12-32-014�12MZR
m
[fill IN A
m Pl 8 R-11
Z_ �
P-M
F1.1 I 'T' I IF2- "V 2nd FLOOR r,.I I ol_ . 115.
ACOUSTICAL CEILING- --- Lw
STANDARD 'T'
SEE FINISH
L1
HANGER WIRES
SCHEDULE.
SECURELY
ATTACHED TO
jM
STRUCTURE ABOVE
EXISTw* Eva, GYPS um
50ARD - BOTH SIDES
3 5/8' - 20 GA. STEEL I 6
3 5/6' - 20 CA
STUDS a 24' OC, WITH I p I
STEEL Rl.MER
FIRESTOPS 6 V-0' I
SECURELY
VERT. (5EYOND)
ANCHORED TO
vi
FLOOR SLAB-
BASE As PER ROOM
FINISH SCHEDULE.
FINISHED FLOOR
20 GA. STEEL
RIMER SECURELY
ANCHORED To STRUCTURE
AlBOVE.
Ear"01c
20 GA STEEL
RINKER SECURELY
ANCHORED TO FLOOR
SLA5.
FINISHED FLOOR
P-M
I I
�o
STANDARD 'T' HANGER ACOUSTICAL
WIRES SECURELY CEILING. SEE
ATTACHED TO FINISH SC-HEDULE-
STRUCTURE AeOVE
IsElirl M. 1=40,
A
gn�V�
ol mo m s
9 et v'vt -v - Q., -W., I #"114;-rl?%.,rw%T--l-r 1%., - C;,-V" I RUNNER SECURELY
STEEL RINKER PERT. (BEYOND) FLOOR SLAB. VERI� (BEYOND)
SECURELY ANCHORED ANCHORED TO
TO FLOOR SLAB. BASE AS PER ROOM BASE As PER ROOM FLOOR SLAB.
FINISH SCHEDULE, FINISHED FLOOR
FINISHED FLOOR FINISH S'SCHEDULE. FINISHED FLOOR
I' , I— , y1l]
16219�M lqllmal��
�M
� UK- ". IN
�m
vi
J
Z
•
U)
•
LLJ�
nw.
w
Z
z
<
a:
EL
co
W
cn
r �n
Ul
95
7
C-4
0