10-965-011i
mol
l o
r
ELIAM01; F-All 01-1 W12WojI2LvqjlA 1
M2.0
ii• PLAN RENOVATION
17- CONTROL OF AIRBORNE CONTAMINANTS
• •
NEW CEILING DIFFUSER/GRILLE (LAY -IN)
®
THE GENERAL, MECHANICAL, AND ELECTRICAL CONTRACTORS AND ALL SUB-CONTRACTORS
EVERY SIX MONTHS
EXISTING RIGID DUCTWORK
NECESSARY
SHALL INSTRUCT ALL INDIVIDUALS PROVIDING CONSTRUCTION AND RELATED SERVICES IN
AND ADJACENT
NEW POINT OF CONNECTION TO EXISTING
MOVING PARTS ARE SECURELY MOUNTED, KEEP THE BLADES CLEAN AS
THE MEANS AND METHODS OF PREVENTING THE SPREAD OF CONTAMINANTS TO OCCUPIED
# # • ` r # •
r # r »#
�� *�� • • i� - ��� ` # a
SPACES. THE GENERAL, MECHANICAL, AND ELECTRICAL CONTRACTORS AND ALL
EXHAUST DUCTWORK TRANSITION UP OR DOWN
AIR HANDLING w..
DUCTWORK CROSSOVER OR CROSSUNDER AT
SUB-CONTRACTORS SHALL KEEP ALL WORK SPACES CLEAN TO PREVENT THE TRANSFER OF
# # _
AIRFLOW RATES ARE LESS THAN 90% OF THE MINIMUM OUTDOOR AIR
90r ELBOW WITH TURNING VANES
CONTAMINANTS, INCLUDING AIRBORNE CONTAMINANTS, FROM WORK SPACES TO THE
• 11 • # •# # 1 11
#
SPIN -IN FITTING
OCCUPIED SPACES PARTICULARLY PATIENT CARE AREAS, BUT
SPIN -IN FITTING WITH DAMPER
`
FLEXIBLE DUCT CONNECTION
NOT NECESSARILY BE LIMITED TO, PROVIDING BARRIERS AND/OR ENCLOSURES TO SEPARATE
FLEXIBLE DUCT CONNECTION
EO
NO
EQUIPMENT TAG
WORK SPACES FROM OCCUPIED SPACES, ENSURING THAT DOORS AND OTHER OPENINGS
NEW FIRE DAMPER
FIREISMOKE DAMPER.
BETWEEN WORK SPACES AND OCCUPIED SPACES ARE KEPT CLOSED, AND PROVIDING
VOLUME DAMPER
°-- CD
CONDENSATE PIPING
TEMPORARY BARRIERS AND/OR ENCLOSURES WHEN SHORT-TERM WORK IS REQUIRED IN
CHILLED WATER SUPPLY PIPING
C
CHILLED WATER RETURN PIPING
OCCUPIED SPACES.
ISOLATION VALVE (BALL OR BUTTERFLY)
BACK CHECK VALVE
DIRECTION OF AIR FLOW
--U
DOOR UNDERCUT
WHEN THE SCOPE OF WORK INCLUDES THE RENOVATION OF AN EXISTING SPACE OR WHEN, IN
TEMPERATURE SENSOR /THERMOSTAT
W x D
RECTANGULAR DUCT WIDTH x DEPTH (INCHES)
NEW CONSTRUCTION, THE EXTERIOR WALLS, ROOF, DOORS, AND GLAZING HAVE BEEN
ROUND DUCT DIAMETER (INCHES)
o' o
CONTROL WIRE
INSTALLED AND THE BUILDING ENVELOPE CAN BE CLOSED, THE (GENERALIMECHANICAL)
c = # # . .,.# # , #'.. ' r » "• . r x
Or- :, , # ".1 # _.: : ,... a , i ':. i• •
ABOVE FINISHED FLOOR
CONTRACTOR PROVIDE BARRIERS AND/OR :• . O SEPARATE 0. SPACES
GENERAL CONTRACTOR
P.C.
PLUMBING CONTRACTOR
FROM OCCUPIED SPACES AND ONE OR MORE EXHAUST FANS TO EXHAUSTAIR FROM THE
MECHANICAL CONTRACTOR
WORK SPACES, WORK SPACES SHALL BE MAINTAINED AT NEGATIVE PRESSURE WITH
RESPECT TO OCCUPIED SPACES AS REQUIRED BY AHCA. THE TOTAL EXHAUST AJRFLOW
SHALL PROVIDE A MINIMUM OF TWO (2) AIR CHANGES PER HOUR AND THE EXHAUST FAN(S)
.:.. ♦ : r + .. ,... ! :'� • # ': i, r #.
i t. #. i • # #
OF THE BUILDING • # THE DISCHARGE SHALL NOT BE LOCATED Ir : 1 1 1 #
INTAKE. THE MECHANICAL CONTRACTOR SHALL INSTALL FILTERS ON ALL DUCT OUTLETS AND
INLETS SERVING THE SCOPE OF WORK TO PREVENT ANY CONSTRUCTION DUST FROM
ENTERING THE DUCTWORK IF CONSTRUCTION DUST DOES ENTER THE DUCTWORK, THEN
THE MECHANICAL CONTRACTOR SHALL HAVE THE DUCTWORK CLEANED AT HIStHER EXPENSE,
THE (GENERAL/MECHANICALI CONTRACTOR SHALL PROVIDE ONE OR MORE PORTABLE AIR
CLEANERS AND ONE OR MORE VACUUM CLEANERS TO KEEP ALL WORK SPACES CLEAN,
WHEN AIR HANDLING SYSTEMS ARE TO BE MADE OPERATIONAL IN PHASES, THE MECHANICAL
CONTRACTOR SHALL MAKE PROVISIONS FOR MAINTAINING THE OPERATION OF EACH AIR
HANDLING SYSTEM AND PROVIDING THE REQUIRED AIR PRESSURE BALANCES IN THE
COMPLETED PHASES OF THE SCOPE OF WORK WHILE LATER PHASES OF THE SCOPE OF
WORK ARE UNDER CONSTRUCTION. THIS MAY INCLUDE, BUT NOT NECESSARILY BE LIMITED
TO, ADJUSTING AIRFLOWS, CLOSING DAMPERS, BLANKING-OFF DIFFUSERS AND GRILLES, AND
PROVIDING TEMPORARY BYPASS DUCTWORK
IMMEDIATELY • TO FINAL COMPLETION, r • REMOVE
ALLTEMPORARY DUCTWORKAND/OR PIPING AND THE TEST AND BALANCE CONTRACTOR
SHALL BALANCE ALL NEWAIR HANDLING SYSTEMS AND REBALANCEANY EXISTING AIR
• #
HANDLING SYSTEMS AFFECTED BY OF #` OF rr
,
'# : # • # !. , . , •; .:. "..Or #. ,
, r
! # r is : # ' #
, i ' #.` , r `: r :- #,': # •
,
# #
.. is � , # , :» # .# #• + # •: •
i ' /1 •,.
• e D
# # #
, O # , . a , ! # s # #i
• # r »; i # , , r ,y • + x #
, r .. •» + x # r . , , !» rR #. #
• r # • : r r • # # r
•
• r # # •
'
, », O= , � .# : 1. ».O» �. .. • #
s * # # :• # • , i , r #
# ' _ # r , OrD, , r # r #
•` r D r + D . # #. �,. ., • ! i •- ••
#` • •+ •
# i• • •era • , • , # , ,
++, it + ..# # # _ #. • a
# .Or .• a r �»
r i •` • ! !•• i #Ir
i
mol
MECHANICAL GENERAL # • ': •
LEGEN,
r
FLOOR » DEMOLITION
M2.0
ii• PLAN RENOVATION
1
MECHANICAL DETAILS
w
! 1 t
MECHANICAL LEGEND
SD RG EG
71 a
J �
IC y
EXISTING CEILING DIFFUSERIGRILLE (LAY -IN)
SD RG EG
_I I
SURFACES RU� #_ •_ _ _ ,
APPEAR DIRTY, CLEAN THEM
NEW CEILING DIFFUSER/GRILLE (LAY -IN)
®
SUPPLY DIFFUSER BLANKING
EVERY SIX MONTHS
EXISTING RIGID DUCTWORK
NECESSARY
NEW RIGID DUCTWORK
AND ADJACENT
NEW POINT OF CONNECTION TO EXISTING
MOVING PARTS ARE SECURELY MOUNTED, KEEP THE BLADES CLEAN AS
SUPPLY DUCTWORK TRANSITION UP OR DOWN
VERIFY ACCURACY AND RECALIBRATE OR REPLACE AS NECESSARY
RETURN DUCTWORK TRANSITION UP OR DOWN
�� *�� • • i� - ��� ` # a
1
EXHAUST DUCTWORK TRANSITION UP OR DOWN
AIR HANDLING w..
DUCTWORK CROSSOVER OR CROSSUNDER AT
ONCE EVERY YR..
THE MECHANICAL CONTRACTORS DISCRETION
AIRFLOW RATES ARE LESS THAN 90% OF THE MINIMUM OUTDOOR AIR
90r ELBOW WITH TURNING VANES
US)
45' ELBOW WITH TURNING VANES
SPIN -IN FITTING
90%, OR MUST BE EVALUATED TO DETERMINE
SPIN -IN FITTING WITH DAMPER
`
FLEXIBLE DUCT CONNECTION
FLEXIBLE DUCT CONNECTION
EO
NO
EQUIPMENT TAG
(N>
NEW FIRE DAMPER
FIREISMOKE DAMPER.
L--
VOLUME DAMPER
°-- CD
CONDENSATE PIPING
CHWS —
CHILLED WATER SUPPLY PIPING
C
CHILLED WATER RETURN PIPING
ISOLATION VALVE (BALL OR BUTTERFLY)
BACK CHECK VALVE
DIRECTION OF AIR FLOW
--U
DOOR UNDERCUT
UT
TEMPERATURE SENSOR /THERMOSTAT
W x D
RECTANGULAR DUCT WIDTH x DEPTH (INCHES)
0
ROUND DUCT DIAMETER (INCHES)
o' o
CONTROL WIRE
B.F.F.
BELOW FINISHED FLOOR
A.F.F.
ABOVE FINISHED FLOOR
G.C.
GENERAL CONTRACTOR
P.C.
PLUMBING CONTRACTOR
M.C.
MECHANICAL CONTRACTOR
FOULING SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS,
WATER INTRUSION OR INVESTIGATE AND RECTIFY
ACCUMULATION
NEGATIVE PRESSURE IS DETECTED VERIFY PROPER OUTSIDE AIR AND EXHAUST AIRFLOW
AIR HANDLING SYSTEMS
CLEAN WHEN OBSERVED
1 I I IT w I I III IIIMIIIIIII i II � 11 I III I
�II�I � � � I I M I � C ADJACENT
i.
INSPECT THE COOLING COILS FOR DIRT, BENT FINS, ETC, IF THE COILS CHECK MONTHLY
_I I
SURFACES RU� #_ •_ _ _ ,
APPEAR DIRTY, CLEAN THEM
OUTDOOR AIR INTAKE LOUVERS,
VISUALLY INSPECT FOR CLEANLINESS AND INTEGRITY, AND CLEAN WHE
EVERY SIX MONTHS
BIRD SCREENS, MIST ELIMINATORS
NECESSARY
INSPECT THE F /A -R/A DAMPER HINGES AND PINS TO ENSURE THAT ALL EVERY SIX MONTHS
AND ADJACENT
s
MOVING PARTS ARE SECURELY MOUNTED, KEEP THE BLADES CLEAN AS
.fa�I��I,.II n11 y■I�III plll
I � I�I� � III I�
VERIFY ACCURACY AND RECALIBRATE OR REPLACE AS NECESSARY
EVERY SIX MONTHS
�� *�� • • i� - ��� ` # a
1
GREASE, IF NECESSARY
AIR HANDLING w..
MEASURE ,. QUANTITY OF OUTDOOR , • IF MEASURED MINIMUM
ONCE EVERY YR..
FOR # 10 00
AIRFLOW RATES ARE LESS THAN 90% OF THE MINIMUM OUTDOOR AIR
US)
RATE, THEY MUST BE ADJUSTED OR MODIFIED TO BRING THEM ABOVE
90%, OR MUST BE EVALUATED TO DETERMINE
ARE IN CONFORMANCE WITH THIS STANDARD
EQUIPMENT/COMPONENT
., .. R
ACCESSIBILITY
WATER INTRUSION OR INVESTIGATE AND RECTIFY
ACCUMULATION
NEGATIVE PRESSURE IS DETECTED VERIFY PROPER OUTSIDE AIR AND EXHAUST AIRFLOW
AIR HANDLING SYSTEMS
CHECK THE UNIT DRAIN PANS AND CONDENSATE PIPING TO ENSURE THAT CHECK MONTHLY
THERE ARE NO BLOCKAGES
INSPECT THE COOLING COILS FOR DIRT, BENT FINS, ETC, IF THE COILS CHECK MONTHLY
APPEAR DIRTY, CLEAN THEM
MANUALLY ROTATE THE CONDENSER FANS TO ENSURE FREE MOVEMENT EVERY SIX MONTHS
+r
AND CHECK MOTOR BEARINGS FOR WEAR, VERIFY THATALL OF THE FAN
MOUNTING HARDWARE IS TIGHT
INSPECT THE F /A -R/A DAMPER HINGES AND PINS TO ENSURE THAT ALL EVERY SIX MONTHS
s
MOVING PARTS ARE SECURELY MOUNTED, KEEP THE BLADES CLEAN AS
rr •
NECESSARY.
VERIFY THAT ALL DAMPER LINKAGES MOVE FREELY; LUBRICATE WITH EVERY SIX MONTHS
1
GREASE, IF NECESSARY
O s
r
CHECK THE FAN SHAFT BEARINGS FOR WEAR. REPLACE THE BEARINGS AS EVERYSIXMONTHS
NECESSARY
�if71= i�#7•�I,�.��'f.r.�lll���� �'n*7:IT�`I _,.,,.. O
CHECK THE SUPPLY FAN BELTS. IF THE BELTS ARE FRAYED OR WORN CHECK MONTHLY
REPLACETHEM
CHECK THE CONDITION OF THE GASKETAROUND THE CONTROL PANEL EVERY SIX MONTHS
DOORS. THESE GASKETS MUST FIT CORRECTLY AND B OOD
CONDITION TO PREVENT WATER LEAKAGE
CLEAN COOLING AND C♦ r - COIL
r #
Ill
And
uj
+r
,i
i 1
I
i
RI
s
,
i
rr •
1
O s
r
r�
•
. r
Ill
And
uj
+r
,i
i 1
I
i
RI
s
,
i
rr •
1
O s
r
•
. r
Ill
And
uj
+r
,i
i 1
I
i
RI
a
,
i
rr •
Ill
And
uj
r
rr •
O s
r
. r
Ill
And