT NO: 12.127 17:72\STifill, Sheet . 4 of 14 r�lll -6 `` i CL i 0 Ln Lu �0 1 r) � Cie Lu LLU . r' W o DATE: 08/22/14 SCALE: AS SHOWN DWN. BY: CHKD. BY: R.P.L R.CA DSGN. BY. CHKD. BY: R.CA R.CA PROJECT NO: 12.127 17:72\STifill, Sheet . 4 of 14