Loading...
10-965R-001MECHANICAL NOTES MECHANICAL SPECIFICATIONS 4. DUCTWORK CONSTRUCTION MECHANICAL - FIFTH FLOOR PLAN - DEMOLITION 12. CONTROL OF AIRBORNE CONTAMINANTS 1. GENERAL RESPONSIBILITIES OF THE CONTRACTORS THE SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION'S "HVAC THE MECHANICAL CONTRACTOR SHALL ROUTE CONDENSATE DRAIN LINES TO THE EXISTING THE GENERAL, MECHANICAL, AND ELECTRICAL CONTRACTORS AND ALL SUB - CONTRACTORS - DUCT CONSTRUCTION STANDARDS" SHALL BE CONSIDERED PART OF THE SPECIFICATIONS CONDENSATE PIPING UNLESS OTHERWISE NOTED ON THE CONSTRUCTION DOCUMENTS. SHALL INSTRUCT ALL INDIVIDUALS PROVIDING CONSTRUCTION AND RELATED SERVICES IN THE GENERAL, MECHANICAL, AND ELECTRICAL CONTRACTORS SHALL PROVIDE THE LABOR, FOR THIS PROJECT. ANY WORK THAT DOES NOT COMPLY WITH THESE STANDARDS MAY BE CONDENSATE DRAIN LINES SHALL NOT BE ROUTED TO THE SANITARY SEWER SYSTEM. THE MEANS AND METHODS OF PREVENTING THE SPREAD OF CONTAMINANTS TO OCCUPIED MATERIALS, AND EQUIPMENT REQUIRED FOR THE HEATING, VENTILATION, AND AIR REJECTED AT ANY TIME DURING THE PROJECT. o N MECHANICAL, ND ELE TRICAL CONTRACTORS AND ALL SPACES. THE GENERAL, A C CONDITIONING SYSTEMS AS DESCRIBED IN THE COMPLETE SET OF CONSTRUCTION DRAIN PANS AND OTHER ADJACENT THE MECHANICAL CONTRACTOR SHALL INSULATE EACH CONDENSATE DRAIN LINE WITH SUB - CONTRACTORS SHALL KEEP ALL WORK SPACES CLEAN TO PREVENT THE TRANSFER OF T THE REQUIREMENTS F THE 2 7 FLORIDA DOCUMENTS. ALL WORK SHALL CONFORM O H QU S O 00 O ALL EXHAUST AND OUTSIDE AIR DUCTWORK SHALL BE SHEET METAL. ALL EXHAUST ONE-HALF 1 2 IN H ARMAFLEX WHEREVER THAT CONDENSATE DRAIN LINE IS ROUTED WITHIN (! } C EV T GO S CONTAMINANTS INCLUDING AIRBORNE CONTAMINANTS FROM WORK SPACES TO THE BUILDING CODE AND 2007 FLORIDA ENERGY CODE (INCLUDING THE 2009 SUPPLEMENTS), 2005 DUCTWORK SHALL HAVE A ONE -INCH INTERNAL LINER FOR SOUND ATTENUATION. THE STRUCTURE OR THE CONDENSATE MAY OTHERWISE CAUSE DAMAGE. OCCUPIED SPACES AND PARTICULARLY TO PATIENT CARE AREAS. THIS WILL INCLUDE, BUT NATIONAL ELECTRIC CODE, NFPA NATIONAL FIRE CODES, AND ALL OTHER STATE AND LOCAL AND ADJACENT AREAS C)o NOT NECESSARILY BE LIMITED TO, PROVIDING BARRIERS AND /OR ENCLOSURES TO SEPARATE CODES. ALL DUCT DIMENSIONS SHOWN ON THE CONSTRUCTION DOCUMENTS ARE INSIDE CLEAR THE MECHANICAL CONTRACTOR SHALL CLEARLY LABEL ALL CONDENSATE DRAIN LINES TO WORK SPACES FROM OCCUPIED SPACES, ENSURING THAT DOORS AND OTHER OPENINGS DIMENSIONS. THE MECHANICAL CONTRACTOR SHALL PROVIDE FLEXIBLE CONNECTIONS INDICATE CONTENT AND DIRECTION OF FLOW. BETWEEN WORK SPACES AND OCCUPIED SPACES ARE KEPT CLOSED AND PROVIDING O THE OWNER SHALL NOT BE RESPONSIBLE FOR ANY PORTION OF THE SCOPE OF WORK BETWEEN EACH ITEM OF MECHANICAL EQUIPMENT AND ITS ASSOCIATED DUCT(S). ALL ITEMS AIRFLOW RATES ARE LESS THAN 90% OF THE MINIMUM OUTDOOR AIR TEMPORARY BARRIERS AND /OR ENCLOSURES WHEN SHORT -TERM WORK IS REQUIRED IN UNLESS SPECIFICALLY NOTED IN THE CONSTRUCTION DOCUMENTS, OF THE HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM INCLUDING, BUT NOT LIMITED 8. CONTROLS OCCUPIED SPACES. 90 %, OR MUST BE EVALUATED TO DETERMINE IF THE MEASURED RATES TO, AIR HANDLERS, FANS, DUCTWORK, DIFFUSERS, AND GRILLES SHALL NOT BE SUPPORTED ARE IN CONFORMANCE WITH THIS STANDARD THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION SCHEDULES OF BY THE CEILING OR CEILING SUSPENSION SYSTEM, BUT INSTEAD SHALL BE SUPPORTED BY THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL CONTROLS AND SUB - CONTRACT TO THE WHEN THE SCOPE OF WORK INCLUDES THE RENOVATION OF AN EXISTING SPACE OR WHEN, IN ALL TRADES. FIXED WORK SUCH AS DUCTWORK AND SANITARY AND STORM PIPING SHALL BE THE BUILDING STRUCTURE. ELECTRICAL CONTRACTOR ALL CONTROLS POWER AND TRANSFORMERS NOT IDENTIFIED IN NEW CONSTRUCTION, THE EXTERIOR WALLS, ROOF, DOORS, AND GLAZING HAVE BEEN INSTALLED PRIOR TO ANY TRADE WORK THAT CAN BE EASILY RELOCATED OR OFFSET SUCH THE ELECTRICAL PORTION OF THE CONSTRUCTION DOCUMENTS. INSTALLED AND THE BUILDING ENVELOPE CAN BE CLOSED, THE (GENERAUMECHANICAL) AS ELECTRICAL CONDUIT AND FIRE PROTECTION AND WATER PIPING. ALL ELECTRICAL ALL FORTY -FIVE (45) AND NINETY (90) DEGREE ELBOWS SHALL HAVE A ONE AND ONE -HALF (1.5) CONTRACTOR SHALL PROVIDE BARRIERS AND /OR ENCLOSURES TO SEPARATE WORK SPACES CONDUIT AND WATER PIPING SHALL BE INSTALLED AS CLOSE TO WALLS AND AS CLOSE CENTERLINE RADIUS-TO-WIDTH OR RADIUS -TO -DEPTH RATIO OR SHALL BE CONSTRUCTED THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING WHAT IS FROM OCCUPIED SPACES AND ONE OR MORE EXHAUST FANS TO EXHAUST AIR FROM THE TOGETHER AS POSSIBLE TO ALLOW FOR MAXIMUM DUCT ACCESSIBILITY. WITH SINGLE BLADE TURNING VANES. ANGULAR TAPERS SHALL BE LIMITED TO THIRTY (30) REQUIRED TO INCORPORATE NEW MECHANICAL EQUIPMENT AND CONTROLS INTO THE WORK SPACES. WORK SPACES SHALL BE MAINTAINED AT NEGATIVE PRESSURE WITH CHECK MONTHLY DEGREES FOR CONTRACTING TAPERS AND TWENTY (20) DEGREES FOR EXPANDING TAPERS. EXISTING CONTROL SYSTEMS AND INCLUDING ALL COSTS ASSOCIATED WITH O RESPECT TO OCCUPIED SPACES AS REQUIRED BY AHCA, THE TOTAL EXHAUST AIRFLOW ALL CONTRACTORS SHALL COORDINATE THE SCOPE O F THEIR WORK AND THEIR INSPECT THE COOLING COILS FOR DIRT, BENT FINS, ETC. IF THE COILS INCORPORATING NEW MECHANICAL EQUIPMENT AND CONTROLS INTO THE EXISTING Q SHALL PROVIDE A MINIMUM OF TWO 2 AIR CHANGES PER HOUR AND THE EXHAUST FAN (S) CONSTRUCTION SCHEDULES WITH THE OWNER TO PREVENT ANY INTERRUPTIONS FLEXIBLE DUCTWORK SHALL BE THERMARN OR METALFLEX. THE MAXIMUM LENGTH OF NEW CONTROL SYSTEM(S) IN HIS /HER BID. THE CONTROLS CONTRACTOR SHALL PROVIDE A SHALL OPERATE CONTINUOUSLY, THE EXHAUST FAN(S) SHALL DISCHARGE TO THE EXTERIOR UNACCEPTABLE TO THE OWNER. THIS MAY REQUIRE WORK AFTER NORMAL OPERATING FLEXIBLE SUPPLY DUCT SHALL BE V -0". FLEXIBLE RETURN DUCT SHALL NOT BE USED. COMPLETE DESCRIPTION OF THE ENTIRE CONTROL SYSTEM, INCLUDING SCHEMATIC OF THE BUILDING AND THE DISCHARGE SHALL NOT BE LOCATED WITHIN 10' -0" OF ANY AIR HOURS AND /OR ON WEEKENDS. FLEXIBLE DUCT SHALL BE INSTALLED AND SUPPORTED SO AS TO PREVENT THE USE OF DRAWINGS. INTAKE. THE MECHANICAL CONTRACTOR SHALL INSTALL FILTERS ON ALL DUCT OUTLETS AND EVERY SIX MONTHS EXCESS DUCT MATERIAL, PREVENT DISLOCATION OR DAMAGE, AND PREVENT CONSTRICTION INLETS SERVING THE SCOPE OF WORK TO PREVENT ANY CONSTRUCTION DUST FROM IN EQUIPMENT SUBMITTALS, AND CHANGE ORDERS 2. BIDS SHOP DRAWINGS, EQU SU BIDS, � F THE DUCT BELOW THE RATED DUCT DIAMETER. FLEXIBLE DUCT BENDS SHALL MAINTAIN A O UC O U THE MECHANICAL CONTRACTOR SHALL PROVIDE A PROGRAMMABLE THERMOSTAT FOR EACH ENTERING THE DUCTWORK. IF CONSTRUCTION DUST DOES ENTER THE DUCTWORK THEN G E CO S VERIFY THAT ALL DAMPER LINKAGES MOVE FREELY; LUBRICATE WITH CENTERLINE RADIUS OF NOT LESS THAN ONE AND ONE -HALF (1.5) DUCT DIAMETERS. SAGS NEW FAN COIL UNIT AND EXISTING SYSTEMS AS NEEDED. THE MECHANICAL CONTRACTOR THE MECHANICAL CONTRACTOR SHALL HAVE THE DUCTWORK CLEANED AT HIS /HER EXPENSE. EACH PROSPECTIVE CONTRACTOR SHALL EVALUATE THE SCOPE OF WORK THOROUGHLY SHALL NOT EXCEED ONE -HALF (0.5) INCH PER LINEAR FOOT OF FLEXIBLE DUCT. HANGERS, SHALL COORDINATE THE INITIAL OCCUPANCY SCHEDULE(S) AND PROGRAMMING WITH THE THE {GENERAUMECHANICAL) CONTRACTOR SHALL PROVIDE ONE OR MORE PORTABLE AIR PRIOR TO SUBMITTING A BID. SOME CONDUIT, PIPING, AND OTHER OBSTACLES MAY NEED TO SADDLES, AND OTHER SUPPORTS SHALL HAVE A MINIMUM WIDTH OF ONE AND ONE -HALF (1.5) OWNER AND PROVIDE TRAINING AS REQUIRED. ALL PROGRAMMING SHALL BE COMPLETED CLEANERS AND ONE OR MORE VACUUM CLEANERS TO KEEP ALL WORK SPACES CLEAN, BE RELOCATED AND SUCH RELOCATION SHOULD BE INCLUDED IN EACH PROSPECTIVE INCHES. THE MECHANICAL CONTRACTOR SHALL PROVIDE SUPPORT FOR NEW AND EXISTING USING THERMOSTAT PROGRAMMING SOFTWARE. MECHANICAL CONTRACTOR'S BID. FLEXIBLE DUCTWORK IN THE SCOPE OF WORK WITH A MAXIMUM SPACING OF 5' -0% UNLESS CHECK THE SUPPLY FAN BELTS. IF THE BELTS ARE FRAYED OR WORN WHEN AIR HANDLING SYSTEMS ARE TO BE MADE OPERATIONAL IN PHASES, THE MECHANICAL OTHERWISE NOTED ON THE CONSTRUCTION DOCUMENTS OR AUTHORIZED BY THE EACH THERMOSTAT HUMIDISTAT AND TEMPERATURE SENSOR SHALL BE INSTALLED AT 4'-6" CONTRACTOR SHALL MAKE PROVISIONS FOR MAINTAINING THE OPERATION OF EACH AIR EACH PROSPECTIVE MECHANICAL CONTRACTOR SHALL PROVIDE A DETAILED COST MECHANICAL ENGINEER. ABOVE THE FINISHED FLOOR UNLESS OTHERWISE NOTED ON THE CONSTRUCTION HANDLING SYSTEM AND PROVIDING THE REQUIRED AIR PRESSURE BALANCES IN THE BREAKDOWN FOR EACH TASK IN THE SCOPE OF WORK AS SHOWN ON THE CONSTRUCTION DOCUMENTS, THE MECHANICAL CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF COMPLETED PHASES OF THE SCOPE OF WORK WHILE LATER PHASES OF THE SCOPE OF DOCUMENTS, INCLUDING EQUIPMENT, MATERIALS, AND LABOR. ANY PROPOSED SURFACES UPON WHICH CLOSURE OR SEALING PRODUCTS ARE TO BE APPLIED SHALL BE EACH THERMOSTAT, HUMIDISTAT, AND TEMPERATURE SENSOR WITH THE ARCHITECT AND WORK ARE UNDER CONSTRUCTION, THIS MAY INCLUDE, BUT NOT NECESSARILY BE LIMITED VALUE - ENGINEERING, INCLUDING SUBSTITUTIONS FOR SCHEDULED EQUIPMENT, SHALL BE CLEAN AND DRY IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. OWNER AND SUBMIT THE PROPOSED LOCATION TO THE MECHANICAL ENGINEER FOR TO, ADJUSTING AIRFLOWS, CLOSING DAMPERS, BLANKING -OFF DIFFUSERS AND GRILLES, AND IM T BREAKDOWN. THE COPE PRESENTED SEPARATELY AS AN ALTERNATE WITH A SIMILAR COS 0 SCOPE NON-MIGRATING RATING MASTIC OR ALL DUCTWORK SHALL BE SEALED WITH A NO G O G APPROVAL, THE MECHANICAL CONTRACTOR SHALL PROVIDE COORDINATION OF ALL PROVIDING TEMPORARY BYPASS DUCTWORK. OF WORK SHALL BE BID WITH THE SCHEDULED EQUIPMENT AND ANY PROPOSED LIQUID ELASTIC SEALANT AS REQUIRED TO MEET THE 2007 FLORIDA ENERGY CODE THERMOSTAT, HUMIDISTAT, AND TEMPERATURE SENSOR FINISHES WITH ROOM FINISHES AT VALUE - ENGINEERING OR EQUIPMENT SUBSTITUTIONS SHALL BE IDENTIFIED AS ALTERNATE (INCLUDING THE 2009 SUPPLEMENTS), THE MECHANICAL CONTRACTOR SHALL PROVIDE NO ADDITIONAL COST TO THE OWNER, IMMEDIATELY PRIOR TO FINAL COMPLETION, THE MECHANICAL CONTRACTOR SHALL REMOVE DEDUCTIONS F R OM THE CONTRACTORS BASE BID. ANY CHANGE ORDERS MUST BE 0 HOT - DIPPED GALVANIZED STEEL FASTENERS, ANCHORS, RODS, STRAPS, TRIM, AND ANGLES ALL TEMPORARY DUCTWORK AND /OR PIPING AND THE TEST AND BALANCE CONTRACTOR SUBMITTED WITH BOTH THE ORIGINAL COST BREAKDOWN AND THE NEW COST BREAKDOWN FOR INTERIOR DUCTWORK SUPPORTS. INTERIOR DUCTWORK SUPPORT SPACING SHALL NOT 9. TESTING AND BALANCING THE HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM SHALL BALANCE ALL NEW AIR HANDLING SYSTEMS AND REBALANCE ANY EXISTING AIR FOR COMPARISON. EXCEED 5' -0". HANDLING SYSTEMS AFFECTED BY ANY PHASE OF THE SCOPE OF WORK. THE CONTRACTOR SHALL PROVIDE THE SERVICES OF AN INDEPENDENT TEST AND BALANCE I STARTING THE PROJECT, THE MECHANICAL CONTRACTOR SHALL STUDY THE PRIOR TO ST R G O THE MECHANICAL CONTRACTOR SHALL PROVIDE INSULATION WITH A MINIMUM R -VALUE OF SIX AGENCY TO TEST BALANCE AND CERTIFY THE PERFORMANCE OF THE COMPLETE HEATING COMPLETE SET OF CONSTRUCTION DOCUMENTS AND COORDINATE WITH THE OTHER TRADES (6) ON ALL DUCTWORK. CONCEALED DUCTWORK MAY BE INSULATED WITH FLEXIBLE VENTILATION, AND AIR CONDITIONING SYSTEM, TO INCLUDE SUPPLY, RETURN, OUTSIDE / EMIT TO THE MECHANICAL ENGINEER FOR AS REQUIRED TO PROVIDE SHOP DRAWINGS TO SUBMIT FIBERGLASS INSULATION, BUT ALL EXPOSED DUCTWORK (INCLUDING DUCTWORK LOCATED IN - I M L A CHILLED AND WATER SYSTEMS. THE MAKE-UP, AND EXHAUST AIR SYSTEMS, AS WELL S CH E APPROVAL. THE SHOP DRAWINGS MAY BE SUBMITTED AS HAND -DRAWN NOTES UPON A COPY MECHANICAL ROOMS) MUST BE INSULATED WITH FIBROUS DUCTBOARD. ALL DUCTWORK TEST AND BALANCE CONTRACTOR SHALL PERFORM ALL TESTING, ADJUSTING, BALANCING, OF THE CONSTRUCTION DOCUMENTS IF PERMISSION IS OBTAINED FROM THE MECHANICAL INSULATION, FITTINGS, COVERS, AND FINISHES SHALL HAVE A MAXIMUM FLAME SPREAD AND DATA RECORDING NECESSARY TO ESTABLISH THE CAPACITY AND QUALITY OF THE ENGINEER. THE CONSTRUCTION DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND INTENDED RATING OF 25, A MAXIMUM SMOKE DEVELOPMENT RATING 50, AND SHALL BE IN SYSTEMS AND CONFIRM THE SATISFACTORY COMPLETION OF ALL ASPECTS OF THE SCOPE OF SOLELY TO CLARIFY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF COMPLIANCE WITH NFPA 90A. PROVIDE MINIMUM OF 112" FIBERGLASS WITH FOIUSCRIM VAPOR WORK. THIS WILL INCLUDE NOT ONLY THE NEW SYSTEMS, BUT ALSO ALL OF THE EXISTING SYSTEMS, THE CONSTRUCTION DOCUMENTS ARE NOT INTENDED TO ALERT THE BARRIER ON THE BACK PAN OF ALL NEW AIR DEVICES. SYSTEMS THAT HAVE BEEN MODIFIED. CONTRACTORS OF ALL OBSTACLES. THE SHOP DRAWINGS SHALL SHOW THE COORDINATION 3 OF DUCTWORK AND MECHANICAL EQUIPMENT INSTALLATION WITH EXISTING AND NEW THE MECHANICAL CONTRACTOR SHALL PROVIDE AN OPPOSED-BLADE VOLUME DAMPER FOR THE TEST AND BALANCE CONTRACTOR SHALL BE AN APPROVED MEMBER OF THE AA LA NBl OBSTACLES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL CONDUITS, FIRE PROTECTION EVERY RECTANGULAR BRANCH AND OUTLET AND AT EVERY RECTANGULAR TAKE-OFF FORA OR NEBB AND SHALL SPECIALIZE IN THE TESTING AND BALANCING OF HEATING, VENTILATION, PIPING, RAIN LEADERS, SANITARY DRAINS, STRUCTURAL MEMBERS, AND WATER PIPING, AS DIFFUSER OR GRILLE. (ROUND OR OVAL BRANCHES, OUTLETS, AND TAKE OFFS FOR AND AIR CONDITIONING SYSTEMS. THE FOLLOWING TEST AND BALANCE CONTRACTORS ARE WELL AS THE MECHANICAL EQUIPMENT MANUFACTURER'S RECOMMENDED CLEARANCES. THE DIFFUSERS AND GRILLES SHALL BE PROVIDED WITH STANDARD VOLUME DAMPERS.) NOT ALL PRE- APPROVED: THE PHOENIX AGENCY, SOUTHERN INDEPENDENT TESTING AGENCY, TEST . MECHANICAL CONTRACTOR SHALL ALSO SHOW THE EXISTING CONDITIONS ON THE SHOP DAMPERS ARE SHOWN ON THE CONSTRUCTION DOCUMENTS. HOWEVER, DAMPERS ARE AND BALANCE CORPORATION, AND SPEC TECH CONSULTANTS. THE MECHANICAL DRAWINGS WHERE THE EXISTING CONDITIONS ARE DIFFERENT FROM THOSE SHOWN ON THE REQUIRED FOR EVERY BRANCH, OUTLET, AND TAKE -OFF (EXCEPT FOR VAV BOXES }. SOME CONTRACTOR SHALL SUBMIT ANY NON- PRE - APPROVED TESTAND BALANCE CONTRACTOR TO CONSTRUCTION DOCUMENTS. DAMPERS MAY BE REQUIRED AFTER TRANSITIONS. THE MECHANICAL ENGINEER FOR APPROVAL PRIOR TO SUBMITTING A BID. PRIOR TO STARTING THE PROJECT, THE MECHANICAL CONTRACTOR SHALL STUDY THE THE MECHANICAL CONTRACTOR SHALL ATTACH A BRIGHTLY - COLORED STRIP OF PLASTIC THE TEST AND BALANCE CONTRACTOR SHALL ENSURE THAT THE SPACE IS UNDER NEUTRAL COMPLETE SET OF CONSTRUCTION DOCUMENTS AND COORDINATE WITH THE TAPE TO EVERY VOLUME DAMPER, EXCEPT THOSE THE HEAD OF A DIFFUSER OR GRILLE. PRESSURE AT THE CONCLUSION OF THE TEST AND BALANCE PROCESS. IF THE BUILDING IS MANUFACTURERS AS REQUIRED TO PROVIDE EQUIPMENT SUBMITTALS TO SUBMIT TO THE THE STRIP SHALL BE OF SUFFICIENT LENGTH TO HANG A MINIMUM OF 12" BELOW THE BOTTOM NOT UNDER NEUTRAL PRESSURE AT THE CONCLUSION OF THE TEST AND BALANCE PROCESS, MECHANICAL ENGINEER FOR APPROVAL. THE EQUIPMENT SUBMITTALS SHALL INCLUDE OF THE ASSOCIATED DUCT. THEN THE TEST AND BALANCE AND MECHANICAL CONTRACTORS SHALL IMMEDIATELY AND DIMENSIONS, WEIGHTS, SPECIFIED ACCESSORIES AND REQUIRED CLEARANCES, AS WELL AS WITHOUT DELAY NOTIFY THE ARCHITECT AND MECHANICAL ENGINEER. FAN CURVES, SOUND LEVELS, CONSTRUCTION DETAILS, WARRANTY INFORMATION, AND ALL OTHER RELEVANT DATA PRESENTED IN THE SAME FORMAT AS THE EQUIPMENT SCHEDULES THE MECHANICAL CONTRACTOR SHALL CLEARLY AND PERMANENTLY MARK EACH VOLUME THE TEST AND BALANCE CONTRACTOR SHALL, UPON COMPLETION OF ALL NECESSARY ON THE CONSTRUCTION DOCUMENTS. DAMPER'S OPEN AND CLOSED POSITIONS, THE MECHANICAL CONTRACTOR SHALL PROVIDE A TESTING AND BALANCING AND AT LEAST ONE (1) WEEK PRIOR TO SUBSTANTIAL COMPLETION, VOLUME DAMPER WITH A 2" STANDOFF WITH A LOCKING QUADRANT THAT IS 24 GAUGES OR 2 GAUGES HEAVIER. SUBMIT THREE (3) BOUND COPIES OF THE TESTAND BALANCE REPORT TO THE MECHANICAL THE MECHANICAL ENGINEER'S APPROVAL OF THE SHOP DRAWINGS AND EQUIPMENT ENGINEER. SUBMITTALS DOES NOT IN ANY WAY RELIEVE THE MECHANICAL CONTRACTOR FROM HIS /HER RESPONSIBILITY TO FURNISH EQUIPMENT AND MATERIALS AND /OR PERFORM WORK AS ALL DUCT SHALL MEET THE FOLLOWING CONSTRUCTION REQUIREMENTS: THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS/HER BID THE COST OF ANY SHEAVE REQUIRED BY THE CONSTRUCTION DOCUMENTS. THE MECHANICAL ENGINEER MAY REQUIRE .ALL SUPPLY FOR THE FIRST TWENTY (20) FEET FROM THE SUPPLY SIDE OF THE AIR CHANGES REQUIRED FOR REBALANCING THE SYSTEM. WHEN BALANCING AN AIR HANDLER THE MECHANICAL CONTRACTOR REDO ANY WORK THAT DOES NOT MEET THE DESIGN HANDLER'S FLEXIBLE CONNECTION: 4.0 IWG POSITIVE STATIC PRESSURE AND VELOCITIES EQUIPPED WITH A VARIABLE FREQUENCY DRIVE, THE TEST AND BALANCE AND MECHANICAL INTENT OF THE MECHANICAL ENGINEER OR THE MECHANICAL ENGINEER MAY REQUIRE A LESS THAN 4000 FPM. CONTRACTORS SHALL PROVIDE A FAN MOTOR SHEAVE THAT CREATES THE MAXIMUM CREDIT TO THE OWNER. AIRFLOW POSSIBLE WITHOUT OVERLOADING THE FAN MOTOR WHEN THE VARIABLE ALTERNATIVES TO THE SCHEDULED EQUIPMENT AND MATERIALS MUST BE EQUAL TO OR • ALL RETURN FOR THE FIRST TWENTY (20) FEET FROM RETURN SIDE OF THE AIR FREQUENCY DRIVE IS IN FULL BYPASS MODE. THE VARIABLE FREQUENCY DRIVE SHALL THEN EXCEED THOSE SCHEDULED. IF SUBSTITUTIONS FOR SCHEDULED EQUIPMENT AND HANDLER'S FLEXIBLE CONNECTION: 4.0 IWG NEGATIVE STATIC PRESSURE AND BE USED TO BALANCE THE AIR HANDLER TO PROVIDE THE DESIGN AIRFLOW, MATERIALS ARE TO BE MADE, THEN THE MECHANICAL CONTRACTOR SHALL FIRST SUBMIT TO VELOCITIES LESS THAN 4000 FPM. THE TEST AND BALANCE CONTRACTOR SHALL PRE-TEST AND RECORD ALL SUPPLY, RETURN, THE MECHANICAL ENGINEER COMPARATIVE LITERATURE CLEARLY SHOWING THE EQUIVALENT • SUPPLY DUCTWORK (UPSTREAM OF ANY VAV): 2.0 IWG POSITIVE STATIC PRESSURE AND EXHAUST, AND OUTSIDE AIRFLOWS FOR THE EXISTING MECHANICAL EQUIPMENT SERVING THE OPERATING CAPABILITIES AND OTHER PROPERTIES OF THE SUBSTITUTIONS. ALL DEVIATIONS 5TH FLOOR. MUST BE CLEARLY IDENTIFIED AND A REQUEST MUST BE MADE SPECIFIC FOR ALL DEVIATIONS. VELOCITIES LESS THAN 2500 FPM. WHEN SUBSTITUTIONS ARE MADE, THE CONTRACTOR ASSUMES FULL RESPONSIBILITY OF COORDINATING WITH OTHER TRADES ON ANY CHANGES REQUIRED FOR THE SUBSTITUTION, • SUPPLY DUCTWORK (DOWNSTREAM OF ANY VAV): 1.0 IWG POSITIVE STATIC PRESSURE THE TEST AND BALANCE CONTRACTOR SHALL OBTAIN THE RECORD DRAWINGS TO USE AS A INCLUDING CASTS, ASSOCIATED WITH DUCTWORK, PIPING, ELECTRICAL AND STRUCTURAL TO AND VELOCITIES LESS THAN 1600 FPM. REFERENCE. THE TEST AND BALANCE CONTRACTOR SHALL MEET WITH THE MECHANICAL IMPLEMENT THE SUBSTITUTED ITEM(S). • ALL OTHER RETURN DUCTWORK: 1.0 IWG NEGATIVE STATIC PRESSURE AND VELOCITIES ENGINEER TO IDENTIFY ANY SYSTEM AIRFLOW DEFICIENCIES SO THAT THE MECHANICAL ENGINEER MAY PROVIDE DIRECTION AS TO HOW THE EXISTING SYSTEMS SHALL BE THE MECHANICAL CONTRACTOR SHALL VERIFY THE LOCATIONS OF THE DIFFUSERS AND LESS THAN 1600 FOW- REBALANCED AFTER THE NEW AIR DISTRIBUTION IS COMPLETED. GRILLES AND SUBMIT REQUEST -FOR- INFORMATION IF THERE IS A CONFLICT BETWEEN THE ARCHITECTURAL AND MECHANICAL PORTIONS OF THE CONSTRUCTION DOCUMENTS, THE • ALL EXHAUST AND OUTSIDE AIR DUCTWORK: 1.0 IWG POSITIVE OR NEGATIVE STATIC THE TEST AND BALANCE CONTRACTOR SHALL BALANCE THE SCOPE OF WORK AS SHOWN ON MECHANICAL CONTRACTOR SHALL ALSO VERIFY THE TYPES OF CEILINGS IN THE SCOPE OF PRESSURE AND VELOCITIES LESS THAN 1600 FPM. THE CONSTRUCTION DOCUMENTS AND RETURN AREAS OUTSIDE OF THE SCOPE OF WORK WORK PRIOR TO ORDERING DIFFUSERS AND GRILLES. FOR DIFFUSERS AND GRILLES AND SERVED BY EXISTING SYSTEMS WITHIN THE SCOPE OF WORK TO THE ORIGINAL DESIGN LOCATED IN PLASTER OR GYPSUM CEILINGS, THE MECHANICAL CONTRACTOR SHALL PROVIDE • ALL TRANSFER DUCTWORK: 0.5 IWG POSITIVE OR NEGATIVE STATIC PRESSURE AND AIRFLOWS OR RE- BALANCE THE ORIGINAL DESIGN AIRFLOWS IN LOCATIONS WHERE THE METALAIRE MODEL TBPF / TITUS MODEL TRM PLASTER FRAMES. THE FRAMES MAY BE VELOCITIES LESS THAN 500 FPM. EXISTING SYSTEM MAY NOT BE BALANCED PROPERLY. ALUMINUM IN NON - FIRE -RATED CEILINGS BUT MUST BE STEEL IN FIRE -RATED CEILINGS. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE FINISH OF ALL DIFFUSERS AND GRILLES, • ANY OTHER DUCTWORK: REFER TO SMACNA "HVAC DUCT CONSTRUCTION STANDARDS ". EXPOSED DUCTWORK, GRAVITY VENTILATORS, LOUVERS, AND WALL CAPS WITH THE 10. SUBSTANTIAL AND FINAL COMPLETION ARCHITECT. ALL VISIBLE EXTERIOR COMPONENTS (SUCH AS EXPOSED DUCTWORK AND 5. DUCT LEAKAGE PERFORMANCE THE MECHANICAL CONTRACTOR SHALL MAINTAIN A SET OF CONTINUOUSLY UPDATED, LOUVERS} SHALL BE PROVIDED WITH APAINT -GRIP FINISH. DUCT CONSTRUCTION AND SEALING SYSTEMS SHALL MEET THE REQUIREMENTS OF THE 2007 REPRODUCIBLE AS -BUILT DRAWINGS DURING CONSTRUCTION AND PROVIDE A COMPLETE SET 3. MECHANICAL EQUIPMENT INSTALLATION FLORIDA ENERGY CODE (INCLUDING THE 2009 SUPPLEMENTS) AND SMACNA'S "HVAC DUCT OF THOSE DRAWINGS IN BOTH ELECTRONIC AND HARDCOPY FORMATS TO THE OWNER UPON CONSTRUCTION STANDARDS ", IF THERE IS A CONFLICT AMONG THE STANDARDS, THEN THE FINAL COMPLETION, ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED AS REQUIRED BY THE MANUFACTURER'S' MORE STRINGENT STANDARD SHALL BE ENFORCED. INSTALLATION AND MAINTENANCE MANUALS. THOSE MANUALS WILL TYPICALLY PROVIDE THE MECHANICAL CONTRACTOR SHALL CLEAN ALL COOLING AND HEATING COILS, MORE DETAIL THAN THE CONSTRUCTION DOCUMENTS. IF THERE IS A CONFLICT BETWEEN THE MECHANICAL CONTRACTOR SHALL SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, CONDENSATE PANS, AND CONDENSATE DRAIN LINES PRIOR TO SUBSTANTIAL COMPLETION. THE INSTALLATION AND MAINTENANCE MANUALS AND THE CONSTRUCTION DOCUMENTS, THEN AND DUCT WALL PENETRATIONS TO A MAXIMUM ALLOWABLE DUCT LEAKAGE CLASS OF THREE' MECHANICAL CONTRACTOR SHALL ALSO REPLACE ALL FILTERS AND BELTS PRIOR TO THE MECHANICAL CONTRACTOR SHALL SUBMIT A REQUEST- FOR - INFORMATION TO THE (3) CFM PER 100 SQUARE FEET OF DUCT AREA (1,5 %) FOR ROUND DUCT AND SIX (6) CFM PER SUBSTANTIAL COMPLETION AND PROVIDE TWO (3) COMPLETE REPLACEMENT SETS OF MECHANICAL ENGINEER. 100 SQUARE FEET OF DUCT AREA (3 %) FOR ALL OTHER DUCT TYPES, UNLESS OTHERWISE FILTERS AND (2) SETS OF BELTS FOR ALL MECHANICAL EQUIPMENT TO THE OWNER UPON NOTED ON THE CONSTRUCTION DOCUMENTS OR AUTHORIZED BY THE MECHANICAL FINAL COMPLETION. THE MECHANICAL CONTRACTOR SHALL PROVIDE VIBRATION ISOLATION AS RECOMMENDED BY ENGINEER. TRANSVERSE JOINTS ARE CONNECTIONS OF TWO DUCT OR FITTING ELEMENTS THE MANUFACTURERS AND /OR REQUIRED BY THE MECHANICAL ENGINEER TO ENSURE QUIET ORIENTED PERPENDICULAR TO THE DIRECTION OF THE AIRFLOW. LONGITUDINAL SEAMS ARE THE MECHANICAL AND ELECTRICAL CONTRACTORS SHALL PROVIDE FIVE (5) BOUND COPIES OPERATION OF THE MECHANICAL EQUIPMENT. NO UNDUE VIBRATION OR SOUND SHALL BE JOINTS ORIENTED IN THE DIRECTION OF THE AIRFLOW. DUCT WALL PENETRATIONS ARE OF ALL MECHANICAL AND ELECTRICAL CONTRACTOR WARRANTIES, MANUFACTURER'S TRANSMITTED TO THE STRUCTURE OR ANY OCCUPIED SPACES WITHIN THE STRUCTURE. OPENINGS MADE BY SCREWS, NON - SELF - SEALING FASTENERS, PIPES, TUBING, RODS, AND WARRANTIES, PARTS LISTS, AND INSTALLATION AND MAINTENANCE MANUALS FOR ALL WIRE. ROUND AND FLAT -OVAL SPIRAL LOCK SEAMS NEED NOT BE SEALED PRIOR TO MECHANICAL EQUIPMENT, AS WELL AS INSTRUCTIONS FOR OPERATING AND MAINTAINING ALL THE MECHANICAL CONTRACTOR SHALL PROVIDE FILTER RACKS FOR THE MECHANICAL ASSEMBLY BUT SHALL BE COATED AFTER ASSEMBLY TO REDUCE LEAKAGE. ALL OTHER MECHANICAL EQUIPMENT TO THE OWNER UPON FINAL COMPLETION. EQUIPMENT AS REQUIRED. THE FILTER RACKS SHALL BE INSTALLED SUCH THAT SUFFICIENT CONNECTIONS ARE CONSIDERED TRANSVERSE JOINTS INCLUDING, BUT NOT LIMITED TO, CLEARANCES ARE PROVIDED FOR MAINTENANCE AND SHALL BE SEALED AIRTIGHT. THE SPIN -INS, TAPS OR OTHER BRANCH CONNECTIONS, ACCESS DOOR FRAMES, AND DUCT 11. AHCA PROJECTS MECHANICAL CONTRACTOR SHALL PROVIDE A TOTAL OF THREE (3) COMPLETE SETS OF CONNECTIONS TO EQUIPMENT. MORE INFORMATION IS AVAILABLE IN CHAPTER 35 OF FILTERS FOR ALL MECHANICAL EQUIPMENT IN THE SIZE AND ARRANGEMENT RECOMMENDED ASHRAE'S 'FUNDAMENTALS HANDBOOK". THE GENERAL, MECHANICAL, AND ELECTRICAL CONTRACTORS SHALL REVIEW, UNDERSTAND, BY THE MANUFACTURER. THE FILTERS SHALL PROVIDE ASHRAE FILTRATION EFFICIENCY AS AND FULLY IMPLEMENT THE OWNER'S INFECTION CONTROL RISK ASSESSMENT (ICRA) PLAN. SHOWN ON THE CONSTRUCTION DOCUMENTS OR 30% ASHRAE FILTRATION EFFICIENCY (MERV EXISTING DUCTWORK, SHALL BE RESEALED CLASS "A" AND SHALL HAVE THE INSULATION 6} IF NO HIGHER VALUE IS SPECIFIED. REPLACED TO REDUCE LEAKAGE. ALL AIR HANDLERS AND FANS SHALL SHUT DOWN IF A FIRE ALARM IS ACTIVATED. ALL FANS SERVING AN AREA SERVED BY ONLY ONE AIR HANDLER SHALL BE INTERLOCKED WITH THE THE MECHANICAL CONTRACTOR SHALL PROVIDE A SECONDARY DRAIN PAN AND A FLOAT 6. ACCESS PANELS, FIRE DAMPERS, AND FIRE/SMOKE DAMPERS ASSOCIATED AIR HANDLER. SWITCH UNDER EACH AIR HANDLER OR FAN COIL UNIT, THE FLOAT SWITCH SHALL SHUT ITS ASSOCIATED AIR HANDLER DOWN IF OVERFLOW IS DETECTED. THE MECHANICAL CONTRACTORS SHALL PROVIDE ACCESS PANELS TO ALLOW ACCESS TO ALL FILTER HOUSING FRAME BLANK OFF PANELS SHALL BE CONSTRUCTED OF RIGID VOLUME DAMPERS ABOVE PLASTER OR GYPSUM CEILINGS, TURNING VANES, FIRE DAMPERS, MATERIALS, HAVE A SEALING SURFACE AREA EQUAL TO OR GREATER THAN THE SURFACE THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL STARTERS, CONTACTORS, RELAYS, FIRE/SMOKE DAMPERS, DUCT - MOUNTED SMOKE DETECTORS, AND WHERE REQUIRED FOR THE AREA OF THE NORMALLY - INSTALLED FILTER MEDIA, AND BE PERMANENTLY ATTACHED TO THE CONTROLS, AND ACCESSORIES NECESSARY TO PROVIDE A COMPLETE AND WORKING POWER MAINTENANCE OF ALL MECHANICAL EQUIPMENT. ACCESS PANELS SHALL HAVE A FIRE RATING FILTER HOUSING FRAME. AND CONTROL SYSTEM FOR THE MECHANICAL EQUIPMENT WITHIN THE SCOPE OF WORK. THE EQUAL TO THE PENETRATED ASSEMBLY, WITH A MINIMUM FIRE RATING OF ONE (1) HOUR. ELECTRICAL CONTRACTOR WILL PROVIDE ALL DISCONNECT SWITCHES, CONDUIT, AND WIRING WHEN THE SCOPE OF WORK INCLUDES THE RENOVATION OF AN EXISTING SPACE AND FOR THE MECHANICAL EQUIPMENT WITHIN THE SCOPE OF WORK. ALL ELECTRICAL WORK THE MECHANICAL CONTRACTOR SHALL ATTACH A BRIGHTLY - COLORED STRIP OF PLASTIC EXISTING SUPPLY, RETURN, AND /OR EXHAUST AIR DUCTWORK AND ASSOCIATED AIR SHALL COMPLY WITH THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE. THE TAPE TO EVERY DUCT - MOUNTED ACCESS PANEL. THE STRIP SHALL BE OF SUFFICIENT LENGTH DISTRIBUTION OUTLETS ARE TO BE REMOVED, THE DUCTWORK AND AIR DISTRIBUTION MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER OPERATION OF THE TO HANG A MINIMUM OF 12" BELOW THE BOTTOM OF THE ASSOCIATED DUCT. OUTLETS SHALL BE REMOVED IN ACCORDANCE WITH THE PHASING REQUIREMENTS LISTED IN COMPLETE SYSTEM AND SHALL ENSURE THAT WIRING DIAGRAMS ARE PROVIDED TO THE THE CONSTRUCTION DOCUMENTS. OWNER. NO WIRING OF ANY KIND SHALL BE EXPOSED IN FINISHED AREAS, THE MECHANICAL CONTRACTOR SHALL PROVIDE A FIRE DAMPER AT EVERY DUCT PENETRATION OF A FIRE -RATED ASSEMBLY AND AFIRE /SMOKE DAMPER WITH A MINIMUM THE OPERATION OF EXISTING SYSTEMS SHALL BE MAINTAINED IN THE SPACE(S) UNDER THE MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL MECHANICAL EQUIPMENT IS FIRE/SMOKE RATING OF TWO (2) HOURS AT EVERY DUCT PENETRATION OF A SMOKE CONSTRUCTION UNTIL ALL NEW SYSTEMS ARE FULLY OPERATIONAL. THE MECHANICAL STARTED, TESTED, ADJUSTED, AND PLACED IN SATISFACTORY OPERATING CONDITION PRIOR ASSEMBLY OR CHASE. EACH FIREISMOKE DAMPER SHALL CLOSE CONTRACTOR SHALL INCLUDE IN HIS /HER BID ALL COSTS ASSOCIATED MAINTAINING THE TO SUBSTANTIAL COMPLETION. THE MECHANICAL CONTRACTOR SHALL GUARANTEE ALL EXISTING SYSTEMS OPERATION. THESE COSTS MAY INCLUDE, BUT NOT NECESSARILY BE WORKMANSHIP, MATERIALS, AND MECHANICAL EQUIPMENT TO BE FREE OF DEFECTS FOR A AND THE ASSOCIATED AIR HANDLER SHALL SHUT DOWN IF EITHER OF THE AIR HANDLER'S OR LIMITED TO, THE FOLLOWING ITEMS: PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER AND SHALL THE SPACE'S SMOKE DETECTORS ARE ACTIVATED. REPAIR ANY DEFECTS OCCURRING WITHIN THAT TIME WITHOUT COST TO THE OWNER. ALL A.TEMPORARY OR PERMANENT RELOCATION OF EXISTING DUCTWORK AND /OR PIPING TO MECHANICAL EQUIPMENT IN THE SCOPE OF WORK SHALL BE COVERED FOR THE DURATION OF THE MECHANICAL CONTRACTOR SHALL PROVIDE ADDITIONAL DUCTWORK AND PIPING ACCOMMODATE THE INSTALLATION OF NEW SYSTEM COMPONENTS. THE MANUFACTURER'S GUARANTEES OR WARRANTIES AND THE SUPPORTS WITHIN EIGHTEEN (I 8) INCHES OF BOTH SIDES OF ALL FIRE -RATED ASSEMBLIES. B. TEMPORARY CHILLED AND /OR HEATING HOT WATER LINES. DUCTWORK AND PIPING SHALL NOT BE SUPPORTED BY FIRE -RATED WALLS, BUT INSTEAD C,.TEMPORARY INSULATED FLEXIBLE DUCTWORK AND /OR BYPASS DUCTWORK. CONTRACTOR SHALL PROVIDE THE OWNER WITH ORIGINALS OF ALL MANUFACTURER'S SHALL BE SUPPORTED BY THE BUILDING STRUCTURE. D.TEMPORARY POWER AND /OR HEAT. GUARANTEES AND WARRANTIES. ALL COMPRESSORS SHALL BE PROVIDED WITH A MINIMUM E. TEMPORARY RE- BALANCING OF ONE OR MORE EXISTING SYSTEMS TO MAINTAIN FIVE (5) YEAR WARRANTY. 7. CONDENSATE DRAIN LINES REQUIRED AIR CHANGES AND /OR PRESSURE RELATIONSHIPS. THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL EQUIPMENT VOLTAGE CONDENSATE DRAIN LINES SHALL BE CONSTRUCTED OF COPPER (TYPE '12 OR HEAVIER), OR REQUIREMENTS WITH THE VOLTAGE AVAILABLE AT THE PROJECT SITE PRIOR TO ORDERING GALVANIZED STEEL (MINIMUM SCHEDULE 40). THE MECHANICAL CONTRACTOR SHALL PROVIDE ANY MECHANICAL EQUIPMENT, A P -TRAP AT EACH FAN COIL'S CONDENSATE DRAIN LINE CONNECTION. EACH CONDENSATE . DRAIN LINE SHALL BE SLOPED DOWN A MINIMUM OF ONE - EIGHTH (1/8) INCH PER LINEAR FOOT THE MECHANICAL CONTRACTOR SHALL RETURN ANY EXISTING MECHANICAL EQUIPMENT IN TOWARD THE ASSOCIATED POINT OF DISCHARGE. THE SCOPE OF WORK AS REQUESTED BY THE OWNER. THE MECHANICAL CONTRACTOR SHALL REMOVE EXISTING MECHANICAL EQUIPMENT NOT REQUESTED BY THE OWNER FROM THE DIAMETER OF THE CONDENSATE DRAIN LINE SHALL BE EQUAL TO OR GREATER THAN THE THE PROJECT SITE AND DISPOSE OF IT IN ACCORDANCE WITH ALL APPLICABLE LAWS. CONDENSATE DRAIN LINE CONNECTION. TO AVOID EXCESSIVE DIPS IN AND TO PREVENT ANY SHIFTING OF THE CONDENSATE DRAIN LINES, THE MECHANICAL CONTRACTOR SHALL PROVIDE SUPPORTS AT THE FOLLOWING INTERVALS: THREE (3) FEET FOR CONDENSATE DRAIN LINES CONSTRUCTED OF PVC, SIX (6) FEET FOR CONDENSATE DRAIN LINES CONSTRUCTED OF COPPER, AND TEN (10) FEET FOR CONDENSATE LINES CONSTRUCTED OF STEEL. CONDENSATE DRAIN LINE SUPPORTS SHALL BE FIXED SOLIDLY IN PLACE. MECHANICAL SHEET INDEX M0.1 MECHANICAL GENERAL SPECS, LEGEND, AND NOTES M1.0 MECHANICAL - FIFTH FLOOR PLAN - DEMOLITION M2.0 MECHANICAL - FIFTH FLOOR PLAN - RENOVATION M3.0 MECHANICAL DETAILS APPLICABLE CODES AND STANDARDS: 2007 FLORIDA BUILDING CODE WITH 2009 SUPPLEMENTS 2007 FLORIDA MECHANICAL CODE WITH 2009 SUPPLEMENTS 2007 FLORIDA PLUMBING CODE WITH 2009 SUPPLEMENTS 2007 FLORIDA FUEL GAS CODE WITH 2009 SUPPLEMENTS 2007 FLORIDA ENERGY CODE WITH 2009 SUPPLEMENTS 2007 FLORIDA FIRE PREVENTION CODE WITH 2009 SUPPLEMENTS UNIFORM FIRE SAFETY STANDARDS AS ADOPTED BY THE STATE FIRE MARSHAL NATIONAL ELECTRIC CODE, 2005 EDITION 2006 GUIDELINES FOR DESIGN CONSTRUCTION OF HEALTH CARE FACILITIES BASIS OF DESIGN INDOOR AIR DESIGN CONDITIONS: 0 SUMMER: DB / RH - 75 °F 150 /o WINTER: DB / RH - 70 °F / 50% OUTDOOR AIR DESIGN CONDITIONS: COOLING @ 0.4% DB /MCWB - 91.8 °F / 77.6 °F 0 HEATING 99.6lo DB - 47.7-F BASED ON 2009 ASHRAE FUNDAMENTALS ASHRAE LOCATION: MIAMI INTL AP, FL. MECHANICAL GENERAL NOTES 1. THE DESIGN DRAWINGS OF ALL CATEGORIES AND TRADES (ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE PROTECTION, CIVIL, MECHANICAL, HEATING, VENTILATING AND AIR CONDITIONING AND ELECTRICAL) AND ALL SPECIFICATIONS AND SHOP DRAWINGS MUST BE EXAMINED AND BE VIEWED IN CONNECTION AND CONJUNCTION WITH EACH OTHERTO INSURE THE PROPER LOCATION OF ALL DEVICES AND EQUIPMENT. MAKE PARTICULAR NOTE OF LOCATIONS AND DIMENSIONS SHOWN ON THE ARCHITECTURAL FLOOR PLANS AND ELEVATIONS. 2. ROUTE EXHAUST AND OUTSIDE AIR DUCTWORK ABOVE ALL OTHER HVAC SYSTEM COMPONENTS WHERE POSSIBLE. VERIFY ALL CLEARANCES PRIOR TO COMMENCEMENT OF WORK. 3. THE MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL VOLUME DAMPERS ARE ACCESSIBLE. 4. ALL FLEXIBLE DUCTS IN ALL SMOKE COMPARTMENTS SHALL BE 'THERMAFIN" OR "METALFLEX" HOSPITAL GRADE TYPE WITH METALLIC LINERS. REFER TO DETAILS FOR MORE INFORMATION. 5. ALL INTERIOR AIR HANDLERS MUST BE INSTALLED BELOW THE INSULATION BARRIER AND WITHIN THE INSULATED ENVELOPE OF THE BUILDING. 6. SHUTTING DOWN OF RTU /AHU FOR MAINTENANCE WILL ALSO SHUT DOWN ALL ASSOCIATED EXHAUST FANS IN SAME SMOKE COMPARTMENT. REFER TO EXHAUST FAN SCHEDULE FOR MORE INFORMATION. 7. ALL AIR HANDLERS MUST RUN DURING HOURS IN WHICH EXHAUST AND OUTSIDE AIR UNITS RUN. THE MECHANICAL CONTRACTOR SHALL INSTALL ALL THERMOSTATS SUCH THATTHE'AUTO' SETTING CONTROLS THE ASSOCIATED MECHANICAL EQUIPMENT IDENTICALLY TO THE'ON' SETTING. 8. ROUTE CONDENSATE DRAIN FROM PATIENT ROOM AIR HANDLERS TO EXISTING CONDENSATE DISPOSAL PIPING SYSTEM. 9. GFI RECEPTACLES ARE TO BE PROVIDED BY DIVISION 16 TO SERVICE MECHANICAL EQUIPMENT ON ROOF AS DEFINED IN NFPA -70 (2002) PARAGRAPH 210.63. , w 10. PROVIDE FIRE/SMOKE DAMPERS AT EVERY PENETRATION OF A FIRE/SMOKE WALL OR CHASE. 11. PROVIDE FIRE DAMPERS AT EVERY PENETRATION OF A FIRE WALL AND FIRE RATED CEILING, 12. PROVIDE DIELECTRIC UNIONS AT ALL PIPING POINTS OF CONNECTION BETWEEN DISSIMILAR METALS. MECHANICAL LEGEND SD RG EG IC r71 r71 EXISTING CEILING DIFFUSER/GRILLE (LAY -IN) SD RG EG ® ® ® NEW CEILING DIFFUSER/GRILLE (LAY -IN) ® SUPPLY DIFFUSER BLANKING _ , _ I EXISTING RIGID DUCTWORK NEW RIGID DUCTWORK * NEW POINT OF CONNECTION TO EXISTING SUPPLY DUCTWORK TRANSITION UP OR DOWN RETURN DUCTWORK TRANSITION UP OR DOWN EXHAUST DUCTWORK TRANSITION UP OR DOWN DUCTWORK CROSSOVER OR CROSSUNDER AT THE MECHANICAL CONTRACTOR'S DISCRETION 90° ELBOW WITH TURNING VANES 45° ELBOW WITH TURNING VANES R SPIN -IN FITTING `Ft SPIN -IN FITTING WITH DAMPER FLEXIBLE DUO7, QNt�CTIOfN+.e � .. 4e .nt, I l � FLEXIBL DUC -C - EOT N� ' `�! - � 7r �i be 6 k 7# . EQ NO EQUIPMENTiAG x ___ I„ fi 4 N ; ° (} 3 _6 ) e NEW FIRE DAMPER � _f FIRE/SMOKE DAMPER I VOLUME DAMPER - CD - CONDENSATE PIPING - CHWS - CHILLED WATER SUPPLY PIPING - CHWR - CHILLED WATER RETURN PIPING --aa -- ISOLATION VALVE (BALL OR BUTTERFLY) -t 4- BACK CHECK VALVE --ti-- DIRECTION OF AIR FLOW -U-•- DOOR UNDERCUT (D TEMPERATURE SENSOR/ THERMOSTAT W x D RECTANGULAR DUCT WIDTH x DEPTH (INCHES) 0 ROUND DUCT DIAMETER (INCHES) / * '1 CONTROL WIRE B.F.F. BELOW FINISHED FLOOR A.F.F. ABOVE FINISHED FLOOR G.C. GENERAL CONTRACTOR P.C. PLUMBING CONTRACTOR M.C. MECHANICAL CONTRACTOR EQUIPMENT SUBMITTALS WHEN PROVIDING SUBMITTAL DATA ON EQUIPMENT, CLEARLY INDICATE MODEL NUMBER, SELECTION, ELECTRICAL DATA (VOLTS /PHASE/AMPS /ETC.), AND ALL ACCESSORIES. UNMARKED COPIED OF EQUIPMENT CUT SHEETS AND INCOMPLETE SUBMITTALS WILL BE RETURNED AND REQUIRE RESUBMISSION. SEE MECHANICAL SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. MINIMUM MAINTENANCE ACTIVITY & FREQUENCY REQUIRED FROM OWNER ITEM ACTIVITY MINIMUM FREQUENCY FILTERS AND AIR CLEANING MAINTAIN ACCORDING TO O &M MANUAL CHECK MONTHLY DEVICES ­ - OUTDOOR AIR DAMPERS AND VISUALLY INSPECT OR REMOTELY MONITOR FOR PROPER FUNCTION EVERY THREE MONTHS ACTUATORS Iiiiiiiiiiiiiiiii -*= DEHUMIDIFICATION COILS VISUALLY INSPECT FOR CLEANLINESS AND MICROBIAL GROWTH, AND EVERY SIX MONTHS o CLEAN WHEN FOULING IS OBSERVED d c DRAIN PANS AND OTHER ADJACENT VISUALLY INSPECT FOR CLEANLINESS AND MICROBIAL GROWTH, AND EVERY SIX MONTHS SURFACES SUBJECT TO WETTING CLEAN WHEN FOULING IS OBSERVED E OUTDOOR AIR INTAKE LOWERS VISUALLY INSPECT FOR CLEANLINESS AND INTEGRITY AND CLEAN WHEN EVERY SIX MONTHS BIRD SCREENS, MIST ELIMINATORS NECESSARY co AND ADJACENT AREAS C)o 'a SENSORS USED FOR DYNAMIC VERIFY ACCURACY AND RECALIBRATE OR REPLACE AS NECESSARY EVERY SIX MONTHS MINIMUM OUTDOOR AIR CONTROL > v Q AIR HANDLING SYSTEMS EXCEPT MEASURE MINIMUM QUANTITY OF OUTDOOR AIR. IF MEASURED MINIMUM ONCE EVERY FIVE YEARS FOR UNITS UNDER 2000 CFM (1000 AIRFLOW RATES ARE LESS THAN 90% OF THE MINIMUM OUTDOOR AIR US) RATE, THEY MUST BE ADJUSTED OR MODIFIED TO BRING THEM ABOVE a 90 %, OR MUST BE EVALUATED TO DETERMINE IF THE MEASURED RATES ARE IN CONFORMANCE WITH THIS STANDARD EQUIPMENT /COMPONENT KEEP THE SPACE PROVIDED AROUND THE VENTILATION EQUIPMENT FOR ACCESSIBILITY ROUTINE MAINTENANCE AND INSPECTION CLEAR VISIBLE MICROBIAL CONTAMINATION INVESTIGATE AND RECTIFY WATER INTRUSION OR I INVESTIGATE AND RECTIFY ACCUMULATION NEGATIVE PRESSURE IS DETECTED VERIFY PROPER OUTSIDE AIR AND EXHAUST AIRFLOW FAN CHECK FOR BELT ADJUSTMENTS AND GREASE BEARINGS EVERY THREE MONTHS AIR HANDLING SYSTEMS CHECK THE UNIT DRAIN PANS AND CONDENSATE PIPING TO ENSURE THAT CHECK MONTHLY THERE ARE NO BLOCKAGES INSPECT THE COOLING COILS FOR DIRT, BENT FINS, ETC. IF THE COILS CHECK MONTHLY APPEAR DIRTY, CLEAN THEM MANUALLY ROTATE THE CONDENSER FANS TO ENSURE FREE MOVEMENT EVERY SIX MONTHS AND CHECK MOTOR BEARINGS FOR WEAR. VERIFY THAT ALL OF THE FAN MOUNTING HARDWARE IS TIGHT INSPECT THE F /A -R/A DAMPER HINGES AND PINS TO ENSURE THAT ALL EVERY SIX MONTHS MOVING PARTS ARE SECURELY MOUNTED. KEEP THE BLADES CLEAN AS NECESSARY. VERIFY THAT ALL DAMPER LINKAGES MOVE FREELY; LUBRICATE WITH EVERY SIX MONTHS GREASE, IF NECESSARY CHECK THE FAN SHAFT BEARINGS FOR WEAR. REPLACE THE BEARINGS AS EVERY SIX MONTHS NECESSARY LUBRICATE THE SUPPLY FAN SHAFT BEARINGS EVERY SIX MONTHS CHECK THE SUPPLY FAN BELTS. IF THE BELTS ARE FRAYED OR WORN CHECK MONTHLY REPLACE THEM CHECK THE CONDITION OF THE GASKET AROUND THE CONTROL PANEL EVERY SIX MONTHS DOORS. THESE GASKETS MUST FIT CORRECTLY AND BE IN GOOD CONDITION TO PREVENT WATER LEAKAGE CLEAN COOLING COIL AND CONDENSER COIL EVERY YEAR STRAIGHTEN ANY BENT COIL FINS WITH A PIN COMB � - - I � , - ;k� _ -;;� r V IIIIIIIIIIIIIIIIIIIIIIIII AIIIIIIIIIIIIII IIIIIIIIIIIIIIIII l ­ - A_... = _ - _ 6 (o -°, M U Iiiiiiiiiiiiiiiii -*= 1 6) N E '4 O S I- 9 i, I 10 " L w n a a m .x _j 3 A.. W, ; 4� / p w � ttvo um ao / � Q n x .30if Iiiiiiiiiiiiiiiiiiiiiiiii / Q / 0. L., bL A D -ro _ U 0 00 IIIIIIIIIIIIII m IL I Ln I d' =co N N 450 No, It _j 1� I .• •,G ,S • "• F f e % . i 1. * • 51871 -ft • 5 r + '� ' T& OF .7. 'I op - LICENSE ": 51611 PRINTED NAME: DAVID S. BESS Nan F�z�_ r V �r IV i 4 s@ c Z m ° 0 L �r, � , i _ t _. k?;.:. e,, _l:_ .• •,G ,S • "• F f e % . i 1. * • 51871 -ft • 5 r + '� ' T& OF .7. 'I op - LICENSE ": 51611 PRINTED NAME: DAVID S. BESS 0 • rTmmq . VJ • "NMI �> 0 a) ,Qy •o Q P4 Cd a � r= 0 w u Q P4 >_� /o C/) •) � F P..� 4. f..w ,- �_-i W) • rmm1 '-� ct �=4 cn ^w I '!4 W H z � -<� W T � w " \.Jw Z o �5 \.% Wl 1--�1 o U a �o "a � z V I; 1 SL s@ c Z m ° 0 8 I 6 (o -°, M U il c P a) o it l d c CD w �^ $$ E b06 ;' a <ce N 4 Ui2 co C)o 'a ; °v' -0 > v Q -` m m ;z A wvi- i 2 9! . a 1 0 • rTmmq . VJ • "NMI �> 0 a) ,Qy •o Q P4 Cd a � r= 0 w u Q P4 >_� /o C/) •) � F P..� 4. f..w ,- �_-i W) • rmm1 '-� ct �=4 cn ^w I '!4 W H z � -<� W T � w " \.Jw Z o �5 \.% Wl 1--�1 o z z Z • rn � � 2 M 0 u o �- �^ W Ny b06 o° 4 N� <_Q� C)o M -0.1 F w