Loading...
11-1116-007A.DA. ACCESSIBILITY ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH A.D,A. AS FORTH AMERICANS DISABILITIES HANDBOOK. AS B.. EMPLOYMENT THE EQUAL OPPORTUNITY OCTOBER 1991. THE CONTRACTOR O SUBCONTRACTORS RESPONSIBLE FOR THE IMPLEMENTATION OF SUCH. 6. WHERE EXISTING MALLS, CEILINGS OR FIXTURES ARE REMOVED: WALLS 11. PROVIDE WATER PROOFING MEMBRANE OF ALL NEW CONCRETE SLAB ON GRADE POURS.. 12. CONTRACTOR SHALL. PREPARE EXISTING AND NEW FLOOR SURFACES FOR PROPER LEVELING TO RECEIVE NEW PROPOSED FLOOR FINISHES, 13. CONTRACTOR IS TO PROVIDE PROPER BACKING AND BRACING AT ALL AREAS TO RECEIVE MILLWORK CABINETS, SHELVING, ETC. 14. ALL PROPOSED MILLWORK CONSTRUCTION SHALL. COMPLY WITH AWI CUSTOM STANDARDS, 15. CONTRACTOR SHALL COORDINATE AT ROUGH FRAMING PRIOR , TO INSTALLATION OF GYPSUM WALL BOARD ALL PROPOSED CONDUIT TYPES, RUNS, AND LOCATIONS W/ LE FEBURE, ADT, AND DIEBOLD. TYR, ---------------------------NOTES ----------------------- I ALL WORK SHALE DE DONE IN ACCORDANCE WITH FLORIDA BUILDING CODE, AND ALL OTHER APPLICABLE CODES AND STANDARD. 1 jj rg err LNG P C A S C '(O i0h • ... f 151 SEVILLA AVENUE, SUITE 200 CORAL GABLES,,FL 33134 OFFICE: (305)442 -11B8 s% � FAX: (305) 445 -1509 ADCINTERNATIONAL.NETC- STATE OF FLORIDA AR-"bcI10536 RAYMUNDO FE(TO, R.A. AA- 0001315 Architect • SeatlSgnahar� i Construction Documents for: JA 1 V Issue Date & Isitte Description Checked i Client Information Consultant • Seat/Signature r