13-185-008W— — — — — — — — — — — — — — — — — — — — - — — — — — — — — — — — — — — — — —
III II II II II II II II II I
III II II II II II II II II d__ -___ _
Itl II II II II II II II II I
Ifl fl ° II fl II II II II II I
III II II II II II II II II I
II II II II II II I
III II II l -- - --� II II II II II I
III II N° II II II II II II I
III II N N -- H - N- -- - -- - -- -N -- - —
III II II II II II II _ II II I
II
Ifl fl IL IV 11 � u u u - u
III II II \ /II II II II '�. II II I
MECH.
S ROOM = -
-- ---- ___--- ---- - - - - --
- - -I I
-
-� I I I
II I I
�I 10
I \III II - -
I \III I I - --
IS 2
L Al I _ -
_
II 1
DINNIN -
- - - - -J ROO
I I -
■
':D7CON5TFJJCTION 1= NTRANCE
- -j1 —
12
C- r -
-
I
2 -
--- 1I_--I- L/A I - -I- JI - -- _-_-
IL I I J
T -1- II
I I I II
13 - - -
II -
E �j 1 13 13 -- - -
- - - -
�i
13
FOOD
STORAGE
13
FOOD
PARAT
FREEZER
ROOM
o-
VESTIBULE
13
OFFICE
11 15
13
DISHI.UASHING
ROOM
FA
OFFICE -
13
11TROU5 OXIDE
NITRO IXIDE
C; N FRAL DE IOL ITION NOTE ,5:
1, THIS DRAWING 15 ONLY TO ASSIST IN SHOWING
THE SCOPE OF DEMOLITION WORK AND IS NOT
INTENDED TO INDICATE ALL DEMOLITION.
CONTRACTOR SHALL REMOVE ALL EXISTING
ITEMS AS REQUIRED TO COMPLETE THE JOB.
2. NOT ALL ITEMS TO BE DEMOLISHED ARE
SHOWN ON THE PLAN. CONTRACTOR SHALL BE
RESPONSIBLE FOR PERFORMING:: A WALK -THRU
OF THE PROJECT PRIOR TO SUBMITTING A BID
TO THE OWNER FOR IDENTIFYING F05515LE
CRITICAL ITEMS, NOT OR INCORRECTLY
ADDRESSED, WHICH REQUIRE REMOVAL/
RELOCATION-
3, PROVIDE SAFETY FEATURES DURING WORK
AS CALLED FOR IN SPECS, APPLICABLE CODES,
RULE5 AND REGULATIONS HAVING JURISDICTION
OF THE PROJECT,
4. CUT, REMOVE, PATCH, ALTER AND REFINISH
EXISTING CONSTRUCTION AS REQUIRED TO
LEAVE WORK COMPLETE AND IN SATISFACTORY
MANNER.
10. CONTRACTOR IS TO COORDINATE DEMOLITION
WORK WITH ADMINISTRATION AND 15 TO GIVE
SUFFICIENT ADVANCE NOTICE OF THE
BEGINNING OF WORK IN EACH EXISTING FLOOR
TO ADMINISTRATION 1-12 HOUR MINIMUM)
11, CONTRACTOR SHALL VERIFY EXACT LOCATION
OF EXISTING CONCRETE COLUMNS IN AREA5
WHERE WALLS ARE BEING REMOVED AND
INFORM ARCHITECT OF ANY CONFLICTS
BEFORE ANY WALLS ARE REMOVED 50
THAT A/E CAN INSPECT THEM FOR
CLARIFICATION PRIOR TO PROCEEDING WITH
WORK,
12. PATCH AND REPAIR ALL EXISTING SURFACES
DAMAGED BY DEMOLITION AND /OR INSTAL-
LATION OF NEW ELECTRICAL CONDUITS, GAS
PIPING, ETC,. AS REQUIRED TO MATCH
ADJACENT SURFACES AND/OR AS REQUIRED
FOR NEW SCHEDULED FINISHES.
--
13,
DEMOLITION 15 DENOTED BY BROKEN LINES.
--------
I
H-
- - - --
I
--4
NEW CONCRETE COLUMN
I
14.
I
EXISTING WALL OR
PARTITION TO REMAIN
L-
I
- - - - --
-J
I
WALL OR PARTITION WITH
I
I
EXISTING DOOR TO REMAIN
I
EXISTING WALL OR
�-
--- - - - -
I
-J
WALL OR PARTITION WITH
t
15.
I
DEMOLITION SYMBOL
(D
(SEE DEMOLITION LEGEND)
BY GRINDING, LEVELING WITH ARDEX LEVELER
DENOTES EXISTING AREAS
t__
AS PER MANUFACTURERS SPECIFICATIONS.
�a.
OPENINGS LEFT THROUGH RATED AND SMOKE
1
- - - - --
--I
I
PARTITIONS DUE TO REMOVAL OF DUCTWORK
I -----
- - - -
I
-,
r- - - --I
DRAWINGS)
FLOORING MATERIAL.
EXISTING CO TANK TO BE RELOCATED -
PER A- H -C.A_ PENETRATION DETAILS -
L--
- - - - --
-J
IL_
I
I
VERIFY WITH CIVIL, PLUMBING, MECHANICAL
I
I
_J
PROVIDE NEW OPENINGS IN CMU WALL
AND ELECTRICAL DRAWINGS ITEMS TO BE
1
REMOVE ALL EXISTING ACOUSTICAL TILE CLG_
L_
- - - - -_
-J
AND SUSPENDED SYSTEMS IN THE RENOVATION
REQUIRED WITHIN WALL,
It EXISTING EXHAUST HOOD TO REMAIN.
12 REMOVE EXISTING CEILING TILE AND
AREA AS REQUIRED FOR INSTALLATION OF
F-------
I
- - -
--i
WORK TO BE DONE, COORDINATE REMOVAL
UPON COMPLETION OF WORK.
14 FINAL CONNECTION TO DIFFUSERS TO BE
I
WITH ELECTRICAL CONTRACTOR REGARDING
I
DESTINATION OF ALL EXISTING EQUIPMENT,
I
I
I I
-
I
PLUMBING FIXTURES, DOORS AND FRAMES, ETC,
I
CEILING ACCORDINGLY AFTER COMPLETING
-------
I
- - -
--a
I
16
----------
I
WITH THE OWNER.
8,
CONTRACTOR IS TO SAW -CUT ALL OPENINGS
L-----
I
- - - -
I
-J
I
IN CONCRETE BLOCK WALLS IF REQUIRED.
--
--- - - - -
-y
CONTRACTOR SHALL NOT DEMOLISH OPENINGS
AND MECH, DRAWINGS.
NOTE AND REPAIR ANY DAMAGE TO AREAS
REMOVAL.
WITH SLEDGE HAMMER UNTIL OUTLINES HAVE
I
I°-
- - - - - - - -
I
-- I
BEEN CUT.
I
NOTIFY OWNER AND ARCHITECT WITH A LIST
I
--
- - - - --
-,
RENOVATION WORK MAY ENTAIL INTERVENTIONS
I
--
- - - - --
I
-4
IN AREAS OUTSIDE OF THE IMMEDIATE SCOPE
I
I�
I
I
OF WORK, INCLUDING WORK ABOVE AND /OR
BELOW THE FLOOR LEVEL WITHIN THE SCOPE.
Is,
THIS SET OF DRAWINGS 15 TO BE USED AS A UNIT.
IT MAY REQUIRE WORK INVOLVING REMOTE
CONTRACTOR IS RESPONSIBLE FOR ALL DISCIPLINES,
I
_J
UTILITY LINES (ELECTRICAL MECHANICAL,
f----
�
- - -
--�
PLUMBING, COMMUNICATIONS). ANY WORK IN
-----------
FOR MAKING ALL SYSTEMS WORK.
I
AREAS OUTSIDE OF THE IMMEDIATE SCOPE OF
-----------
I
WORK SHALL BE ALL - INCLUSIVE, PROVIDING ALL
-_ - - --
-.�
.
I---
I
- - - -_-
--I
I
REQUIRED TO RESTORE THE AREA TO FULLY
--------
--
OPERATIONAL CONDITIONS, TO FULLY
I
I
NO ADDITIONAL COST TO OWNER,
I
I
I
I
I
OWNER'S APPROVAL ALL WORK AS DESCRIBED
I
L_- - - - - --
I --
I
9
I
F------- - - -
1
--i
I
CONTRACT PRICE, OR CONTRACT CONTINGENCY
13
FOOD
PARAT
FREEZER
ROOM
o-
VESTIBULE
13
OFFICE
11 15
13
DISHI.UASHING
ROOM
FA
OFFICE -
13
11TROU5 OXIDE
NITRO IXIDE
C; N FRAL DE IOL ITION NOTE ,5:
1, THIS DRAWING 15 ONLY TO ASSIST IN SHOWING
THE SCOPE OF DEMOLITION WORK AND IS NOT
INTENDED TO INDICATE ALL DEMOLITION.
CONTRACTOR SHALL REMOVE ALL EXISTING
ITEMS AS REQUIRED TO COMPLETE THE JOB.
2. NOT ALL ITEMS TO BE DEMOLISHED ARE
SHOWN ON THE PLAN. CONTRACTOR SHALL BE
RESPONSIBLE FOR PERFORMING:: A WALK -THRU
OF THE PROJECT PRIOR TO SUBMITTING A BID
TO THE OWNER FOR IDENTIFYING F05515LE
CRITICAL ITEMS, NOT OR INCORRECTLY
ADDRESSED, WHICH REQUIRE REMOVAL/
RELOCATION-
3, PROVIDE SAFETY FEATURES DURING WORK
AS CALLED FOR IN SPECS, APPLICABLE CODES,
RULE5 AND REGULATIONS HAVING JURISDICTION
OF THE PROJECT,
4. CUT, REMOVE, PATCH, ALTER AND REFINISH
EXISTING CONSTRUCTION AS REQUIRED TO
LEAVE WORK COMPLETE AND IN SATISFACTORY
MANNER.
10. CONTRACTOR IS TO COORDINATE DEMOLITION
WORK WITH ADMINISTRATION AND 15 TO GIVE
SUFFICIENT ADVANCE NOTICE OF THE
BEGINNING OF WORK IN EACH EXISTING FLOOR
TO ADMINISTRATION 1-12 HOUR MINIMUM)
11, CONTRACTOR SHALL VERIFY EXACT LOCATION
OF EXISTING CONCRETE COLUMNS IN AREA5
WHERE WALLS ARE BEING REMOVED AND
INFORM ARCHITECT OF ANY CONFLICTS
BEFORE ANY WALLS ARE REMOVED 50
THAT A/E CAN INSPECT THEM FOR
CLARIFICATION PRIOR TO PROCEEDING WITH
WORK,
12. PATCH AND REPAIR ALL EXISTING SURFACES
DAMAGED BY DEMOLITION AND /OR INSTAL-
LATION OF NEW ELECTRICAL CONDUITS, GAS
PIPING, ETC,. AS REQUIRED TO MATCH
ADJACENT SURFACES AND/OR AS REQUIRED
FOR NEW SCHEDULED FINISHES.
Class 11 - ICRA
Engineering Maintenance
Staff and Contractors
Environmental Services
Medical /Nursing Staff
Construction and Renovation Activities:
Dust Control:
- Execute work by methods to minimize dust generation from construction or renovation activities.
- Provide active means to minimize dust generation and migration into the atmosphere:
- Use drop sheets to control dust
- Seal windows and unused doors with duct tape
- Seal air vents in construction /renovation area
- Place dust mat at entrance to and exit from work areas
Ventilation-
- Disable the ventilation system in the construction /renovation area until the project is completed.
- Monitor need to change and /or clean filters in construction or renovation area. Pt f�
Debris Removal and Cleanup:'
- Contain debris in covered containers or cover with a moistened sheet wl�'
before transporting the disposal,
Plumbing Activities:
- Collection tanks and long pipes that allow water to stagnate should be avoided.
- Consider hyper chlorinating or superheating stagnant potable water.
Construction and Renovation Activities:
Dust Control:
- Wet mop and vacuum area with a HEPA filtered vacuum as needed and when work is completed.
- Wipe horizontal work surfaces with a disinfectant.
Construction /Renovation Activities:
Risk Reduction:
- Identify high -risk patients who may need to be temporarily moved away from the construction zone.
M AWOADE COUNTY F1
'Y3kY;r�:91Ni*'7iwtiafm$ub< AFVa
1y,
NOTE: Q PROVIDE A PLASTIC DUST ABATEMENT CURTAIN WITH ZIPPER /ENTRANCE
FEATURE FOR DURATION OF WORK IN KITCHEN AREA (5EE MECHANICAL
F_)R,4 u1N_r_:rZ FOR ,4DDITI�) - 1___1 I
E)E1 IOLITION FL,4N LEGEND
RG
13,
DEMOLITION 15 DENOTED BY BROKEN LINES.
5.
CONTRACTOR 15 TO PROTECT ALL UNDER-
TO REMAIN
AS SHOWN
NEW CONCRETE COLUMN
GROUND OTHER CONCEALED UTILITIES HE IS
14.
FOR REMOVAL OF FIXTURES AND EQUIPMENT
EXISTING WALL OR
PARTITION TO REMAIN
TO INSPECCT T CEILING AND CHASES TO ASSURE
SEE ARCHITECTURAL, PLUMBING, MECHANICAL
WALL OR PARTITION WITH
PROPER IDENTIFICATION OF UTILITIES.
EXISTING DOOR TO REMAIN
AND ELECTRICAL DRAWINGS.
EXISTING WALL OR
MECHANICAL AND /OR ELECTRICAL
PARTITION TO E3E REMOVED
WALL OR PARTITION WITH
CONTRACTOR ARE TO CAP THEM AS REQUIRED.
15.
PREPARE EXISTING CONCRETE SLAB AS REQ.
DEMOLITION SYMBOL
(D
(SEE DEMOLITION LEGEND)
BY GRINDING, LEVELING WITH ARDEX LEVELER
DENOTES EXISTING AREAS
OUTSIDE THE SCOPE OF WORK
AS PER MANUFACTURERS SPECIFICATIONS.
�a.
OPENINGS LEFT THROUGH RATED AND SMOKE
TILE AS REQUIRED FOR INSTALLATION OF
MATCH EXISTING SLAB ELEVATION A5
2 OR TAPED SHUT. PROV IDE
PARTITIONS DUE TO REMOVAL OF DUCTWORK
SIGNS DURING
REQUIRED TO RECEIVE NEW SCHEDULED
EXISTING FAN COIL UNIT ABOVE CEILING
CONDUIT SHALL BE CLOSED (BOTH SIDES) AS
DRAWINGS)
FLOORING MATERIAL.
EXISTING CO TANK TO BE RELOCATED -
PER A- H -C.A_ PENETRATION DETAILS -
PLAN FOR LOCATION
REMOVE ALL DEBRIS, PROVIDE A DEEP
CLEANING OF ENTIRE SPACE AND PREP
SURFACE FOR NEW CONCRETE PAD AND
1o.
VERIFY WITH CIVIL, PLUMBING, MECHANICAL
EXISTING FAN TO BE REMOVED. SEE
X /A -4 FOR WALL IN FILL DETAIL.
PROVIDE NEW OPENINGS IN CMU WALL
AND ELECTRICAL DRAWINGS ITEMS TO BE
1
REMOVE ALL EXISTING ACOUSTICAL TILE CLG_
IO EXISTING DRAIN PIPE TO REMAIN.
REMOVED /RELOCATED IN CASE OF CONFLICT_
WALL AND INSTALLATION OF NEW
AND SUSPENDED SYSTEMS IN THE RENOVATION
REQUIRED WITHIN WALL,
It EXISTING EXHAUST HOOD TO REMAIN.
12 REMOVE EXISTING CEILING TILE AND
AREA AS REQUIRED FOR INSTALLATION OF
MATCH EXISTING HEIGHT AT
13 PROVIDE DUST PROOF BARRIER OVER
EXISTING EQUIPMENT IN WORK AREA.
WORK TO BE DONE, COORDINATE REMOVAL
UPON COMPLETION OF WORK.
14 FINAL CONNECTION TO DIFFUSERS TO BE
DONE AFTER HOURS AND COORDINATED
WITH ELECTRICAL CONTRACTOR REGARDING
M.
DESTINATION OF ALL EXISTING EQUIPMENT,
AROUND WORK AREA WITH ZIPPER
EXISTING LIGHTING FIXTURES ETC -- REPLACE
BARRIER REMOVED UPON COMPLETION
PLUMBING FIXTURES, DOORS AND FRAMES, ETC,
MECHANICAL DRAWINGS AND ICRA
CEILING ACCORDINGLY AFTER COMPLETING
15 ISOLATE MECHANICAL SYSTEM IN THIS
TO BE REMOVED SHALL BE COORDINATED
AHU # 14
OF WORK,
PORTABLE 12 TON UNIT. USE EXISTING
WITH THE OWNER.
8,
CONTRACTOR IS TO SAW -CUT ALL OPENINGS
18-
CONTRACTOR TO SURVEY PROJECT AREA
DETAIL. SEE MECHANICAL AND
IN CONCRETE BLOCK WALLS IF REQUIRED.
INFORMATION.
PRIOR TO COMMENCEMENT OF WORK,
REMOVED. PREP WALL FOR INSTALLATION
CONTRACTOR SHALL NOT DEMOLISH OPENINGS
AND MECH, DRAWINGS.
NOTE AND REPAIR ANY DAMAGE TO AREAS
REMOVAL.
WITH SLEDGE HAMMER UNTIL OUTLINES HAVE
WHERE WORK IS GOING TO BE PERFORMED.
BEEN CUT.
NOTIFY OWNER AND ARCHITECT WITH A LIST
OF WORK PRIOR TO CONTRACT.
S.
RENOVATION WORK MAY ENTAIL INTERVENTIONS
IN AREAS OUTSIDE OF THE IMMEDIATE SCOPE
OF WORK, INCLUDING WORK ABOVE AND /OR
BELOW THE FLOOR LEVEL WITHIN THE SCOPE.
Is,
THIS SET OF DRAWINGS 15 TO BE USED AS A UNIT.
IT MAY REQUIRE WORK INVOLVING REMOTE
CONTRACTOR IS RESPONSIBLE FOR ALL DISCIPLINES,
UTILITY LINES (ELECTRICAL MECHANICAL,
& SHOULD INCLUDE THAT IS NEEDED
E EVERYTHING
PLUMBING, COMMUNICATIONS). ANY WORK IN
FOR MAKING ALL SYSTEMS WORK.
AREAS OUTSIDE OF THE IMMEDIATE SCOPE OF
EXAMPLE: IF A SINK 15 SHOWN IN THE ARCHITECTURAL
WORK SHALL BE ALL - INCLUSIVE, PROVIDING ALL
PLANS, IT 15 ASSUMED THAT THE G.C. IS PROVIDING
STRUCTURES, UTILITIES, FINISHES AND EQUIP,
EVERYTHING NEEDED, A/E WILL PROVIDE THEM
REQUIRED TO RESTORE THE AREA TO FULLY
WITH THE UNDERSTANDING THAT THERE WILL BE
OPERATIONAL CONDITIONS, TO FULLY
NO ADDITIONAL COST TO OWNER,
COMPLYING RATING INTEGRITY, AND TO MEET
OWNER'S APPROVAL ALL WORK AS DESCRIBED
IN THIS NOTE IS TO BE PART OF THE BASE
CONTRACT PRICE, OR CONTRACT CONTINGENCY
ALLOWANCE FOR SUCH WORK.
Class 11 - ICRA
Engineering Maintenance
Staff and Contractors
Environmental Services
Medical /Nursing Staff
Construction and Renovation Activities:
Dust Control:
- Execute work by methods to minimize dust generation from construction or renovation activities.
- Provide active means to minimize dust generation and migration into the atmosphere:
- Use drop sheets to control dust
- Seal windows and unused doors with duct tape
- Seal air vents in construction /renovation area
- Place dust mat at entrance to and exit from work areas
Ventilation-
- Disable the ventilation system in the construction /renovation area until the project is completed.
- Monitor need to change and /or clean filters in construction or renovation area. Pt f�
Debris Removal and Cleanup:'
- Contain debris in covered containers or cover with a moistened sheet wl�'
before transporting the disposal,
Plumbing Activities:
- Collection tanks and long pipes that allow water to stagnate should be avoided.
- Consider hyper chlorinating or superheating stagnant potable water.
Construction and Renovation Activities:
Dust Control:
- Wet mop and vacuum area with a HEPA filtered vacuum as needed and when work is completed.
- Wipe horizontal work surfaces with a disinfectant.
Construction /Renovation Activities:
Risk Reduction:
- Identify high -risk patients who may need to be temporarily moved away from the construction zone.
M AWOADE COUNTY F1
'Y3kY;r�:91Ni*'7iwtiafm$ub< AFVa
1y,
NOTE: Q PROVIDE A PLASTIC DUST ABATEMENT CURTAIN WITH ZIPPER /ENTRANCE
FEATURE FOR DURATION OF WORK IN KITCHEN AREA (5EE MECHANICAL
F_)R,4 u1N_r_:rZ FOR ,4DDITI�) - 1___1 I
E)E1 IOLITION FL,4N LEGEND
RG
EX15TING REINFORCED GONG.
.
COLUMN OR CONCRETE WALL
71-23 -2012
TO REMAIN
AS SHOWN
NEW CONCRETE COLUMN
NEW CONCRETE WALL
EXISTING WALL OR
PARTITION TO REMAIN
WALL OR PARTITION WITH
EXISTING DOOR TO REMAIN
EXISTING WALL OR
PARTITION TO E3E REMOVED
WALL OR PARTITION WITH
EXISTING DOOR TO BE REMOVED
DEMOLITION SYMBOL
(D
(SEE DEMOLITION LEGEND)
DENOTES EXISTING AREAS
OUTSIDE THE SCOPE OF WORK
E)F -ICL ITION NOTES:
REMOVE EXISTING CEILING GRID AND
TILE AS REQUIRED FOR INSTALLATION OF
ICAL UCTS,
2 OR TAPED SHUT. PROV IDE
ICATING "NOT AN EXIT ".
i5ii
SIGNS DURING
ON. I
EXISTING FAN COIL UNIT ABOVE CEILING
TO BE REMOVED. (SEE MECHANICAL
DRAWINGS)
EXISTING FLOOR DRAIN TO CAPPED OFF
EXISTING CO TANK TO BE RELOCATED -
EXTEND LINE'S AS REQUIRED. SEE NEW
PLAN FOR LOCATION
REMOVE ALL DEBRIS, PROVIDE A DEEP
CLEANING OF ENTIRE SPACE AND PREP
SURFACE FOR NEW CONCRETE PAD AND
HVAC UNITS.
EXISTING DOORS TO BE REMOVED
EXISTING FAN TO BE REMOVED. SEE
X /A -4 FOR WALL IN FILL DETAIL.
PROVIDE NEW OPENINGS IN CMU WALL
FOR DUCT PENETRATIONS. SEE SECTION
ON SHEET A -3 FOR ADDITIONAL
INFORMATION.
IO EXISTING DRAIN PIPE TO REMAIN.
COORDINATE WITH NEW OPENING IN CMU
WALL AND INSTALLATION OF NEW
MECHANICAL DUCTS. REPAIR PIPE AS
REQUIRED WITHIN WALL,
It EXISTING EXHAUST HOOD TO REMAIN.
12 REMOVE EXISTING CEILING TILE AND
GRID SOFFIT. PREP FOR NEW CEILING TO
MATCH EXISTING HEIGHT AT
13 PROVIDE DUST PROOF BARRIER OVER
EXISTING EQUIPMENT IN WORK AREA.
PROVIDE A DEEP CLEANING OF AREA
UPON COMPLETION OF WORK.
14 FINAL CONNECTION TO DIFFUSERS TO BE
DONE AFTER HOURS AND COORDINATED
WITH OWNER. PROVIDE DUST -PROOF
BARRIER VIZQUEEN (/o MIL POLY)
SEALED W /DUCT TAPE CONT'S ALL
AROUND WORK AREA WITH ZIPPER
ENTRANCE TO BE CLEANED AND
BARRIER REMOVED UPON COMPLETION
OF WORK PRIOR TO & AM. SEE
MECHANICAL DRAWINGS AND ICRA
REPORT FOR ADDITIONAL INFORMATION).
15 ISOLATE MECHANICAL SYSTEM IN THIS
ROOM TO AVOID CONTAMINATION OF
AHU # 14
I6 REMOVE EXISTING CONDENSING UNIT AND
PORTABLE 12 TON UNIT. USE EXISTING
OPENING IN WALL FOR TEMPORARY
COOLING OF SPACE DURING
CONSTRUCTION, ONCE TEMPORARY
COOLING 15 REMOVED, BLOCK OPENING.
SEE DETAIL X /A -4 FOR WALL IN -FILL
DETAIL. SEE MECHANICAL AND
ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
n EXISTING FAN k DUCTWORK TO BE
REMOVED. PREP WALL FOR INSTALLATION
OF NEW FAN. SEE ELEVATION, NEW PLAN
AND MECH, DRAWINGS.
IS SEE MECH. DWG'S FOR EXTENT OF DUCT
REMOVAL.
v�
H
n
PROJECT AREA
AT FIRST FLOOR
S.W. 61ST. COURT
S. W. 62ND AVE.
Revisions.
I ` AHCA
GOB TIME vTS
A
0
zn�
I.-$ WJ C.;R
Z <�
w H
� a �
w � v
v0
<x
a �w 004
�Z
x0
w z
►ir "�" 4 1
H
a
O
�V
d
Q
16m Q F
+ � N
zw
r-•� 0
a Z
ZA
0 Z
0 Z
W
w V
A �
PERMIT SET
DIRAWN:
RG
CHECKED.
LEN
DATE:
71-23 -2012
SCALE:
AS SHOWN
SEAL t.`s�1 S i A 'go
��, P *•
Sheet No.
A -1
OF
7
JOB # 201131