14-998-0031. THIS DRAWING IS ONLY TO ASSIST IN SHOWING
THE SCOPE OF DEMOLITION WORK AND IS NOT
INTENDED TO INDICATE ALL DEMOLITION.
CONTRACTOR SHALL REMOVE ALL EXISTING
ITEMS AS REQUIRED TO COMPLETE THE JOB.
2. NOT ALL ITEMS TO BE DEMOLISHED ARE SHOWN
ON THE PLAN. CONTRACTOR SHALL BE
RESPONSIBLE FOR PERFORMING A WALK -THRU
OF THE PROJECT PRIOR TO SUBMITTING A BID TO
THE OWNER FOR IDENTIFYING POSSIBLE CRITICAL
ITEMS, NOT OR INCORRECTLY ADDRESSED,
WHICH REQUIRE REMOVAL/ RELOCATION.
3. PROVIDE SAFETY FEATURES DURING WORK AS
CALLED FOR IN SPECS, APPLICABLE CODES,
RULES AND REGULATIONS HAVING JURISDICTION
OF THE PROJECT.
4. CUT, REMOVE, PATCH, ALTER AND REFINISH
EXISTING CONSTRUCTION AS REQUIRED TO
LEAVE WORK COMPLETE AND IN SATISFACTORY
MANNER
5. CONTRACTOR IS TO PROTECT ALL UNDER- 8.
GROUND OR OTHER CONCEALED UTILITIES HE IS
TO INSPECT CEILING AND CHASES TO ASSURE
PROPER IDENTIFICATION OF UTILITIES.
MECHANICAL AND /OR ELECTRICAL
CONTRACTOR ARE TO CAP THEM AS REQUIRED.
6. REMOVE ALL EXISTING ACOUSTICAL TILE CLG.
AND SUSPENDED SYSTEMS IN THE
RENOVATION AREA AS REQUIRED FOR
INSTALLATION OF WORK TO BE DONE.
COORDINATE REMOVAL WITH ELECTRICAL
CONTRACTOR REGARDING EXISTING LIGHTING
FIXTURES ETC- REPLACE CEILING
ACCORDINGLY AFTER COMPLETING OF WORK
-I. CONTRACTOR IS TO SAW -CUT ALL OPENINGS IN
CONCRETE BLOCK WALLS IF REQUIRED.
CONTRACTOR SHALL NOT DEMOLISH OPENINGS
WITH SLEDGE HAMMER UNTIL OUTLINES HAVE
BEEN CUT.
GENERAL DEMOLITION NOTES:
RENOVATION WORK MAY ENTAIL INTERVENTIONS IN
AREAS OUTSIDE OF THE IMMEDIATE SCOPE OF
WORK, INCLUDING WORK ABOVE AND /OR BELOW
THE FLOOR LEVEL WITHIN THE SCOPE. IT MAY
REQUIRE WORK INVOLVING REMOTE UTILITY LINES
(ELECTRICAL MECHANICAL, PLUMBING,
COMMUNICATIONS). ANY WORK IN AREAS OUTSIDE
OF THE IMMEDIATE SCOPE OF WORK SHALL BE
ALL- INCLUSIVE, PROVIDING ALL STRUCTURES,
UTILITIES, FINISHES AND EQUIP. REQUIRED TO
RESTORE THE AREA TO FULLY OPERATIONAL
CONDITIONS, TO FULLY COMPLYING RATING
INTEGRITY, AND TO MEET OWNER'S APPROVAL ALL
WORK AS DESCRIBED IN THIS NOTE IS TO BE PART
OF THE BASE CONTRACT PRICE, OR CONTRACT
CONTINGENCY ALLOWANCE FOR SUCH WORK.
S. CONTRACTOR IS TO COORDINATE DEMOLITION
WORK WITH ADMINISTRATION AND IS TO GIVE
SUFFICIENT ADVANCE NOTICE OF THE BEGINNING
OF WORK IN EACH EXISTING FLOOR TO
ADMINISTRATION (12 HOUR MINIMUM)
10. CONTRACTOR SHALL VERIFY EXACT LOCATION
OF EXISTING CONCRETE COLUMNS IN AREAS
WHERE WALLS ARE BEING REMOVED AND
INFORM ARCHITECT OF ANY CONFLICTS
BEFORE ANY WALLS ARE REMOVED SO THAT
A/E CAN INSPECT THEM FOR CLARIFICATION
PRIOR TO PROCEEDING WITH WORK.
II. PATCH AND REPAIR ALL EXISTING SURFACES
DAMAGED BY DEMOLITION AND /OR INSTAL-
LATION OF NEW ELECTRICAL CONDUITS, GAS
PIPING, ETC- AS REQUIRED TO MATCH
ADJACENT SURFACES AND /OR AS REQUIRED
FOR NEW SCHEDULED FINISHES.
12. DEMOLITION IS DENOTED BY BROKEN LINES.
13. FOR REMOVAL OF FIXTURES AND EQUIPMENT
SEE ARCHITECTURAL, PLUMBING, MECHANICAL
AND ELECTRICAL DRAWINGS.
14. PREPARE EXISTING CONCRETE SLAB AS REQ.
BY GRINDING, LEVELING WITH ARDEX LEVELER
AS PER MANUFACTURERS SPECIFICATIONS.
MATCH EXISTING SLAB ELEVATION AS
REQUIRED TO RECEIVE NEW SCHEDULED
FLOORING MATERIAL.
15. VERIFY WITH CIVIL, PLUMBING, MECHANICAL
AND ELECTRICAL DRAWINGS ITEMS TO BE
REMOVED /RELOCATED IN CASE OF
CONFLICT.
16. DESTINATION OF ALL EXISTING EQUIPMENT,
PLUMBING FIXTURES, DOORS AND FRAMES, ETC.
TO BE REMOVED SHALL BE COORDINATED
WITH THE OWNER
1 -1. CONTRACTOR TO SURVEY PROJECT AREA
PRIOR TO COMMENCEMENT OF WORK NOTE
AND REPAIR ANY DAMAGE TO AREAS
WHERE WORK IS GOING TO BE PERFORMED.
NOTIFY OWNER AND ARCHITECT WITH A LIST
OF WORK PRIOR TO CONTRACT.
PART 1,4L
pEMOLITION PLAN
SCALE: 1 /4' = 1' -0'
NOTE: FOR ADDITIONAL 'ICRA INFORMATION' SEE MECHANICAL DRAWINGS.
DEMOL (T 011 _PLAN LF61= ND
C
EXISTING REINFORCED CONC.
.
COLUMN OR CONCRETE WALL
TRANSPORT IN TIGHLY COVERED CONTAINERS
DNL ;-LOUR FIRE-RA-TE_0 WALL /
PA-.-PTITfON (SEE PARTITION TYPES)
-
BEFORE TRANSPORTING.
ONE HOUR FIRE / SMOKE RATED
WALL / PARTITION
-- --
_(SE A 7TAON
_
WALL C '
_EXISTING
PART1TILW TO RE�4A N -
w
WALL OR PARTITION WITH
6. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES
EXISTING DOOR TO REMAIN
— — — — —
EXISTING WALL OR
— — — — —
PARTITION TO BE REMOVED
rWALL
OR PARTITION WITH
EXISTING DOOR TO BE REMOVED
DEMOLITION SYMBOL
(SEE DEMOLITION LEGEND)
DENOTES EXISTING AREAS
OUTSIDE THE SCOPE OF WORK
DEMOLITION NOTES:
OI REMOVE EXISTING DOOR AND FRAME.
O REMOVE EXISTING PARTITION WALL AS
SHOWN - PROVIDE ROUGH OPENING FOR A
4' -0' x 'V-0' x 1 3/4' DOOR (SEE DOOR
SCHEDULE)
O3 REMOVE EXISTING FLOOR FINISH AS
REQUIRED. PATCH AND LEVEL TO
RECEIVE NEW FINISH FLOOR
O REMOVE EXISTING ELECTRICAL OUTLETS,
SWITCHES, LIGHT FIXTURES AND DEVICES.
(SEE ENGINEERING DRAWINGS).
O REMOVE EXISTING CEILING TILES AND
SUPPORT SYSTEM (INCLUDED SOFFIT WITH
A.G.T. FINISH).
O SAW CUT EXISTING SLAB TO PROVIDE
ACCESS UNDERGROUND FOR THE
INSTALLATION OF THE DRAINAGE LINES.
SEE PLUMBING DRAWINGS FOR
COORDINATION.
O REMOVE EXISTING PORTION OF
HANDRAIL, AND REPAIR TO MATCH
EXISTING.
O REMOVE EXISTING WALL MOUNTED i x 4
FLUORESCENT LT'G FIXTURES - FIX / REPAIR
WALL AS REQUIRED TO MATCH EXISTING.
O REMOVE EXISTING CHAIRAIL - REPAIR /
PATCH AS REQUIRED TO MATCH EXISTING.
tm SEE FIRE SPRINKLER DRAWINGS FOR
REQUIRED SCOPE OF WORK.
RE G2U I RE D I CR�4 PRE C:AUT IONS
FOR CLASS III
• DURING CONSTRUCTION PROJECT
I. REMOVE OR ISOLATE HVAC SYSTEM IN AREA
WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK
SITE UTILIZING HEPA EQUIPPED AIR FILTRATION
UNITS.
5�
< UPON COMPLETION OF PROJECT
�w
a
? I. DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT IS INSPECTED BY THE
OWNER'S STAFF.
jJtH MIA 2. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
DEPT. 3. WET MOP/WIPE EXPOSED SURFACES WITH
APPROPRIATELY LABELED AND BHSF APPROVED
L SECTION HOSPITAL DISINFECTANT.
4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY
COVERED CONTAINERS BEFORE TRANSPORTING.
COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
' WHERE WORK IS BEING PERFORMED.
�. REMOVE BARRIER MATERIALS CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
8. FINAL CLEANING BY ENVIRONMENTAL SERVICES
PRIOR TO OCCUPANCY.
coutqv
R
.. M
FIRST AT ..-
S.W. 62ND AVENUE
LOCATION PLAN
Q alon.
D
D
D
D
z
O
A V1
�0
wx
z
H�
z
W
20
V
Lo
Z<p
H
U)
O
1.4 x
O
C
4. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHLY COVERED CONTAINERS
BEFORE TRANSPORTING.
z
o
it
5. COVER TRANSPORT RECEPTACLES OR CARTS.
y
TAPE COVERING UNLESS SOLID LID.
w
6. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES
APPROPRIATELY.
5�
< UPON COMPLETION OF PROJECT
�w
a
? I. DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT IS INSPECTED BY THE
OWNER'S STAFF.
jJtH MIA 2. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
DEPT. 3. WET MOP/WIPE EXPOSED SURFACES WITH
APPROPRIATELY LABELED AND BHSF APPROVED
L SECTION HOSPITAL DISINFECTANT.
4. CONTAIN CONSTRUCTION WASTE IN TIGHTLY
COVERED CONTAINERS BEFORE TRANSPORTING.
COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
' WHERE WORK IS BEING PERFORMED.
�. REMOVE BARRIER MATERIALS CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
8. FINAL CLEANING BY ENVIRONMENTAL SERVICES
PRIOR TO OCCUPANCY.
coutqv
R
.. M
FIRST AT ..-
S.W. 62ND AVENUE
LOCATION PLAN
Q alon.
D
D
D
D
z
O
A V1
�0
wx
z
H�
z
W
20
V
Lo
Z<p
H
U)
O
1.4 x
O
C
J
o
it
w V•
Z Lo,
0
. a z
z ca
H0z
a' 0 z
w V
A�
PERMIT SET
08/01/14
DRAWL GAC
CHECKED. LEN
DATE: 01-29 -14
SCALE: AS SHOWN
0
p
r 63 ►�
r
Sheet No.
A -1
OF
8
)0$ f 201426