12-707-014l
i
T
e
t
2
HVAC DESIGN REQUIRES
YES
NO
DUCT SMOKE DETECTOR
•
FIRE DAMPER(S)
•
SMOKE DAMPER(S)
•
FIRE RATED ENCLOSURE
•
FIRE RATED ROOF / FLOOR CEILING ASSEMBLY
•
FIRE STOPPING
•
SMOKE CONTROL
•
IMPORTANT NOTE
INSTALL BELIMO MODULATING ACTUATORS IN EACH EXISTING
VAV BOX FOR PROPER AIR MODULATION. CONTACT BUILDING
ENGINEER FOR DETAILS. PROVIDE NEW THERMOSTAT IN ALL
VAV BOXES.
KEY NOTES
O PROVIDE NEW THERMOSTAT.
O RELOCATE EXISTING VAV AS SHOWN.
O EXISTING ROOF PENETRATION FROM OLD EXHAUST.
O RF -1 (RECIRCULATION FAN) TO RUN AFTER HOURS WHEN
BUILDING AHU IS NOT IN OPERATION. SET THERMOSTAT TO
787.
5O OFFSET RATED WALL ABOVE CEILING TO PROPERLY INSTALL
THE FIRE DAMPER AS PER DETAIL ON SHEET M6.1.
ml
%rte
REESCO
ARCHITECTS
1750 PONCE DE LEON BLVD
CORAL GABLES, FL 33134
305.448.4288 305.4444986
AA0002678
SEAL
KAMM CONSULTING
1407 W. PEWPOK
DAD s p
ON W-MW FAX NQ 949'!201
0 Q a
z
D 8
co Lu
C) <
a F.
Ir
J W
W Qw
Z = 'a
04
ca cl) w
0 0
3:: -
a: 0
OL 0
a m� 0
REVISIONS
Q2 B.D.C. 08/14/12
PROJECT NUMBER
2012 -0423
DATE
07 -06 -12
SI-EEr
M2.1