Loading...
14-998-011STRAP HANGER ANGER STRAF 0" MAX.- L-SCREWS SCREWS MAY BE MIN OMITTED IF HANGER LOOPS SECURE WIRE f0" DIA. MAX. UNLESS FOOT OF STRAP IS PLACED UNDER A BOTTOM REINFORCEMENT LOAD RATED FASTENERS 50" DIA. MAX. 4AND OF SAME SIZE AS HANGER STRAP 24" DIA. MAX. HANGERS MUST NOT DEFORM DUCT SHAPE ONEVHALF -ROUND MAY BE USED IF DUCT SHAPE IS MAINTAINED LOAD NUTS ANGLES ALTERNATE LOCATION (VERIFY UPPER TRAPEZE LOAD CAPACITY) REINFORCEMENT MAY BE USED FOR ATTACHMENT IF IT QUALIFIES FOR BOTH DUTIES. DO NOT EXCEED ALLOWABLE LOAD LIMITS. DUCT HANGER SUPPORT FROM UNDERSIDE OF STRUCTURE (TYP) SHOE TRAP WITH VOLUME DAMPER HARD ELBOW MAIN BRANCH ~ SINGLE RUN OUT TRANSITION AS REQ'D. HAND DAMPER CEILING CEILING MOUNTED BRANCH DUCTS SEQUENCE OF OPERATION FOR EXISTING RTU -14 THE SEQUENCE OF OPERATION IS AS FOLLOWS: EXISTING RTU -14, IT ASSOCIATED EXHAUST FANS SHALL RUN CONTINUOUSLY ALL THE TIME. UPON ACTIVATION OF THE BUILDING FIRE ALARM SYSTEM RTU -14, ASSOCIATED EXHAUST FANS AND ALL ASSOCIATED FIRE /SMOKE DAMPERS WITHIN THAT SMOKE COMPARTMENT SHALL SHUT DOWN. UPON MANUAL SHUT DOWN OF THE RTU -14 THE ASSOCIATED EXHAUST FANS SHALL ALSO SHUT DOWN. GENERAL NOTES 1. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING AND VERIFY THE CONDITION AND ACCESSIBILITY OF THE SITE. 2. THE DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL FITTINGS, OFFSETS AND ACCESSORIES. THE CONTRACTOR SHALL INCLUDE IN HIS BID AN ALLOWANCE TO PROVIDE A COMPLETE, OPERATIONAL SYSTEM WITHIN THE INTENT OF THE DRAWINGS. 3. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE OTHER TRADES AND SHALL REPORT ANY CONFLICTS TO THE ENGINEER BEFORE ANY WORK IS STARTED. 4. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH THE FLORIDA BUILDING CODE. 5• THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, INSPECTIONS AND FEES AS REQUIRED. 6. THE CONTRACTOR SHALL PERFORM THE WORK WITH SKILLED CRAFTSMEN AND ANY WORK UNACCEPTABLE TO THE ARCHITECT SHALL BE REMOVED AND REPLACED. 7. ALL WORK SHALL BE DONE IN COMPLIANCE WITH ALL THE REQUIRED CODES AS ADOPTED BY THE STATE FIRE MARSHALL'S RULES AS LISTED ON AHCA'S WEBSITE. 8. TEST AND BALANCE AIR FLOW AFTER WORK HAS BEEN COMPLETED IN ACCORDANCE WITH NEBB PROCEDURES. TESTING AND BALANCING SHALL BE DONE BY A COMPANY CURRENTLY CERTIFIED BY NEBB. 9- PROVIDE A ONE YEAR WARRANTY FOR LABOR AND MATERIALS FROM DATE OF ACCEPTANCE BY THE OWNER. 10• PROVIDE FIVE YEAR WARRANTY ON COMPRESSORS. RTU -14 AIR CHANGE RATE CALCULATION 1,330 ROOM SIZE FOOT /KNEE TUB TOTAL ROOM % O/A TO 58 AFTER CONSTRUCTI ❑N 14 S/A ROOM 103 OUTSIDE AIR (CFM) OUTDOOR AIR 2,230 .06 465 AREA AREA HEIGHT VOLUME Oi CONTRACTOR TO RE- BALANCE RTU -8 TO VALUE SHOWN DURING AND AFTER CONSTRUCTION. AC /HR =235/A AC /HR <SF) (FT.) (FT ^3) (CFM) DESIGN REQUIRED (CFM) DESIGN REQUIRED - BODY TUB ROOM 101 188 8 1,504 235 9.3 6 54.0 2.1 - FOOT /KNEE TUB 58 8 464 125 16.1 6 28.7 3.7 2 ROOM 103 105 .06 17 28 ROOM 105 ULTRA VIOLET NOTES: 1. OUSIDE AIR IS PROVIDED BY EXISTING RTU -14 ROOM 104 79 8 632 150 14 6 34.5 3.2 2 SOIL ROOM 25 8 200 -50 15 10 - - - WORKAREA/ LOBBY 270 8 2,160 215 6 2 49.4 3.2 1.3 EQUIPMENT ROOM 106 76 8 608 125 12.3 2 28.7 2.8 - EXISTING OFFICE ROOM 105 105 8 840 125 8.9 2 28.7 2.0 - OUTSIDE AIR CALCULATIONS (AS PER FBC MECHANICAL 2010) AREA # OF PEOPLE CFM /PERSON FLOOR AREA CFM /SF O.A. CFM REQUIRED O.A. CFM PROVIDED BODY TUB 2 5 188 .06 22 54 ROOM 101 RETURN (CFM) OUTSIDE AIR (CFM) RTU -14 1,270 1,330 165 FOOT /KNEE TUB 2 5 58 AFTER CONSTRUCTI ❑N 14 28 ROOM 103 OUTSIDE AIR (CFM) RTU -14 2,230 .06 465 ULTRA VIOLET Oi CONTRACTOR TO RE- BALANCE RTU -8 TO VALUE SHOWN DURING AND AFTER CONSTRUCTION. ROOM 104 2 5 79 .06 15 34 SOIL ROOM - - - - - WORKAREA/ LOBBY 2 - 270 .06 26 49 EQUIPMENT ROOM 106 1 5 76 .06 10 28 EXISTING OFFICE 2 5 105 .06 17 28 ROOM 105 NOTES: 1. OUSIDE AIR IS PROVIDED BY EXISTING RTU -14 1 HR. FIRE RATE WALL(SEE ARCH. A I- 1" MIN. T FIRE DAMPER STYLE "B" FUSIBLE LINK (165- F.) II L SUPPLYI AIR DUCTTMETAL GALVANIZED STEEL SLEEVE (20 GAUGE MIN) 1/4" MIN. _� H" MAX. FIRE DAMPER \-111/2' / " GREENHECK MODEL DFD -150 TYPE B / AUGE MIN�NGLE (UL STANDARD 555- LISTING #R- 13317) ' TYPE "B" FIRE DAMPER WITH INTEGRAL SLEEVE HVAC LEGEND SUPPLY DUCTWORK RETURN OR EXHAUST DUCTWORK SUPPLY DIFFUSER & AIR QUANTITY RETURN GRILLE & AIR QUANTITY ® CFM EXHAUST GRILLE & AIR QUANTITY OT THERMOSTAT OH HUMIDITYSENSOR (SPACE) SD DUCT SMOKE DETECTOR .- FD FIRE DAMPER r- SD SMOKE DAMPER r- MANUAL VOLUME DAMPER EXISTING TO REMAIN NEW V71717�1 - /�J EQUIPMENT TO BE REMOVED CONNECTOR REMOVE EXISTING TO THIS POINT AIR BALANCE SCHEDULE BEFORE C ❑NSTRUCTI ❑N UNIT MARK SUPPLY (CFM) RETURN (CFM) OUTSIDE AIR (CFM) RTU -14 2,020 1,855 165 SMOKE DAMPER(S) NO FIRE RATED ENCLOSURE DURING CONSTRUCTION UNIT MARK SUPPLY (CFM) RETURN (CFM) OUTSIDE AIR (CFM) RTU -14 1,270 1,330 165 NO AFTER CONSTRUCTI ❑N UNIT MARK SUPPLY (CFM) RETURN (CFM) OUTSIDE AIR (CFM) RTU -14 2,230 1745 465 Oi CONTRACTOR TO RE- BALANCE RTU -8 TO VALUE SHOWN DURING AND AFTER CONSTRUCTION. HVAC DESIGN REQUIRES SHEET N0. DESCRIPTION MO.1 DUCT SMOKE DETECTOR(S) M1.1 NO FIRE DAMPER(S) YES 11717W SUNRISE BLVD sukt 215 SUNRISE, n 33313 SMOKE DAMPER(S) NO FIRE RATED ENCLOSURE 10 NO FIRE RATED ROOF /FLOOR CEILING ASSEMBLY n,j„r„ �mcact.net NO FIRE STOPPING (SEE ARCH.) NO SMOKE CONTROL NO MECHANICAL GENERAL NOTES--: -=- A. GENERAL REQUIREMENTS : - - _ - - _ 1. SCOPE OF WORK SHALL INCLUDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, TRANSPORTATION, HOISTING, RIGGING, INSURANCE, ETC., TO PERFORM THE WORK AS INDICATED ON THE DRAWINGS AND HEREIN SPECIFIED FOR A COMPLETE INSTALLATION. 2. ALL WORK SHALL BE IN ACCORDANCE WITH THE FOLLOWING CODES: AIA - 2006 NFPA 101 LIFE SAFETY CODE - 2009 FLORIDA BUILDING CODE - 2010 FACILITIES GUIDELINES INSTITUTE (FGI) - 2010 ASHRAE AND ANSI STANDARDS B. SCOPE OF WORK 1. MANUFACTURES SHALL PROVIDE THEIR STANDARD GUARANTEES AND WARRANTIES FOR WORK UNDER THIS CONTRACT. 2. HVAC WORK IS DIAGRAMMATIC. G.C. TO VERIFYALL EXACT CONDITIONS. 3. ALL DEBRIS TO BE REMOVED DAILY. 4. TEST AND BALANCE AS SHOWN ON PLANS BY MECHANICAL CONTRACTOR. T &B REPORT WILL BE REQUIRED TO BE SUBMITTED TO ENGINEER FOR APPROVAL. S. THE EQUIPMENT INDICATED ON THE DRAWINGS HAS BEEN COORDINATED WITH THE ELECTRICAL SYSTEMS. IF THE CONTRACTOR ELECTS TO USE ALTERNATE EQUIPMENT, HE SHALL BE RESPONSIBLE FOR ALL COORDINATION WITH THE ELECTRICAL ENGINEER AND SHALL BEAR ANY EXPENSE TO THE ELECTRICAL CONTRACTOR RESULTING FROM SUCH ALTERNATE SELECTIONS. 6. CONTRACTOR SHALL NOT DEVIATE FROM THESE DESIGN DOCUMENTS WITHOUT PRIOR APPROVAL FROM ENGINEER. CONTRACTOR IS RESPONSIBLE FOR ALL AS -BUILT DRAWINGS AN L COSTS REQUIRED TO DOCUMENTAS-BUILTDRAWINGS. CONTRACTOR SHALL MAINTAIN REDLINE MARKUP DRAWINGS - UILT CONDITIONS AT THEJOB SITE. C. MATERIALS INSULATION, ADHESIVE, COATING SEALERS, TAPES, SHALL HAVEA FLAME SPREAD RATING OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS IN ACCORDANCE WITH ASTM E -84 AND UL 723. 1. SUPPLYAND RETURN DUCTWORK RECTANGLE - ALL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEET METAL (ASTM A527), BASED ON 2 "STATIC PRESSURE WHICH SHALL BE CONSTRUED TO BE THE "OPERATING PRESSURE" AS INDICATED IN SMACNA TABLE 1 -1 AND ASSOCIATED NOTES. PROVIDE 2" DUCT WRAP AT R =6. FLEXIBLEAIR DUCT MAYBE USED FOR RUNOUT BETWEEN THE SUPPLY AND RETURNAIR DUCTANDAIR DISTRIBUTION DEVICES. FLEXIBLE DUCTSHALL BEA MAXIMUM OF EIGHT FOOT IN LENGTH AND OF CPE LINER DUCT PERMANENTLY BONDED TO A COATED STEEL SPRING WIRE HELIX AND SUPPORTING A 1" FIBERGLASS INSULATNG BLANKET, LOW PERMEABILITY OUTER VAPOR BARRIER OF FIBERGLASS REINFORCED FILM LAMINATE. ATTACHED FLEXIBLE AIR DUCT TO DIFFUSERS AND SPIN COLLARS WITH PLASTIC OR METAL DRAW BANDS AND SEAL THE ENDS WITH TAPE AND MASTIC TO MAINTAIN THE VAPOR BARRIER. FLIXIBLE DUCT AND SPIN COLLAR SIZE SHALL BE THE SAME NOMINAL DIAMTER AS THE NECK OF THE AIR DISTRIBUTION DEVICE IT IS CONNECTED TO. FLEXIBLE DUCT SHALL BE ONE -PIECE AND NOT BE SPLICED TOGETHER. FLEXIBLE DUCT SHALL BE THERMAFLEX AND U.L. 181 LISTED OR EQUAL. D. SUBMITTALS 1. CONTRACTOR SHALL PROVIDE SUBMITTALS TO ENGINEER (VIA ARCHITECT) FOR ALL NEW EQUIPMENT & MATERIALS FOR FINAL APPROVAL PRIOR TO ORDERING /PURCHASING. 2. CONTRACTOR SHALL SUBMIT TEST & BALANCE REPORT TO ENGINEER (VIA ARCHITECT) FOR APPROVAL ONE WEEK PRIOR TO FINAL INSPECTION. CONTRACTOR SHALL BE AABC OR NEBB CERTIFIED AND ALL REPORTS SHALL INCLUDE THE AABC OR NEBB CERTIFICATE. ALL AIR FLOWS SHALL BE WITHIN 105vo OF DESIGN. PRESSURE RELATIONSHIPS WILL BE AS INDICATED DRAWINGS ATA MINIMUM. TEST &BALANCE NOTES A. CONTRACTOR SHALL BE RESPONSIBLE TO TEST AND BALANCE THE SYSTEM TO ACHIEVE RATES AS SHOWN ON PLANS AND SCHEDULES. TEST /BALANCE RESULTS SHALL BE SUBMITTED TO ARCHITECT /ENGINEER FOR REVIEW PRIOR TO FINAL PAYMENT REQUISITION. THE TEST AND BALANCESHALL BE PERFORMED BYAN INDEPENDENT T &B CONTRACTOR CERTIFIED BYTHEA.A.B.0 AND /OR N.E.B.B. THE SUBMITTED TEST AND BALANCE REPORT SHALL BE ON OFFICIAL A.A.B.C. OR N.E.B.B. REPORT FORMS. B. BALANCEAIR SYSTEM TO DELIVER SPECIFIED QUANTITIES AT EACH OUTLET WITHIN 10% USING A.A.B.C. PROCEDURES AND TESTS. SUBMIT AIR BALANCE TEST RESULTS FOR REVIEW PRIOR TO FINAL INSPECTION AND ACCEPTANCE. C. FINAL CONSTRUCTION UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED AIR QUANTITIES TO THE RENO- VATED SPACE, ANYADDITION OF DAMPERS, ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL BE INCLUDED IN THIS CONTRACTOR PROPOSAL. D. FINAL REPORT SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACEPTANCE ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE. HVAC DRAWING INDEX SHEET N0. DESCRIPTION MO.1 GENERAL NOTES, DETAILS & SCHEDULES - HVAC M1.1 PARTIAL ICRA FLOOR PLAN - HVAC M2.1 PARTIAL DEMO AND NEW WORK PLAN -HVAC INTERIOR MODIFICATIONS ONLIV p_Ny E!"rERI01O I N ICKNO MAY REQUIRE OA MIAMI -DADE COUNTY FIRE DEPARTMENT VIET B. NGUYEN, P.E. MECHANICAL ENGINEER RE.# 69753 MJM Job # 2014027 DATE: MJM ENGINEERING INC. MECHANICAL, ELECTRICAL & FIRE PROTECTION Qm ENGINEERING CONSULTING SERVICES 11717W SUNRISE BLVD sukt 215 SUNRISE, n 33313 CA No: 30046 Tel:(954)- 536 -8126 W 10 mjmontero(P! comcast.net n,j„r„ �mcact.net Revisions: 0 z OJ i �- < C) lQ O LJJ = U Z z: . Lu 2 o Q Ld _j Big Z a ' H d' t--t I a C/1 C) x V 0 sill 0 41 �f .0 v ,PERMIT SET 08/01/14 DRAWN: JM- CHECKED: BN DATE: 07 -29 -14 SCALE: AS SHOWN SEA .� , LICE/VS� r� - -C� •'. STgTE OF . . Sheet No. M 0.1 OF 3 r JOB # 201426