13-490-023• •per
r
CONC.
CMU WALL
(REFER TO PL-
CMU WALL
TIE COLUMN
(REFER TO P
SILL ELEVATION
CMU VERT,
REINF.
i
—MINIMUM BEARING 8" EACH END.
—EXTEND BARS 6" BEYOND FACE OF SUPPORT.
—SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS.
— CONTRACTOR MAY SUBSTITUTE C.I.P. LINTEL W/
PRECAST LINTEL. SHOP DRAWINGS MUST BE
SUBMITTED FOR PRECAST LINTELS.
LINTEL SCHEDULE
REINF. I m
N.T.S.
ROOF O fW
• R ��
r •
•
CMU WALL
(REFER TO PLAN)
AT
s
e`
Ag 0
a
a
04
3) #3 TIES
EQ. SPC.
2) #3
TIES 0 2"
Vra da s'
EA. FACE
ING
T.O.
T.O. BEAM
-,d.,(REFER TO PLAN]
CONC. COLUMN
(REFER TO PLAN)
' r
77ROOF NOT SHOWN
•: r 7
vmv Trn"
(REFER TO PLAN)
TIE BEAM
(REFER TO PLAN)
♦- so's
a
mommums
�• i
UPLIFT CONN.
TO
f ti
SHEATWIVG
• i � ri
U„ .
O.H. (REFER
TO PLAN) Q -a`
4
GABLE END (REFER e'd
TO 1/S4.1)
a
• ` ire•
e
'4
OPENING 'TIE BEAM TIE SPACING
AT
(D= TOTAL BEAM DEPTH)
r
18:51):523"
r
r
r
L— PLYWOOD
SHEATHING
PT WD 2x6 LEDGER
W/ J "O W.A. 0
16" EMBED, 4"
• ,
r
•r
.. e N N�
Ga W .4-V a�
W -MP. cm
aj
c o
C
e v ,n E w
C ° ' w
® r
W
t— a
Z'
S
t
cnnr nr trr nnveac Alnr
■
mmum
r r
U WALL
♦��```tC`3� � A N q '���i
e �
; 3 'PHRI IN®, R a ,�
p4o
".,, :'ANAL r,`_.�```
iii
e
r
^tr
N
V
t.
N
CD
-
E
cnnr nr trr nnveac Alnr
■
mmum
r r
U WALL
♦��```tC`3� � A N q '���i
e �
; 3 'PHRI IN®, R a ,�
p4o
".,, :'ANAL r,`_.�```
iii