10-965-014FROOM NAME
ROOM# REL
AREA CH
ACH
OAACHACH
SUPPLY RETIN EXHAUST Transfer COMMENTS
SUPPLY RETtN EXHAUST Transfer COMMENTS
Area 2
PRES
CODE
CODE
DESIGN
850
3
90
Clerical • >.
2701 Q
16
!
!
9
!
2
1 !
w Screening Lobby
!
254
8 #
f
10
350
3
# `0 To New Toilet
;NewToiletRoom
IN
0
10
0
10
0
0
90 -90 From Lobby
9
6
2
10
475
410
0
75 From Patient Room
2 Bd Psych Patient Rm - HC - RR
ROOM MANE
ROOM# REL
AREA
CH
ACH
OAACHACH
SUPPLY RETtN EXHAUST Transfer COMMENTS
Area 2
PRES
UNITTYPE
CODE
CODE
DESIGN
2645
235
2701 Q
2 Bed Psych Patient Room
0
247
9
6
2
12
430
35
0
55 To Restroom
2 Bed Psych Patient Room - RR
IN
36
9
10
0
10
0
D
55
-55 From Patient Rm
2 Bed Psych Patient Room - HC
0
307
9
6
2
10
475
410
0
75 From Patient Room
2 Bd Psych Patient Rm - HC - RR
IN
47
9
10
0
11
0
0
75
-75 To Restroom
New Consultation Room 1
0
99
8
6
0
10
130
131
0
0
New Personal Property Storage
0
139
8
0
0
5
100
106
0
0
New Consultation Room 2
0
98
8
6
0
10
130
130
0
0
New Consultation Room 3
0
124
8
6
0
10
160
160
Q
0
New Seclusion Room 1
0
97
9
6
0
17
250
250
0
0
Star 1
0
14
_ 8
0
0
13
25 .
0
_0
25 To Anteroom
New Toilet
IN
43
9
10
0
10
0
0
65
-65 From Anteroom
Star 2
0
14
8
0
0
13
25
0
0
25 To Anteroom
AnteRoom
IWOUT
91
9
10
0
7
90
0
75
15 To Restroom
New Seclusion Room 2
0
89
9
6
0
25
335
335
Q
0
New Wed Prep Room
0
92
8
4
0
9
110
110
0
0
New Exam Treatment Room
0
134
8
6
0
22
385
385
0
0
MECHANICAL - FIFTH FLOOR PLAN1,4EW
I•
FAN COIL UNIT SCHEDULE
UNITTYPE
MANUFACTURER
r
� Iii
. +i
•: �,
SIGN SUPPLY AJR (CFM)
..�'
#1 11
ERNAL STATIC
II IIII`I�II�AIII +�
ECTRICAL SERVICE
#
o
i>
r •_
.91
ELECTRIC HEAT (KW) /(AMP DRAW)
MAXIMUM COIL AIRFLOW (CFM)
OTAL COOLING CAP, (MBH)
COOLING-CAP.
AIR TEMP. ff) (DBNVB)
ENTERING WATER TEMP.
���
LEAVING WATER TEMP. ff)
FLOW RATE
WATER PRESS, •.i.
ROWS/
#'
EFFICIENCY
1 , PROVIDE TRANE'S BASIC PIPING PACKAGE"B"TO INCLUDE 2-WAY VALVE, CIRCUIT
SETTER
•
PROVIDE PROGRAMMABLE THERMOSTATS #
CONTROLS SECTION
OF THE SPECIFICATIONS, SEE MECHANICAL CONTROLS SHEET AND CONTROLS SECTION OF
3, ELECTRICAL SHALL PROVIDE DISCONNECT SWITCHES AND GFI
CONVENIENCE OUTLET.
4. PROVIDE 11- (20%) FILTRATION. OUTSIDE AIR TO BE SUPPLIED
TO FCU THROUGH AN OUTSIDE
AIR UNIT,
5, FULL SIZE CONDENSATE DRAIN LINE CONNECTIONS,
PROVIDE DRAIN PAN AND FULL-SIZE CONDENSATE DRAIN
7. MECHANICAL CONTRACTOR MUST OBTAIN SUBMITTAL APPROVAL FROM
MECHANICAL ENGINEERS BEFORE ORDER
8, MOUNT HIGH ENOUGH TO DRAIN CONDENSATE PIPING AT 1/4"PER FOOT SLOPE TO CONNECT
INTO EXISTING CONDENSATE • DO
MECHANICAL - FIFTH FLOOR PLAN1,4EW
I•
i
BASIS OF i •
MATERIAL- STEEL, COLOR:
• r
BASIS OF i r
MATERIAL: STEEL, COLOR.-
#
a r
W
CFM
CFM VOID
►�i
T
r
� Iii
. +i
•: �,
#1 11
# #
II IIII`I�II�AIII +�
#
o
i>
.91
i
BASIS OF i •
MATERIAL- STEEL, COLOR:
• r
BASIS OF i r
MATERIAL: STEEL, COLOR.-
#
a r
W
CFM
CFM VOID
►�i
T
E.
•
i
s
AP
r
• *`
• "
s
a , c
I�
#1 11
<
i>
.91
E.
•
i
s
AP
r
• *`
• "
s
a , c
I�