Loading...
11-220-002p O 55. GENERAL CONTRACTOR SHALL COORDINATE ALL INTERIOR PLUMBING LINES WITH EXTERIOR UTILITY LINES FOR PROPER FLOW of WASTE MATTER INTO SEPTIC /SEWER C- GENERAL NOTES (LAST UPDATE 022220iP11 23. DISCREPANCIES BETWEEN PORTIONS of THE coNTRACt DOCUMENTS ARE NOT AGGE551BLE PAIRKING REQUIREMENTS- - INTENDED_ THE CONTRACTOR 15 TO CLARIFY WITH THE ARCHITECT AND OWNER SYSTEM_ s ANY SUCH DISCREPANCIES PRIOR TO COMMENCING WORK. 1. POST A PERMANENT 11'X22' SIGN IN A CONSPICUOUS PLACE AT EACH ENTRANCE , 1_ GENERAL CONTRACTOR SHALL VISIT SITE PRIOR TO BID, IN ORDER TO VERIFY 56- GENERAL CONTRACTOR SHALL COMPLETED ALL EXTERIOR CONCRETE WALKWAYS WITH TO OFF PARKING FACILITIES_ THE FOLLOWING STATEMENT SHALL BE PRINTED IN "' A "• AND COORDINATE DRAWINGS WITH ACTUAL CONDITIONS OF THE PROJECT_ 24, ALL ELECTRICAL, MECHANICAL AND PLUMBING WORK SHALL CONFORM TO THE BROOM FINISH TEXTURE U.ON_ ONE INCH HIGH LETTERS. 'UNAUTHORIZED VEHICLES NOT DISPLAYING E INCH - I �. . SHALL ANY QUESTIONS ARISE FROM SAID VISIT, REQUEST FOR INFORMATION REQUIREMENTS OF LEGALLY CONSTITUTED AUTHORITIES HAVING JURISDICTION. 51- IT SHALL BE UNDERSTOOD THAT THE EXTERIOR FINISH(S) OF THE ENTIRE DISTINGUISHING PLACARDS OR LICENSE PLATES ISSUED FOR PHYSICALLY " a SHALL BE MADE IN WRITING TO ARCHITECT FOR RESPONSE PRIOR TO BID STRUCTURE /SHELL/BUILDING SHALL BE PAINTED WITH A MINIMUM OF TWO (2) COATS OF HANDICAPPED PERSONS MAY BE TOWED, VEHICLES MAY BE RECLAIMED BY -F SUBMITTAL_ 25_ ALL CONTRACTORS SHALL SUBMIT SHOP DRAWINGS FOR REVIEW TO PAINT CONSISTING OF A PRIMER AND TWO (2) FINISH COATS SUFFICIENT TO TELEPHONING (BUILDING OWNER'S NUMBER)'_ ARCHITECT /OWNER BEFORE FABRICATING OR INSTALLING. THE ARCHITECT CONSISTENTLY COVER ALL SURFACE AREAS. IF THERE ARE STILL ANY 2_ THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS AND /OR OWNER WILL REVIEW SHOP DRAWINGS AND SAMPLES FOR IMPERFECTIONS, 5LEM15HE5 OR BLOTCHES VISIBLE AN ADDITIONAL COAT SHALL BE 2, EACH PARKING SPACE RESERVED FOR A DISABLED SHALL BE IDENTIFIED BY A PRIOR TO ANY WORK AND SHALL BE RESPONSIBLE FOR SAME IN ADDITION TO CONFORMANCE WITH DESIGN CONCEPT OF THE PROJECT_ THE OWNER AND /OR APPLIED_ ANY AND ALL METAL SURFACES SHALL BE ELECTRO STATICALLY PAINTED PERMANENTLY AFFIXED REFLECTORIZED SIGN CONSTRUCTED OF PORCELAIN ON m ALL WORK AND MATERIALS INCLUDING THOSE FURNISHED BY SUBCONTRACTORS_ ARCHITECT'S APPROVAL OF A SEPARATE ITEM SHALL NOT INDICATE BY THEIR MANUFACTURERS. ALL COLORS SHALL BE SELECTED BY ARCHITECT /OWNS STEEL, WITH BEADED TEXT, OR EQUAL, DISPLAYING INTERNATIONAL SYMBOL C CONTRACTOR SHALL ACCEPT PREMISES AS FOUND_ OWNER ASSUMES NO APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS. ALL AND SUBMITTALS SHALL BE PROVIDED FOR REVIEW_ TEST PATCHES ARE TO BE of ACCESSIBILITY_ THE SIGN SHALL NOT BE SMALLER THAN 10 SQ IN_ AREA R � RESPONSIBILITY FOR THE CONDITION OF THE EXISTING SITE AT THE TIME OF MANUFACTURERS AND /OR SUPPLIERS SHALL SUBMIT SHOP DRAWINGS TO THE ARCHITECT /OWNER FOR REVIEW PRIOR TO FABRICATION. IF CONTRACTORS APPLIED ON WALL SURFACES At THE FRONT ELEVATIONS AND /OR ANY OTHER FACADE THAT 15 APPLICABLE AND SHALL BE CENTERED EITHER ON A POST OF 80 INCHES FROM THE BOTTOM 0 Q z BIDDING OR THEREAFTER AUTHORIZE FABRICATION OF ANY TO SHOP TO DESIGN FEATURES FOR REVIEW PRIOR TO PAINTING OF THE SIGN TO THE FINISH PARKING SURFACE_ PROVIDE AT PARKING STALL j Ll PRODUCTS PRIOR DRAWING OF ENTIRE FACILITY. A V -0' FOOT SQUARE INTERNATIONAL SYMBOL OF ACCESSIBILITY STENCILED IN 4i 3, GENERAL CONTRACTOR SHALL PROVIDE HIS SUBCONTRACTORS WITH FULL APPROVALS. SAME CONTRACTORS SHALL BE RESPONSIBLE FOR ALL COST 58- ALL CONDUITS ADJACENT TO EXPOSED CMU, SUCH AS THOSE AT AND BELOW ELECT_ BLUE ON THE PARKING SURFACE. X SETS OF CONSTRUCTION DOCUMENTS AND PROJECT MANUALS FOR BIDDING_ RELATED TO ANY DEVIATIONS OR ERRORS FROM THE DESIGN INTENT. PANELS, ARE TO BE FURRED OUT W/ METAL FURRING STRIPS AND 5/8' TYPE 'X' w GENERAL CONTRACTOR SHALL PROVIDE HIS SUBCONTRACTORS WITH FULL SETS OF GYPSUM BOARD 3. THE MINIMUM LENGTH OF EACH PARKING SPACE SHALL BE 18' -0' FEET. -' Q CONSTRUCTION DOCUMENTS AND PROJECT MANUALS AS APPROVED BY 26_ MINIMUM FLAME SPREAD CLASSIFICATION OF INTERIOR FINISH SHALL CONFORM UPDATED 02.2210 AUTHORITIES HAVING JURISDICTION FOR CONSTRUCTION PURPOSES. TO THE BUILDING CODE AND LOCAL GOVERNING BUILDING 4_ SURFACE SLOPES OF PARKING SPACES FOR THE PHYSICALLY DISABLED SHALL CODES/ORDINANCE-5, NOT EXCEED 1/4' PER FOOT (2.083% GRADIENT) IN ANY DIRECTION. p 4. COORDINATION OF THE WORK SHALL BE WITH ALL THE PLANS AND � SPECIFICATIONS_ EACH CONTRACTOR SHALL REVIEW ALL THE PLANS AND SPECIFICATIONS AVAILABLE BEFORE COMMENCING WORK, SO AS TO FAMILIARIZE 21_ GYPSUM WALLBOARD AND SUSPENDED CEILING SYSTEMS SHALL CONFORM TO THE BUILDING CODE AND LOCAL GOVERNING CODES /ORDINANCES. SAFETY / EGRESS DOOR NOTE5: 5- A DISABLED PARKING SPACE SHALL BE LOCATED 50 AS NOT TO REQUIRE ITS U USER TO WHEEL OR WALK BEHIND ANY OTHER DISABLED OR NON - DISABLED u- HIMSELF WITH THE WORK OF OTHER CONTRACTORS BESIDES HIMSELF_ ANY 28, ALL GLASS AND GLAZING SHALL COMPLY WITH CHAPTER 54 OF PARKING SPACE. �u DISCREPANCIES OBSERVED SHALL BE REPORTED IN WRITING TO THE ARCHITECT THE U.5, IMMEDIATELY_ CONSUMER PRODUCT SAFETY COMMISSION SAFETY STANDARDS FOR ARCHITECTURAL GLAZING MATERIALS (42 FR 1428 016 CFR PART 1201), I_ NO DOOR IN THE PATH OF TRAVEL OF MEANS OF ESCAPE SHALL BE LESS THAN 32 WIDE, UNLESS A LARGER DOOR OPENING 15 REQUIRED TO SATISFY THE E,_ PEDESTRIAN WAYS WHICH ARE ACCESSIBLE TO THE PHYSICALLY DISABLED O 5. EACH CONTRACTOR SHALL COORDINATE HIS/HER WORK WITH ALL OTHER REQUIREMENTS OF 2001 FZ_C, SHALL BE PROVIDED FROM EACH DISABLED PARKING SPACE TO RELATED FACILITIES, INCLUDING CURB CUTS OR RAMPS AS NEEDED_ CONTRACTORS_ STARTING WORK BY ANY CONTRACTOR SHALL BE CONSTRUED AS 29_ GENERAL CONTRACTOR SHALL PROVIDE AND MAINTAIN FIRE EXTINGUISHER AS #- ACCEPTANCE OF ALL PRIOR WORK DONE BY OTHERS BEFORE AS CORRECT. APPROVED BY THE FIRE MARSHALL AT THE SITE DURING CONSTRUCTION. 2_ EVERY CLOSET DOOR LATCH SHALL BE SUCH THAT CHILDREN CAN OPEN THE DOOR FROM THE INSIDE OF THE CLOSET_ 1_ IN ADDITION TO THE ABOVE SIGNAGE REQUIREMENTS, THE SURFACE OF EACH li 9 > EACH CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS AT JOB SITE PARKING SPACE SHALL HAVE A SURFACE IDENTIFICATION DUPLICATING THE BEFORE STARTING WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IN WRITING BEFORE PROCEEDING WITH THE WORK.. 30, PROVIDE FIRE EXTINGUISHERS IN AREAS AS REQUIRED BY FIRE MARSHALL IN THE FIELD TO COMPLY WITH NFPA 10. EXTINGUISHERS ARE TO BE MOUNTED AT 3. EVER'" BATHROOM DOOR LOCK SHALL BE DESIGNED TO PERMIT THE OPENING SYMBOL OF ACCESS151LITY CONSISTING OF A WHITE FIGURE ON A BLUE a! ul 48' A FP_ TO TOP OF FIRE EXTINGUISHER. (RECESSED MOUNTED UNLESS NOTED OF THE LOCKED DOOR FROM THE OUTSIDE IN AN EMERGENCY_ BACKGROUND, AT LEAST V -0' SQUARE FEET_ 6. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS± DO NOT SCALE DRAWINGS 4. U TO DETERMINE ANY LOCATIONS_ THE ARCHITECT SHALL BE NOTIFIED IF ANY DOORS MAY BE SWINGING OR SLIDING, AND ARE EXEMPT FROM THE DISCREPANCY OCCURS PRIOR TO CONTINUING WITH WORK. 31, RIGID ELECTRICAL METALLIC TUBING (EMT) /OR PVC CONDUIT 15 REQUIRED AT REQUIREMENTS OF SECTION 21 -243 AND 21 -2.44 OF THE 2001 ED, OF NFPA OI a 1. ALL ARE FROM FACE ALL CONDUIT IN SLABS, WALLS AND CEILING SPACES____.__ 5, NO DOOR IN ANY MEANS SHALL BE LOCKED AGAINST EGRE55 WHEN THE �� ..�__.�____`�__--------- _ —_ - -- Ln PLAN DIMENSIONS CENTERLINES OR OF STUD UNLESS OTHERWISE INDICATED_ 32_ UNLESS SPECIALLY DETAILED PIPES AND DUCTS EXCEEDING ONE THIRD THE BUILDING 15 OCCUPIED. ALL LOCKING DEVICES WHICH IMPEDE OR PROHIBIT z 119 o SLAB OR WALL THICKNESS SHALL NOT BE PLACED IN STRUCTURAL CONCRETE EGRESS OR WHICH CANNOT BE EASILY ENGAGED SHALL BE PROHIBITED_ ACCESSIBLE WALK AND SIDEWALK REQUIREMENTS; O � 8_ IT SHALL BE UNDERSTOOD THAT ALL WORK PERFORMED SHALL BE DONE BY A LICENSED GENERAL CONTRACTOR AND IN A FIRST -CLASS WORKMANLIKE 33, HOT WATER TEMPERATURE AT SINKS IS TO BE ADJUSTED SO AS NOT TO MANNER ALL CONSTRUCTION SHALL COMPLY WITH THE APPLICABLE NATIONAL, EXCEED 120 DEGREES FAHRENHEIT_ AB}3REVIATIONS: 1, WALKS AND SIDEWALKS SUBJECT TO THESE REGULATIONS SHALL HAVE A O R'I v STATE 4 LOCAL BUILDING CODES AND LOCAL RESTRICTIONS_ THE MOST CONTINUOUS COMMON SUR =AGE, NOT INTERRUPTED BY STEPS OR BY ABRUPT STRINGENT CODE SHALL GOVERN THE CONTRACTOR MUST COMPLY WITH THE 34- PROVIDE RODENT PROOF WEATHER- STRIPPING AT THE BOTTOM OF ALL CHANGES IN LEVEL EXCEEDING 1/2 INCH AND SHALL BE A MINIMUM OF 46 INCHES �n CONTRACTOR REGISTRATION REQUIREMENTS OF ALL GOVERNING AUTHORITIES. EXTERIOR DOORS. AB ANCHOR BOLTS MA1NT MAINTENANCE IN WIDTH_ T 9. IT SHALL NOT BE THE INTENT OF THESE PLANS AND /OR SPECIFICATIONS TO 35_ PROVIDE MOP RACK AT JANITORS CLOSET_ ABBREV ABBREVIATION (S) MAT'L MATERIAL APPR APPROVED MAX MAXIMUM 2- SURFACE WITH A SLOPE OF 6 PERCENT GRADIENT SHALL BE AT LEAST AS SHOW EVERY MINOR DETAIL OF CONSTRICTION. THE GENERAL CONTRACTOR AGOUS ACOUSTICAL MB MACHINE BOLT SLIP- RESISTANT AS THAT DESCRIBED AS A MEDIUM SALTED FINISH - SHALL PROVIDE ALL LABOR, MATERIALS AND SUPERVISION NECESSARY TO ACCOMPLISH THE WORK AS SHOWN AND /OR NOTED ON THE NO 36, SURFACE MOUNTED SOAP E PAPER TOWEL DISPENSERS WILL BE PROVIDED AT ALL REST ROOMS, 4 KITCHEN. VERIFY EXACT LOCATION WITH OWNER IF NOT AC ASPHALT CONCRETE MECH MECHANICAL 3, SURFACES WITH A SLOPE OF 6 PERCENT GRADIENT OR GREATER SHALL BE IA a DRAWINGS_ AC or A/C AIR CONDITIONING MET METAL W CHANGE ORDER SHALL BE ALLOWED OR ISSUED TO CONTRACTOR, FOR SPECIFICALLY LOCATED HEREIN AD ACCESS DOOR MEZZ MEZZANINE SLIP- RE515TANT_ > L.� CONTRACTOR'S NEGLIGENCE, IN POINTING OUT ANY ERRORS, OMISSIONS, OR 31_ THE WRITTEN SCALES SUCH AS 1/4' APPLY ONLY TO UNREDUCED R AFF ABOVE FINISHED FLOOR MFR MANUFACTURER 4. WHEN THE SLOPE IN THE OF TRAVEL OF ANY WALK 1 ut O O Q `) DISCREPANCIES IN DRAWINGS, PRIOR TO 51D DATE AND /OR AWARDING OF =1' -0' DRAWINGS_ ALUM ALUMINUM M MISCELLANEOUS DIRECTION EXCEEDS VERTICAL TO 20 HORIZONTAL (5qo IT SHALL WITH THE CONTRACT. THE CONTRACTOR SHALL REPORT IN WRITING TO THE ARCHITECT MO MASONRY OPENING GRADIENT), COMPLY PREVISIONS FOR PEDESTRIAN RAMPS_ O N Q ANY ERRORS, INCONSISTENCIES, OR OMISSIONS HE MAY DISCOVER THE BD or BRD BOARD MIN MINIMUM 0 � CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ERRORS AFTER THE START 38_ DETAILED DRAWINGS AND LARGER SCALE DRAWINGS TAKE PRECEDENCE BLDG BUILDING MIR MIRROR '' ■■ Q OF CONSTRUCTION WHICH HAS NOT BEEN BROUGHT TO THE ATTENTION OF THE OVER SMALL SCALE DRAWINGS. BLK BLOCK MULL MULLION 5_ SURFACES ACROSS 5LOPE5 SHALL NOT EXCEED i : 50 SLOPE_ � T L�. ARCHITECT- THE MEANS OF CORRECTING ANY ERROR SHALL FIRST BE APPROVED 39, FOR CONSTRUCTION NOT SHOWN, USE THE MANUFACTURER'S SM BEAM I BY THE ARCHITECT AND OWNER THE RESPONSIBILITY FOR ANY CHANGES MADE DETAILS BOB BOTTOM of BEAM NO NEW NUMBER 6. WALKS, SIDEWALKS, AND PEDESTRIAN WAYS SHALL BE FREE OF GRATINGS L_ p ON THE FIELD WITHOUT PRIOR NOTIFICATION TO THE ARCHITECT SHALL REST WITH STANDARD DETAILS OR APPROVED SHOP DRAWINGS / DATA SHEETS IN BOT BOTTOM NTS NOT TO SCALE WHENEVER POSSIBLE. FOR GRATINGS LOCATED IN THE SURFACE OF ANY OF j— ❑ ❑ ig THE CONTRACTOR OR ANY OTHER PERSON APPROVING SUCH A CHANGE_ ACCORDANCE WITH THE PROJECT SPECIFICATIONS_ NR NON -RATED THESE AREAS, GRID OPENINGS IN GRATINGS SHALL BE LIMITED TO 1/2 INCH IN THE ❑ Q _ 10. THE GENERAL BUILDING PERMITS SHALL BE PAID FOR BY THE OWNER ALL 40- CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL G/C CENTER TO CENTER DIRECTION OF TRAFFIC FLOW. � ❑ Z 0 CHARGE AND SHALL INCLUDE REPLACEMENTS OR REPAIR OF ANY OTHER CER CERAMIC OG ON CENTER 1. ABRUPT CHANGES IN LEVEL ALONG ANY ACCESSIBLE SHALL NOT EXCEED Q OTHER PERMITS AND ANY INSPECTION FEES SHALL BE SECURED AND PAID FOR BY ALL REQUIRED CITY, COUNTY PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY_ CH CEILING HEIGHT OCG OPPERATOR CONTROL ROUTE 1/2 INCH. WHEN CHANGES IN LEVEL Do OCCUR, THEY SHALL BE BEVELED WITH A In THE SUBCONTRACTOR DIRECTLY RESPONSIBLE_ GEM CEMENT CENTER SLOPE NO GREATER THAT 1:2 EXCEPT' THAT LEVEL CHANGES NOT EXCEEDING � W AND/OR STATE LICENSES SHALL BE ACQUIRED AND PAID FOR BY THE CLG or CELL CEILING OD OUTSIDE DIAMETER 4 Y INDIVIDUAL SUBCONTRACTOR 41, ARCHITECTURAL AND /OR ENGINEERING EXPENSES THAT ARE INCURRED DUE TO REVISIONS AND /OR SUBSTITUTIONS REQUESTED BY THE CONTRACTOR SHALL CLO CLOSET OF OVERFLOW 1/4 INCH MAY BE VERTICAL_ I CLR CLEAR OFF OFFICE 2 11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL BE PAID FOR BY THE CONTRACTOR CMU CONCRETE MASONRY UNIT OFI OWNER FURNISH ITEM 8. WHEN CHANGES IN LEVEL GREATER THAN 1/2' INCH ARE NECESSARY, THEY SHALL EXISTING UTILITIES AND CONNECTING POINTS WHETHER SHOWN HEREIN OR NOT COL c.OLUMN OFOi OWNER FURNISHED OWNER COMPLY WITH THE REQUIREMENTS FO;-, CURB RAMP. `� nc FOR COORDINATION AND PROTECTION FROM DAMAGE_ PRIOR TO STARTING 42_ ARCHITECTURAL AND /OR ENGINEERING EXPENSES THAT ARE INCURRED DUE TO COMPO COMPOSITION INSTALLED CONSTRUCTION AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT /OWNER IN WRITING � REVISIONS AND OR SUBSTITUTIONS REQUESTED BY THE OWNER SHALL BE PAID CONC CONCRETE OH OPPOSITE HAND 9. WALKS SHALL BE PROVIDED WITH A LEVEL AREA NOT LESS THAN 60 INCHES 60 Z o OF ANY DISCREPANCIES FOUND. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF FOR BY THE OWNER CONN CONNECTION OPN'G OPENING INCHES AT A DOOR OR GATE THAT SWINGS TOWARDS THE WALK, AND NOT LESS REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY CONT CONTINUOUS OPP OPPOSITE THAN 48 INCHES WIDE BY 44 INCHES DEEP At A DOOR OR GATE THAT SWINGS z W OPERATIONS IN CONJUNCTION WITH THE PROSECUTION OF THE WORK. 43, ALL SIGNAGE SHOWN ON CONTRACT DOCUMENTS SHALL BE FOR COORDINATION CORR CORRIDOR AWAY FROM THE WALK. SUCH WALKS SHALL EXTEND, 24 INCHES TO THE SIDE OF O PURPOSES ONLY AND UNDER A SEPARATE PERMIT_ SIGN COMPANY SHALL BE CSK COUNTERSINK PC PORTLAND CEMENT THE STRIKE EDGE OF A DOOR OR GATE THAT SWINGS TOWARDS THE WALK. 12_ GENERAL CONTRACTOR SHALL ADHERE TO OWNERS REQUIREMENTS RESPONSIBLE FOR IDENTIFYING MAX. Sa FT_ OF SIGNS ALLOWED AND NUMBER PL PLATE PERTAINING TO TRASH REMOVAL, CLEANUP, DELIVERY OF MATERIALS, PARKING OF SIGNS, DEL DELETE PLAS PLASTER AND ANY OTHER REQUIREMENTS PERTAINING TO THE USE OF THE OWNERS DET DETAIL PLYWD PLYWOOD PREMISES_ THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE 44_ RELEASE OF LIENS- THE FINAL PAYMENTS SHALL NOT BE DUE UNTIL THE DF DOUGLAS FIR PR PAIR SECURITY OF THE SITE WHILE JOB IS IN PRoGRE55 AND UNTIL Job IS COMPLETED_ CONTRACTOR HAS DELIVERED TO THE OWNER A COMPLETE RELEASE OF LIENS DF DRINKING FOUNTAIN PREP PREPARATION ACCESSIBLE RAMP REQUIREMENTS- U_ ARISING OUT OF TH15 CONTRACT OR RECEIPTS IN FULL COVERING ALL LABOR pl,A DIAMETER PROD PROJECTION a U7 6 13, THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL KEEP ALL AREAS AND MATERIALS FOR WHICH A LIEN COULD BE FILED OR A BOND DIAG DIAGONAL PT PRESSURE TREATED � IN WHICH WORK 15 BEING PERFORMED, FREE FROM DEBRIS AT ALL TIMES AND SAID AREAS SHALL BE LEFT BROOM CLEAN AT THE END OF EACH WORKING SATISFACTORY t0 THE OWNER INDEMNIFYING HIM AGAINST ANY LIENS_ DIM DIMENSION DIR DIRECTION QT QUARRY TILE 1. ANY PATH OF TRAVEL SHALL BE CONSIDERED A RAMP IF ITS SLOPE ITS GREATER THAN 1 FOOT RISE IN 20 FEEL OF HORIZONTAL RUN O ° V J DAY_ 45_ ALL ROOF CUTS FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK SHALL DBL DOUBLE W z BE REPAIRED AND CONFORM IN EVERY RESPECT TO FINISH AND QUALITY DN DOWN R RISER 2_ THE MAXIMUM SLOPE OF A RAMP THAT SERVES ANY EXIT WAY PROVIDES a 14_ CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE AND WORKERS AT ALL TIMES_ OF MATERIAL AND WORKMANSHIP AS IT'S ORIGINAL STATE_ -GEN CONTRACTOR FOR ANY OF THE WORK ON THE ROOF IN ORDER TO MAINTAIN ANY AND ALL DO DOOR OPENING R or RAO RADIUS HANDICAP ACCESS OR IS IN THE PATH OF TRAVEL SHALL BE 1 FOOT RISE IN 12 O SAFETY OF THE OCCUPANTS WARRANTIES SHALL CONTRACT W/ CURRENT ROOFING COMPANY RESPONSIBLE DR DOOR RD ROOF DRAIN FEET OF HORIZONTAL RUN -�, 15_ CONTRACTOR SHALL PROVIDE TEMPORARY WATER, POWER, TOILET FACILITIES FOR WARRANTY PERIOD IN EFFECT_ FAILURE TO DO 50 SHALL MEAN THAT SAME DS DOWNSPOUT REF REFERENCE DWG or DRWG DRAWING REFL REFLECTED 3. pOOR5 IN ANY POSITION SHALL NOT REDUCE THE MINIMUM DIMENSION OF THE AS REQUIRED_ THE OWNER WILL NOT BE RESPONSIBLE FOR ANY TEMPORARY WORK WILL BE REPAIRED BY OWNER THROUGH ORIGINAL ROOFING CONTRACTOR AND COST ASSOCIATED WITH SAME REPAIR SHALL DE CHARGED REiNF REINFORCED RAMP LANDING TO LESS THAN 42 INCHES AND SHALL NOT REDUCE THE X to (-0 FACILITIES OR ARRANGEMENTS_ TO G.C. COORDINATE W/ OWNER AND /OR OWNER'S REPRESENTATIVE_ EA EACH REQ'D REQUIRED ELEG ELECTRICAL RM RESILIENT REQUIRED WIDTH BY MORE THAN 3 -1/2 INCH WHEN FULLY OPENED. Z O 16, CITY APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY WORKMEN ALL CONSTRUCTION SETS SHALL REFLECT SAME 46_ ALL POSSIBLE WALL PENETRATIONS IN FIRE RESISTIVE WALLS SHALL BE ELEV or EL ELEVATION RM ROOM ELEV ELEVATOR RO ROUGH OPENING 4_ INTERMEDIATE LANDINGS AT A CHANGE OF DIRECTION IN EXCESS OF 30 INFORMATION THE CONTRACTOR SHALL ALSO MAINTAIN, IN GOOD CONDITION, SEALED WITH FIRE STOP SYSTEMS AS APPROVED BY THE GOVERNING E EQUAL REDW'D REDWOOD DEGREES AND BOTTOM LANDINGS SHALL HAVE A DIMENSION IN THE DIRECTION OF RAMP RUN OF NOT LESS THAN 12 INCHES_ o ONE COMPLETE SET OF PLANS WITH ALL REVISIONS, ADDENDA, DELETIONS AND AUTHORITIES_ FIRE STOP SYSTEMS SHALL HAVE 'F' AND 'T' RATINGS EQUAL TO EQUIP EQUIPMENT � '���ill � W CHANGE ORDERS, IN RED PENCIL ON THE PREMISES AT ALL TIMES. THESE ARE TO THE BARRIER THAT THEY ARE PENETRATING, BUT NOT LESS THAN ONE HOUR EXIST or (X) EXISTING SECT SECTION 5_ OTHER INTERMEDIATE LANDINGS SHALL HAVE A DIMENSION IN THE DIRECTION OF Z N 0 BE KEPT UNDER THE CARE OF THE JOB SUPERINTENDENT 4 BE POSTED ON A 41, FIRE WALLS, FIRE PARTITIONS, SMOKE BARRIERS OR ANY OTHER WALL EJ EXPANSION JOINT SHT SHEET RAMP RUN OF NOT LESS THAN 60 INCHES_ Z �d g DAILY BASIS_ EXT EXTERIOR Sim SIMILAR Q REQUIRED TO HAVE PROTECTED OPENINGS SHALL BE EFFECTIVELY AND EWG ELEC WATER COOLER Sim SIMULATOR 6_ THE CROSS SLOPE ON A RAMP OR THE SLOPE ACROSS A RAMP LANDING IN -1 < 11. GENERAL CONTRACTOR IS RESPONSIBLE FOR RECEIVING, UNLOADING, PERMANENTLY IDENTIFIED WITH SIGNS OR STENCILING IN A MANNER SIMUL SIMULATED ANY DIRECTION SHALL NOT EXCEED 1/4 INCH RISE IN ONE FOOT OF HORIZONTAL a cn UNGRATING, INSTALLATION AND HOOKUP OF ALL FOOD SERVICE EQUIPMENT AND ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION SUCH IDENTIFICATION FHG FIRE HOSE CABINET SPECS SPECIFICATIONS RUN. � OTHER OWNER FURNISHED ITEMS, EXCEPT FURNITURE_ WHERE APPLICABLE SHALL BE ABOVE ANY DECORATIVE CEILING AND IN CONCEALED SPACES_ SUGGESTED WORDING: 'FIRE AND SMOKE ALL FIN FINISH SS STAINLESS STEEL 18_ THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL BARRIER- PROTECT OPENINGS' FLR FLOOR STA STATION Fo FINISHED OPENING STD STANDARD 1. HANDRAILS ARE REQUIRED ON RAMPS THAT PROVIDE HANDICAP ACCESS IF THE N R EPLACE OR REMEDY ANY FAULTY, IMPROPER OR INFERIOR MATERIALS OR 48_ OWNER SHALL PROPERLY MAINTAIN ALL WORK AS CONTAINED WITHIN THESE FOG FACE OF CONCRETE STL STEEL SLOPE EXCEEDS ONE FOOT RISE IN FIFTEEN FEET OF HORIZONTAL RUN < U zE WORKMANSHIP WHICH SHALL APPEAR WITHIN ONE (1) YEAR OR AS OTHERWISE CONSTRUCTION DOCUMENTS, INCLUDING BUT NOT LIMITED, TO ASSURE A NORMAL FOS FACE OF STUD SQ SQUARE 8_ HANDRAILS SHALL BE PLACED ON EACH SIDE OF EACH RAMP± SHALL BE W W o SPECIFIED FOR A SPECIFIC COMPONENT AFTER THE COMPLETION AND STANDARD OF USE 4 LIFE EXPECTANCY FOR THE BUILDING. PERIODIC ROOF, STUCCO, PENETRATIONS, AND WINDOW INSPECTIONS SHALL BE CONDUCTED FOR FOW FACE OF WALL STOR STORAGE CONTINUOUS THE FULL LENGTH OF THE RAMP± SHALL BE THIRTY INCHES TO W � ACCEPTANCE OF THE WORK UNDER THIS CONTRACT. PROVIDE GAF BUILDING MATERIALS CORPORATION LIBERTY TWENTY GUARANTEE. REPAIR AND / OR REPLACEMENT AS DEEMED NECESSARY_ FOUND FOUNDATION STRUCT STRUCTURAL FRP F1BER REINFORCED PLASTIC SUSP SUSPENDED THIRTY FOUR INCHES ABOVE THE RAMP SURFACE ±';SHALL EXCEED A MINIMUM OF w = = o U ONE FOOT BEYOND THE TOP AND BOTTOM OF THE( RAMP ABD THE ENDS SHALL W 19. CONTRACTOR SHALL REFER AND CONFORM TO ALL RECOMMENDATIONS AND 49_ BUILDING/ STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH 2001 FBG. Fp FLOOR DRAIN SYM SYMMETRICAL F5 FLOOR SINK BE RETURNED. ° m Q o ', Cli FINDINGS AS SET FORTH IN SOILS GEOLOGICAL REPORT_ THE OWNER AND /OR 146 MPH PRESSURES GENERATED BY THE WIND VELOCITY PER SECTION 1606, FS FULL SIZE T TREAD 9. HANDRAILS PROJECTIONS FROM A WALL SHALL HAVE A SPACE OF NOT LESS w m "I {- ARCHITECT ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF THE FINDINGS OR FOR THE FINAL RECOMMENDATIONS. GRADING, TRENCHING, ETC., 50_ ALL SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE FSD FULL SIZE DETAIL TDC TRAFFIC DECK COVERING FT FEET T t G TONGUE 4 GROOVE THAN 1 -1/2 INCHES BETWEEN THE WALL AND THE HANDRAIL_ ° ,(Y T- &41A&4 N o �Gl (� CONTACT OWNER AND /OR ARCHITECT FOR INSTRUCTIONS PRIOR To THE AUTHORITIES HAYING JURISDICTION, TYP_ FH FULL HEIGHT TEMP TEMPERED 1 ®. THE GRIP PORTION OF THE HANDRAIL SHALL BE NOT LESS THAN 1 -i /4 INCH NOR tit I � - `y � CONTINUATION OF WORK SHOULD ANY UNUSUAL CONDITIONS BECOME APPARENT DURING GRADING OR FOUNDATION CONSTRUCTION EXISTING ELEVATIONS AND 5i_ ALL SHOP DRAWING SUBMITTALS SHALL BE SIGNED AND SEALED BY A TEL TELEPHONE GA GAUGE THK THICK MORE THAN TWO INCHES IN CROSS SECTIONAL DIMENSIONS AND THE SURFACES a, 0.= SHALL.. BE SMOOTH WITH NO SHARP CORNERS_ a t.1F�L ci°t O � LOCATIONS TO BE JOINED SHALL BE VERIFIED BY THE CONTRACTOR BEFORE FLORIDA REGISTERED PROFESSIONAL ENGINEER IN THE FIELD OF EXPERTISE GL GLASS TOG TOP OF CONCRETE $� -4 CONSTRUCTION IF THEY DIFFER FROM THOSE SHOWN ON THE DRAWINGS, THE DIRECTLY RELATED TO THE SUBJECT WORK INDICATED /DEFINED, TYP_ GALV or GV GALVANIZE TOP PF CURB 11. THE SURFACE OF RAMPS SHALL BE SLIP RESISTANT_ � f CONTRACTOR SHALL NOTIFY THE OWNER 50 THAT MODIFICATIONS CAN BE MADE GR GRADE TOP TOP OF PARAPET ;� tu BEFORE PROCEEDING WITH THE WORK. 52_ ALL PROTRUDING ARCHITECTURAL ELEMENTS SHALL BE PAINTED WITH SAME LIKE CONTIGUOUS COLOR SELECTION SHOULD ANY QUESTION ARISE DUE TO GYPBD GYPSUM BOARD TOS TOP OF STEEL TYP TYPICAL 12_ WHERE THE RAMP SURFACE IS NOT BOUNDED BY A WALL OR FENCE AND THE d a -. } 1 0) w ►it 20_ GENERAL CONTRACTOR IS TO PROVIDE BLOCKING AS REQUIRED FOR FIELD CONDITION, CONTACT ARCHITECT IMMEDIATELY BEFORE PROCEEDING H HIGH TOW TOP OF WALL RAMP EXCEEDS THE FEET IN LENGTH, THE RAMP SHALL COMPLY WITH ONE THE FOLLOWING REQUIREMENTS-- g c SHEET: MOUNTING OF WALL MOUNTED SHELVES, CABINETS HC GRAB BARS FIXTURES, WITH WORK HDWD HARDWOOD FURNITURE, EQUIPMENT AND PARTITION BRACES_ 53, ALL CONCRETE SURFACES ASSOCIATED WITH TILT UP BOND BREAKING AGENTS HORIZ HORIZONTAL UNO UNLESS NOTED OTHERWISE A, A GUIDE CURB A MINIMUM OF TWO INCHES IN HEIGHT SHALL BE PROVIDED O 2L GENERAL CONTRACTOR SHALL CLEAR, GRUB AND REMOVE ANY DEBRIS LOCATED AROUND THE PERIMETER OF THE SUBJECT CONSTRUCTION SITE AND SHALL BE PREPARED AND TREATED TO ACCEPT THE PAINT APPLICATION AS PER MANUFACTURER'S RECOMMENDED SPECIFICATIONS PRIOR TO WORK BEING HM HOLLOW METAL HP HIGH POINT VERT VERTICAL HT HEIGHT VGT VINYL COMPOSITION TILE AT EACH SIDE OF THE RAMP OR B_ A WHEEL GUIDE RAIL SHALL BE PROVIDED, CENTERED THREE INCHES, PLUS A MINUS ONE INCH ABOVE THE SURFACE OF THE RAMP_ m '6 / U INSTALL A SILT BARRIER FENCE TO CONTAIN THE CONSTRUCTION MATTER DONE_ � o j�ri G �� ..� 2251LIGONE SEALANT CAULK SHALL BE USED AT THE FOLLOWING LOCATIONS: 53, GENERAL CONTRACTOR SHALL COORDINATE THE ARCHITECTURAL DOOR ID INSIDE DIAMETER W WIDE IN INSULATION W/ WITH A. AROUND EXTERIOR DOOR FRAMES,SILLS,HEADS 4 JAMBS SCHEDULE WITH ANY ALL REQUIREMENTS ON THE MECHANICAL DRAWING FOR INT INTERIOR WG WATER CLOSET DWN MAR10 S)=RRALtA B. AROUND WINDOW FRAMES, SILLS, HEADS AND JAMBS OUTSIDE FRESH AIR VENTS NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR WD WOOD Q cHr=r- AW-EL C.SAMI 11,AIA G. AROUND CONDUIT AND PIPE PENETRATIONS AT WALLS CEILINGS, E ROOF_ TO SHOP DRAWINGS SUBMITTALS_ JAN JANITOR WI WROUGHT IRON 2 1, DATE 01.102010 D. JUNCTION OF MILLWORK (CABINETS, SHELVES) E. STAINLESS STEEL TO WALLS m KITCHEN AREA WL WATER LEVEL LAV LAVATORY WP WORKING POINT R BID - F_ ALL UNLIKE SURFACES LEV LEVEL WP WATERPROOFING G_ AROUND ALL TUBS, SHOWERS, E SINKS, LTG LIGHTING WT WEIGHT R CONS.- A LTWT LIGHT WEIGHT COMM- 1040 -205