13-185-037GENERAL NOTES-
I. CONSTRUCTION ACTIVITY TYPE 'D', POPULATION RISK GROUP 1, CLASS IIIAV
2. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
3. ENSURE INFECTION CONTROL PRACTITIONER CONSULTATION HAS BEEN COMPLETED AND INFECTION
CONTROL MEASURES HAVE BEEN APPROVED.
4. ERECT AN IMPERMEABLE DUST BARRIER FROM TRUE CEILING (INCLUDES AREA ABOVE FALSE CEILINGS) TO
THE FLOOR CONSISTING OF 2 LAYERS OF 6 ML POLYETHYLENE OR SHEETROCK, THAT INCLUDES AN
ANTEROOM.
5. CONSTRUCTION WORKERS SHALL LEAVE THE CONSTRUCTION ZONE THROUGH THE ANTEROOM SO THEY
CAN BE VACUUMED WITH A HEPA FILTERED VACUUM CLEANER BEFORE LEAVING THE WORK SITE.
6. ENSURE WINDOWS, DOORS, PLUMBING PENETRATIONS, ELECTRICAL OUTLETS AND INTAKE AND EXHAUST
VENTS ARE PROPERLY SEALED WITH PLASTIC AND DUCT TAPED WITHIN THE CONSTRUCTION/RENOVATION
AREA.
7. CONSTRUCTION WORKERS SHALL WEAR PROTECTIVE CLOTHING THAT SHALL BE REMOVED EACH TIME THEY
LEAVE THE CONSTRUCTION SITE BEFORE GOING INTO PATIENT CARE AREAS. CONSTRUCTION WORKERS
SHALL WEAR SHOE,COVERS WHICH SHALL BE CHANGED EACH TIME THEY LEAVE THE WORK SITE.
& DO NOT REMOVE DUST BARRIER UNTIL THE PROJECT IS COMPLETE AND THE AREA HAS BEEN CLEANED
THOROUGHLY AND INSPECTED.
9. REMOVE DUST BARRIER CAREFULLY TO MINIMIZE SPREADING DUST AND OTHER DEBRIS PARTICLES
ASSOCIATED WITH THE CONSTRUCTION PROJECT.
10. MAINTAIN NEGATIVE PRESSURE WITHIN THE CONSTRUCTION ZONE.
11. ENSURE AIR IS EXHAUSTED DIRECTLY OUTSIDE AND AWAY FROM INTAKE VENTS OR FILTERED THROUGH A
HEPA FILTER BEFORE BEING RECIRCULATED.
12. ENSURE VENTILATION SYSTEM IS FUNCTIONING PROPERLY AND IS CLEANED IF CONTAMINATED BY SOIL OR
DUST AFTER CONSTRUCTION OR RENOVATION PROJECT IS COMPLETE.
13. REMOVE DEBRIS AT THE END OF THE WORK DAY.
14. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS DAILY OR MORE FREQUENTLY IF ADJACENT TO THE
CONSTRUCTION AREA
15. IN COLLABORATION WITH ENVIRONMENTAL SERVICES, ENSURE THAT CONSTRUCTION ZONE IS THOROUGHLY
CLEANED WHEN Wes( IS COMPLETE.
16. COORDINATE WITH ENVIRONMENTAL SERVICES TO INCREASE THE FREQUENCY OF CLEANING IN AREAS
ADJACENT TO THE CONSTRUCTION ZONE WHILE THE PROJECT IS UNDERWAY.
17. IN COLLABORATION WITH INFECTION CONTROL. ENSURE THAT CONSTRUCTION ZONE IS THOROUGHLY
CLEANED WHEN WORT( IS COMPLETE
18. COORDINATE WITH INFECTION CONTROL TO MOVE HIGH -RISK PATIENTS WHO ARE IN OR ADJACENT TO
THE CONSTRUCTION AREA-
19. REPEATEDLY INSPECT DUST BARRIERS.
20. IN COLLABORATION WITH THE FACILITY PROJECT MANAGER, DESIGNATE A TRAFFIC PATTERN FOR THE
CONSTRUCTION WORKERS THAT AVOIDS PATIENT CARE AREAS AND A TRAFFIC PATTERN FOR CLEAN OR
STERILE SUPPLIES THAT AVOIDS THE CONSTRUCTION AREA
21. PREVENT STAGNANT WATER.
22. COORDINATE WITH MEDICAL AND NURSING STAFF TO ENSURE THAT PATIENTS DO NOT GO NEAR THE
CONSTUCTION AREA
23. HOLES IN WALLS SHALL BE REPAIRED OR TEMPORARILY SEALED.
24. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE
DUCT SYSTEM (EXISTING TO REMAIN).
25. ENSURE VENTILATION SYSTEMS ARE WORKING PROPERLY IN ADJACENT AREAS.
26. ENSURE NEGATIVE PRESSURE IS MAINTAINED WITHIN THE ANTEROOM AND CONSTRUCTION ZONE
27. REVIEW VENTILATION SYSM REQUIREMENTS IN THE CONSTRUCTION AREA WITH INFECTION CONTROL
PRACTITIONER TO ENSURE SYSTEM IS APPROPRIATE AND IS FUNCTIONING PROPERLY.
2$. REMOVE CONSTRUCTION DEBRIS DAILY. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN COVERED
CONTAINERS.
29. REVIEW INFECTION CONTROL MEASURES WITH ENGINEERING STAFF, MAINTENANCE STAFF, ENVIRONMENTAL
SERVICES STAFF AND MEDICAL/NURSING STAFF TO EVALUATE EFFECTIVENESS AND IDENTIFY PROBLEMS
DURING AND AT THE END OF THE CONSTRUCTION PROJECT.
30, COORDINATE WITH INFECTION CONTROL PRACTITIONER TO REGULARLY VISIT THE CONSTRUCTION SITE TO
ENSURE PREVENTATIVE MEASURES ARE BEING FOLLOWED.
31. IN AREAS REQUIRING SPRINKLER SHUTDOWN, PROVIDE A FIRE WATCH IN AREAS OF CONSTRUCTION
DURING SHUTDOWN PERIODS. COMPLY WITH FBC 419.4210. COORDINATE REQUIREMENT OF FIRE
EXTINGUISHERS WITH GENERAL CONTRACTOR.
LEGEND NOTES
OCONTRACTOR SHALL INSTALL NEGATIVE AIR MACHINE AND TEMPORARY ROUND FLEX
DUCT FROM MACHINE AS INDICATED. REMOVE AT END OF CONSTRUCTION.
O2 CONTRACTOR SHALL INSTALL MAGNETIC DRAFT GAUGE AT ENTRANCE. MAINTAIN 0.02' W.C.
NEGATIVE PRESSURE IN THE CONSTRUCTION AREA REFER TO ARCHITECTURAL DRAWINGS FOR
ACTUAL ENTRANCE LOCATION.
O3 CONTRACTOR SHALL PROTECT ALL AIR DEVICES AND DUCTWORK TO REMAIN. SEAL WITH VISQUEEN.
O4 TEMPORARILY CONNECT TO NEAREST EMERGENCY POWER. CONTRACTOR SHALL PROVIDE ALL NECESSARY
ELECTRICAL APPURENTANCES AS REQUIRED FOR THIS CONNECTION.
OTEMPORARY CONSTRUCTION WALL/ VISQUEEN PLASTIC. REFER TO ARCHITECTURAL PLANS.
OTEMPORARY ROUND FLEX DUCT SIZED FOR 0.1' W.G. AT A MAXIMUM OF 1,200 FPM.
PROVIDE THE FOLLOWING FILTERS
WITH PORTABLE AIR SCRUBBER:
STAGE 1 PRE - FILTER: ONE -INCH
DEEP FIBER TRAPPER
STAGE 2 PRE - FILTER: TWO -INCH
MERV 7
STAGE 3 PRE - FILTER: TWO -INCH
DEEP FIBER TRAPPER CARBON
FILTER.
STAGE 4 FINAL - FILTER:
METAL -FRAME 99.97% OR HIGHER
HEPA FILTER.
CEILING
INSTALL DUCTS AS
INDICATED ON
FLOOR PLANS
12X12 WALL
OR CEILING
DI FFUSER EXACT AIR QUANTITIES SHALL BE AS
DIFFUSER
BALANCED AT REQUIRED TO MAINTAIN A 0.02'
75 CFM VD PRESSURE DIFFERENTIAL
CONSTRUCTION AREA
AIRFLOW
METAL FLEX
(TY'•)
PORTABLE
AIR SCRUBBER -•��
TRANSFER 75 CFM WITH HEPA &
UNDER DOOR - CARBON FILTER
MANUFACTURER/ MODEL !
PORTABLE AIR SCRUBBER TO BE SIMILAR TO: ABATEMENT TECHNOLOGIES/ PAS2400
2SCALENTS AIR SCRUBBER DETAIL
O
FLOOR PLAN
SCALES 1/8' = 1' -0'
Project #:412469.000
2121 Ponce de Leon Bouldv�rd
Suite 350
Coral Gables, FL 33134
�I phone: 305.569.1692
. 5 fax: 305.569.1693
Professional Consulting Engineers
Austin . Dallas . Denver . Houston . Kcnsas City . Migmi
Nashville . Phoenix . Richmond . Washington D.C.
EB00007658
D
G
D
�v
0
--v
f
o
QU
4.0
Q
V
16, F
z
o�
a
0
E-� V
<z
Ct� x
< V
a,
�" 31
DRAVJM RR
CH90M LEN
DIATh 1-23 -2012
WAM AS S#N
..'iI16I'ilIi1'aa
t,9.3
`MEC'ANIGAL ENG i EEi
.,
4877.4
Shcet No.
M -ICRA
I JM f 201131
Z
L
V
V
0
<x
W
�z
V
�
0
z
�
w
z
in
H
--v
f
o
QU
4.0
Q
V
16, F
z
o�
a
0
E-� V
<z
Ct� x
< V
a,
�" 31
DRAVJM RR
CH90M LEN
DIATh 1-23 -2012
WAM AS S#N
..'iI16I'ilIi1'aa
t,9.3
`MEC'ANIGAL ENG i EEi
.,
4877.4
Shcet No.
M -ICRA
I JM f 201131