14-998-016- O.S. &Y.
GATE VALVE
- TAMPER SWITCH
- ELECTRIC WATER FLOW
SWITCH
- PRESSURE GAUGE
& COCK
TO AUTOMATIC SPRINKLER
SYSTEM ---,
GLASS _ TEST VALVE
SECTIONAL
DRAIN VALVE
UNION W/ CORROSION RESISTANT ORIFICE
GIVING FLOW EQUAL TO SMALLEST
A/S DRAIN SPRINKLER ORIFICE IN SYSTEM.
STANDPIPE OR
SPRINKLER MAIN.
SEE FLOOR PLAN
DWGS. FOR SIZES.
EXISTING A /S ZONE CONNECTION DETAIL
l%
SCALE: N.T.:
1" RETURN BEND DROP TO
SPRINKLER HEAD IN CEILING
\\—SPRINKLER BRANCH PIPING
`HUNG CEILING
SPRINKLER HEAD LOCATED IN
CEILING AS SPECIFIED
TYPICAL SPRINKLER DROP
SCALE: N.T.S.
PHILLIPS CONCRETE
FASTENER I.T.T. GRINNELL
(RED HEAD)
ALL THREAD
HANGER ROD
SZE
DIMENSION
1 IN.
1/8
IN.
1 1/4
IN. 1/8
IN.
1 1/2
IN. 1/8
M.
2 IN.
1/4
IN.
21/2
IN. 1/4
IN,
D
DIMENSION
&—L
I PIPE HANGER RING PIPE
I.T.T. GRINNELL FIG.260
PIPE HANGER RING
I.T.T. GRINNELL FIG. 69
PIPES 3" & SMALLER PIPES 4" & LARGER
U.L. /F.M. APPROVED
CON CRETE I N SER T
PIPING HANGER DETAIL
SCALE: N.T.S.
PARTIAL NEW WO
SCALE: 1/4" = 1' -0"
NEW KEY NOTE
SYMBOL
DESCRIPTION
OEXISTING
SPRINKLER HEADS TO BE REMOVED AND REPLACED
LOCATION
WITH NEW QRS SEMI - RECESSED TYPE IN THIS AREA AS SHOWN.
OPIPE
NEW 1" TO NEW SPRINKLER HEAD FROM THIS AREA AS
'
SHOWN, CONTRACTOR TO COORDINATE ALL SHUT DOWN WITH
it Y 4' 60 8'
OWNER.
OEXISTING
EXPOSED PIPING AND SPRINKLER HEAD TO BE REMOVED.
12 -0 12 -0 N/A N/A N/A
RUN 1 SPRINKLER PIPE ABOVE THE CEILING TO NEW HEAD AS
N/A
REQUIRED. COORDINATE ALL SHUT DOWN WITH OWNER.
®EXISTING
SPRINKLER HEADS AND ALL EXPOSED PIPING IN THIS
5-6
ROOM TO BE REMOVED AS REQUIRED. COORDINATE SHUT DOWN
7 -0 8-0 N/A N/A N/A
WITH OWNER.
OF EXISTING FLOOR CONTROL ASSEMBLY IS LOCATED
OLOCATION
INSIDE THE STAIRWELL DUE WEST OF SCOPE OF PROJECT.
CONTRACTOR TO COORDINATE ALL SHUT DOWN WITH OWNER.
ELF SHORT STRAP HANGER
VFASTENER
SHORT STRAP
MAXIMUM
DISTANCE BETWEEN
HANGERS (ft)
NOTE: ALL PIPE SHALL BE HUNG AS PER
NFPA 13 do MANUFACTURER INSTRUCTIONS
LOCATION
REPLACE ALL SPRINKLER
HEADS WITH NEW'QRS
SEMI- RECESSED TYPE
NOMINAL DIAMETER (INCHES)
PIPE
'
1' it
it Y 4' 60 8'
STEEL 0)
N/A
12 -0 12 -0
12 -0 12 -0 N/A N/A N/A
STEEL (SOH 40)
N/A
12 -0 12 -0
15-0 15-0 15-0 15-0 15-0
PLASTIC
5-6
6-0 6 -6
7 -0 8-0 N/A N/A N/A
RK PLAN - FIRE PROTECTION
GENERAL NOTE:
1. ALL NEW SPRINKLER HEAD LAYOUT
TO BE DESIGNED FOR LIGHT HAZARD.
2. CONTRACTOR SHALL MAINTAIN ALL WALL
FIRE RATING.
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR FIRE PROTECTION HYDRAULIC CALCULATIONS.
SPRINKLER HEAD LEGEND
SYMBOL
MFG.
K -FACT
TEMP
LOCATION
REPLACE ALL SPRINKLER
HEADS WITH NEW'QRS
SEMI- RECESSED TYPE
VIKING
5.6
165^
ALL AREA WITHIN
SCOPE OF WORK
NEW CONSTRUCTION
�—�
NEW CONSTRUCTION LEGEND
SYMBOL
DESCRIPTION
•
NEW SPRINKLER HEADS
O-•
PIPE NEW 1" SPRINKLER PIPE TO NEW HEADS
X—•
EXISTING SPRINKLER HEADS TO BE REMOVED, RUN NEW PIPE TO NEW HEAD
EXISTING TO REMAIN
NEW CONSTRUCTION
�—�
CONNECT TO EXIST. AT THIS POINT
h
FIRE PROTECTION GENERALfVO�"�S ;--
1. ALL FIRE PROTECTION SYSTEM SHALL BE IN COMPLIANCE WITH THE
LOCAL FIRE CODES AND ORDINANCES AND INSTALLED IN ACCODANCE
WITH THE LATEST CODES AND STANDARDS.
A. NFPA -13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS. (2007).
B. NFPA -101 LIFE SAFETY CODE. (2009)
C. FLORIDA FIRE PREVENTION CODE. (2010)
D. FLORIDA BUILDING CODES (2010)
2. MAKE ALL OFFSETS REQUIRED AS PER JOB CONDITIONS.
3. CONTRACTOR TO PROVIDE AND TURNOVER TO THE OWNER AT LEAST (6)
SPARE SPRINKLERS OF SAME TYPE AND TEMPERATURE RATING BEING INSTALLED.
4. ALL SPRINKLER HEADS SHALL BE CENTERED AND PRESENT A NEAT AND
BALANCED CEILING PATTERN UNLESS SHOWN OTHERWISE.
S. CONTRACTOR SHALL COORDINATE WITH STRUCTURE AND OTHER TRADES
BEFORE INSTALLING SPRINKLER WORK.
6. INSTALL PIPING TIGHT TO STRUCTURE WHERE POSSIBLE.
Z SPRINKLER SYSTEM TO BE INSTALLED BYA STATE CERTIFIED FIRE
PROTECTION CONTRACTOR.
8. ALL PRODUCTS ASSOCIATED WITH THE SPRINKLER SYSTEM SHALL BE
UNDERWRITERS LABORATORIES (UL) LISTED AND FACTORY (FM) APPROVED.
EIRE PROTECTION SPECIFICATIONS
THE FIRE PROTECTION SYSTEM SHALL BE INSTALLED AND TESTED IN
ACCORDANCE WITH NFPA 13 2007.
CONTRACTOR SHALL PROVIDE SPRINKLER SHOP DRAWINGS AND HYDRAULIC
CALCULATIONS FOR SUBMISSION TO BLDG. DEPT. FOR PERMIT REVIEW AS
PART OF THIS PROJECT.
ALL PRODUCTS ASSOCIATED WITH THE SPRINKLER SYSTEM SHALL BE
UNDERWRITERS LABORATORIES (UL) LISTED AND FACTORY (FM) APPROVED.
PIPE
INTERIOR PIPE AND FITTINGS:
1. SCHEDULE 40 ASTM -135, ELECTRIC- RESISTANCE WELDED STEEL PIPE.
2. THREADABLE THINWALL, ASTM -135, ELECTRIC RESISTANCE WELDED BY
BERGER, ALLIED, OR BULL MOOSE.
FITTINGS:
A. MECHANICAL COUPLINGS: ROLL OR CUT GROOVE RIGID TYPE BY
VICTAULIC, SPRINK OR GRINNELL.
B. CLASS 125 OR CLASS 250 CAST IRON SPRINKLER FITTINGS -
SCREWED, FLANGED, OR GROOVED -END.
C. ALL FITTINGS SHALL BE BY THE SAME MANUFACTURER.
SPRINKLER HEADS:
ACCEPTABLE MANUFACTURERS:RELIABLE,AUTOMA TIC, GEM, GRINNELL, VIKING, &
CENTRAL RECESSED CROME PENDANT BULB TYPE 112 "ORIFICE, QUICK RESPONSE.
PIPE INSTALLATION
PROVIDE HANGERS ON ALL ARM OUTS OF 12" OR MORE.
SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE
WITH UL FIRE RESISTANCE INDEX FOR THROUGH - PENETRATION FIRESTOP
SYSTEMS. COORDINATE REQUIREMENTS WITH DIVISION Z
PROVIDE TRAPEZE TYPE HANGERS WHERE NECESSARY TO SUPPORT PIPE
WHEN STRUCTURAL STEEL IS NOT DIRECTLYABOVE FOR SUPPORT.
WARRANTY /GUARANTEE
THE CONTRACTOR SHALL WARRANTY /GUARANTEE AND MAINTAIN
THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN
A. PERFECT REPAIR AND CONDITION OF THE PERIOD OF ONE YEAR.
DEFECTS OFANY KIND DUE TO THE FAULTY WORK OR MATERIALS
APPEARING DURING THE ABOVE MENTIONED PERIOD MUST BE
B. IMMEDIATELY MADE GOOD BY THE CONTRACTOR AT HIS OWN
EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND
ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL
INCLUDE DAMAGE TO THE FINISH OR FURNISHING OF THE
BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIR
THERETO.
Y Olyd'TtNSTALLFIItTSPRINiZL
S NE AM -DADE COUNTY
� IRE PROTECTION
GENERAL NOTE pTJ TI>IS VORKIN •.F ME DEPARTMENT
OR'S WO ZKING PLANS-1 ALL BE !.
S
NTRACT
SUBN117FED FOR AP cPARTMEST BEFQ9E
CONTRACTOR TO COORDINATE WITH OWNERMIA, 1 DADE COUNTY FIRS aOn �b�
A PERIODICALLY SECURITY WATCH WHEN iY SYSTEM ISINSTA �D�R _ �_!i
THE AUTOMATIC SPRINKLER SYSTEM IS NOT r
ACTIVE. 77-4o i
FIRE PROTECTION DRAWING INDEX
N0.
DESCRIPTION
FP0.1
GENERAL NOTES, DETAILS &PARTIAL
PARTIAL FIRE PROTECTION NEW WORK PLAN
INTERIOR MODIFICATIONS ONLY
(ANY EXTERIOR MODIFICATION MAY REQUIRE
A BOARD APPEARANCE)
J
D
PROJECT SITE
KEY PLAN
FIRST FLOOR
VIET B. NGUYEN, P.E.
MECHANICAL ENGINEER
RE # 69753 MJM Job #i 2014027
MJM ENGINEERING INC.
T MECHANICAL, ELECTRICAL & FIRE PROTECTION
I I M ENGINEERING CONSULTING SERVICES
!J 12717WSUNRISE8LVD5Wh2l3
SUNRISE, n ma
CA No: 30046
Tel:(954)- 536 -8426
mj mon teroC'comca stmet
mjmrcomcast.net
Ri; visions:
z !
OJT
Q 0
LLI _ -
I_
::D i-
C/) Z
1- D
Z � .
LLJ
0
QU
�
.z
/y y pI�
LL C4 N-
zQ
J rig
On 0
Z
H d'
CO)
�+ O
14 x
U
0 r" -
O v A
DRAWN: JM
CHECKED: BN
DATE: 07 =29 -14
SCALE: I t t f 1Tl SHOWN
L �ICENS'
No 69753
rr
� 4o,ON ; k/
s RI ,
S �
Sheet Nip..
FP0.1
OF.
1 � .
JOB # 201426
:3
Z
Q •
n
Ld
Of=
EL-
0
•J
U
Q
"LLI
IY
0
Q
cy_
0-0-
PERMIT SET _
08/01/14
DRAWN: JM
CHECKED: BN
DATE: 07 =29 -14
SCALE: I t t f 1Tl SHOWN
L �ICENS'
No 69753
rr
� 4o,ON ; k/
s RI ,
S �
Sheet Nip..
FP0.1
OF.
1 � .
JOB # 201426
:3