Loading...
14-998-016- O.S. &Y. GATE VALVE - TAMPER SWITCH - ELECTRIC WATER FLOW SWITCH - PRESSURE GAUGE & COCK TO AUTOMATIC SPRINKLER SYSTEM ---, GLASS _ TEST VALVE SECTIONAL DRAIN VALVE UNION W/ CORROSION RESISTANT ORIFICE GIVING FLOW EQUAL TO SMALLEST A/S DRAIN SPRINKLER ORIFICE IN SYSTEM. STANDPIPE OR SPRINKLER MAIN. SEE FLOOR PLAN DWGS. FOR SIZES. EXISTING A /S ZONE CONNECTION DETAIL l% SCALE: N.T.: 1" RETURN BEND DROP TO SPRINKLER HEAD IN CEILING \\—SPRINKLER BRANCH PIPING `HUNG CEILING SPRINKLER HEAD LOCATED IN CEILING AS SPECIFIED TYPICAL SPRINKLER DROP SCALE: N.T.S. PHILLIPS CONCRETE FASTENER I.T.T. GRINNELL (RED HEAD) ALL THREAD HANGER ROD SZE DIMENSION 1 IN. 1/8 IN. 1 1/4 IN. 1/8 IN. 1 1/2 IN. 1/8 M. 2 IN. 1/4 IN. 21/2 IN. 1/4 IN, D DIMENSION &—L I PIPE HANGER RING PIPE I.T.T. GRINNELL FIG.260 PIPE HANGER RING I.T.T. GRINNELL FIG. 69 PIPES 3" & SMALLER PIPES 4" & LARGER U.L. /F.M. APPROVED CON CRETE I N SER T PIPING HANGER DETAIL SCALE: N.T.S. PARTIAL NEW WO SCALE: 1/4" = 1' -0" NEW KEY NOTE SYMBOL DESCRIPTION OEXISTING SPRINKLER HEADS TO BE REMOVED AND REPLACED LOCATION WITH NEW QRS SEMI - RECESSED TYPE IN THIS AREA AS SHOWN. OPIPE NEW 1" TO NEW SPRINKLER HEAD FROM THIS AREA AS ' SHOWN, CONTRACTOR TO COORDINATE ALL SHUT DOWN WITH it Y 4' 60 8' OWNER. OEXISTING EXPOSED PIPING AND SPRINKLER HEAD TO BE REMOVED. 12 -0 12 -0 N/A N/A N/A RUN 1 SPRINKLER PIPE ABOVE THE CEILING TO NEW HEAD AS N/A REQUIRED. COORDINATE ALL SHUT DOWN WITH OWNER. ®EXISTING SPRINKLER HEADS AND ALL EXPOSED PIPING IN THIS 5-6 ROOM TO BE REMOVED AS REQUIRED. COORDINATE SHUT DOWN 7 -0 8-0 N/A N/A N/A WITH OWNER. OF EXISTING FLOOR CONTROL ASSEMBLY IS LOCATED OLOCATION INSIDE THE STAIRWELL DUE WEST OF SCOPE OF PROJECT. CONTRACTOR TO COORDINATE ALL SHUT DOWN WITH OWNER. ELF SHORT STRAP HANGER VFASTENER SHORT STRAP MAXIMUM DISTANCE BETWEEN HANGERS (ft) NOTE: ALL PIPE SHALL BE HUNG AS PER NFPA 13 do MANUFACTURER INSTRUCTIONS LOCATION REPLACE ALL SPRINKLER HEADS WITH NEW'QRS SEMI- RECESSED TYPE NOMINAL DIAMETER (INCHES) PIPE ' 1' it it Y 4' 60 8' STEEL 0) N/A 12 -0 12 -0 12 -0 12 -0 N/A N/A N/A STEEL (SOH 40) N/A 12 -0 12 -0 15-0 15-0 15-0 15-0 15-0 PLASTIC 5-6 6-0 6 -6 7 -0 8-0 N/A N/A N/A RK PLAN - FIRE PROTECTION GENERAL NOTE: 1. ALL NEW SPRINKLER HEAD LAYOUT TO BE DESIGNED FOR LIGHT HAZARD. 2. CONTRACTOR SHALL MAINTAIN ALL WALL FIRE RATING. 3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE PROTECTION HYDRAULIC CALCULATIONS. SPRINKLER HEAD LEGEND SYMBOL MFG. K -FACT TEMP LOCATION REPLACE ALL SPRINKLER HEADS WITH NEW'QRS SEMI- RECESSED TYPE VIKING 5.6 165^ ALL AREA WITHIN SCOPE OF WORK NEW CONSTRUCTION �—� NEW CONSTRUCTION LEGEND SYMBOL DESCRIPTION • NEW SPRINKLER HEADS O-• PIPE NEW 1" SPRINKLER PIPE TO NEW HEADS X—• EXISTING SPRINKLER HEADS TO BE REMOVED, RUN NEW PIPE TO NEW HEAD EXISTING TO REMAIN NEW CONSTRUCTION �—� CONNECT TO EXIST. AT THIS POINT h FIRE PROTECTION GENERALfVO�"�S ;-- 1. ALL FIRE PROTECTION SYSTEM SHALL BE IN COMPLIANCE WITH THE LOCAL FIRE CODES AND ORDINANCES AND INSTALLED IN ACCODANCE WITH THE LATEST CODES AND STANDARDS. A. NFPA -13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS. (2007). B. NFPA -101 LIFE SAFETY CODE. (2009) C. FLORIDA FIRE PREVENTION CODE. (2010) D. FLORIDA BUILDING CODES (2010) 2. MAKE ALL OFFSETS REQUIRED AS PER JOB CONDITIONS. 3. CONTRACTOR TO PROVIDE AND TURNOVER TO THE OWNER AT LEAST (6) SPARE SPRINKLERS OF SAME TYPE AND TEMPERATURE RATING BEING INSTALLED. 4. ALL SPRINKLER HEADS SHALL BE CENTERED AND PRESENT A NEAT AND BALANCED CEILING PATTERN UNLESS SHOWN OTHERWISE. S. CONTRACTOR SHALL COORDINATE WITH STRUCTURE AND OTHER TRADES BEFORE INSTALLING SPRINKLER WORK. 6. INSTALL PIPING TIGHT TO STRUCTURE WHERE POSSIBLE. Z SPRINKLER SYSTEM TO BE INSTALLED BYA STATE CERTIFIED FIRE PROTECTION CONTRACTOR. 8. ALL PRODUCTS ASSOCIATED WITH THE SPRINKLER SYSTEM SHALL BE UNDERWRITERS LABORATORIES (UL) LISTED AND FACTORY (FM) APPROVED. EIRE PROTECTION SPECIFICATIONS THE FIRE PROTECTION SYSTEM SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH NFPA 13 2007. CONTRACTOR SHALL PROVIDE SPRINKLER SHOP DRAWINGS AND HYDRAULIC CALCULATIONS FOR SUBMISSION TO BLDG. DEPT. FOR PERMIT REVIEW AS PART OF THIS PROJECT. ALL PRODUCTS ASSOCIATED WITH THE SPRINKLER SYSTEM SHALL BE UNDERWRITERS LABORATORIES (UL) LISTED AND FACTORY (FM) APPROVED. PIPE INTERIOR PIPE AND FITTINGS: 1. SCHEDULE 40 ASTM -135, ELECTRIC- RESISTANCE WELDED STEEL PIPE. 2. THREADABLE THINWALL, ASTM -135, ELECTRIC RESISTANCE WELDED BY BERGER, ALLIED, OR BULL MOOSE. FITTINGS: A. MECHANICAL COUPLINGS: ROLL OR CUT GROOVE RIGID TYPE BY VICTAULIC, SPRINK OR GRINNELL. B. CLASS 125 OR CLASS 250 CAST IRON SPRINKLER FITTINGS - SCREWED, FLANGED, OR GROOVED -END. C. ALL FITTINGS SHALL BE BY THE SAME MANUFACTURER. SPRINKLER HEADS: ACCEPTABLE MANUFACTURERS:RELIABLE,AUTOMA TIC, GEM, GRINNELL, VIKING, & CENTRAL RECESSED CROME PENDANT BULB TYPE 112 "ORIFICE, QUICK RESPONSE. PIPE INSTALLATION PROVIDE HANGERS ON ALL ARM OUTS OF 12" OR MORE. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE WITH UL FIRE RESISTANCE INDEX FOR THROUGH - PENETRATION FIRESTOP SYSTEMS. COORDINATE REQUIREMENTS WITH DIVISION Z PROVIDE TRAPEZE TYPE HANGERS WHERE NECESSARY TO SUPPORT PIPE WHEN STRUCTURAL STEEL IS NOT DIRECTLYABOVE FOR SUPPORT. WARRANTY /GUARANTEE THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN A. PERFECT REPAIR AND CONDITION OF THE PERIOD OF ONE YEAR. DEFECTS OFANY KIND DUE TO THE FAULTY WORK OR MATERIALS APPEARING DURING THE ABOVE MENTIONED PERIOD MUST BE B. IMMEDIATELY MADE GOOD BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIR THERETO. Y Olyd'TtNSTALLFIItTSPRINiZL S NE AM -DADE COUNTY � IRE PROTECTION GENERAL NOTE pTJ TI>IS VORKIN •.F ME DEPARTMENT OR'S WO ZKING PLANS-1 ALL BE !. S NTRACT SUBN117FED FOR AP cPARTMEST BEFQ9E CONTRACTOR TO COORDINATE WITH OWNERMIA, 1 DADE COUNTY FIRS aOn �b� A PERIODICALLY SECURITY WATCH WHEN iY SYSTEM ISINSTA �D�R _ �_!i THE AUTOMATIC SPRINKLER SYSTEM IS NOT r ACTIVE. 77-4o i FIRE PROTECTION DRAWING INDEX N0. DESCRIPTION FP0.1 GENERAL NOTES, DETAILS &PARTIAL PARTIAL FIRE PROTECTION NEW WORK PLAN INTERIOR MODIFICATIONS ONLY (ANY EXTERIOR MODIFICATION MAY REQUIRE A BOARD APPEARANCE) J D PROJECT SITE KEY PLAN FIRST FLOOR VIET B. NGUYEN, P.E. MECHANICAL ENGINEER RE # 69753 MJM Job #i 2014027 MJM ENGINEERING INC. T MECHANICAL, ELECTRICAL & FIRE PROTECTION I I M ENGINEERING CONSULTING SERVICES !J 12717WSUNRISE8LVD5Wh2l3 SUNRISE, n ma CA No: 30046 Tel:(954)- 536 -8426 mj mon teroC'comca stmet mjmrcomcast.net Ri; visions: z ! OJT Q 0 LLI _ - I_ ::D i- C/) Z 1- D Z � . LLJ 0 QU � .z /y y pI� LL C4 N- zQ J rig On 0 Z H d' CO) �+ O 14 x U 0 r" - O v A DRAWN: JM CHECKED: BN DATE: 07 =29 -14 SCALE: I t t f 1Tl SHOWN L �ICENS' No 69753 rr � 4o,ON ; k/ s RI , S � Sheet Nip.. FP0.1 OF. 1 � . JOB # 201426 :3 Z Q • n Ld Of= EL- 0 •J U Q "LLI IY 0 Q cy_ 0-0- PERMIT SET _ 08/01/14 DRAWN: JM CHECKED: BN DATE: 07 =29 -14 SCALE: I t t f 1Tl SHOWN L �ICENS' No 69753 rr � 4o,ON ; k/ s RI , S � Sheet Nip.. FP0.1 OF. 1 � . JOB # 201426 :3