GENERAL
ALL WORK TO BE PERFORMED UNDER THESE DOCUMENTS SHALL CONFORM WITH THE
FLORIDA BUILDING CODE, AS WELL AS ALL OTHER APPLICABLE STATE AND LOCAL
REGULATIONS AND ORDINANCES.
ALL WORK SHALL BE PERFORMED BY A LICENSED AND INSURED MECHANICAL
CONTRACTOR, IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETE SYSTEM
SHALL BE FULLY OPERATIVE AFTER COMPLETION OF WORK.
MECHANICAL CONTRACTOR SHALL FURNISH TO THE OWNER WRITTEN WARRANTEE THAT THE
INSTALLED SYSTEM SHALL BE FREE OF MATERIALS AND WORKMANSHIP DEFECTS FOR A PERIOD
OF ONE YEAR FROM FINAL ACCEPTANCE.
MECHANICAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING HIS OWN PERMIT AND
PAYING ALL PERMIT AND INSPECTION FEES.
SUBMIT SHOP DRAWINGS FOR ACCEPTANCE BY THE ARCHITECT AND /OR ENGINEER
BEFORE PROCEEDING WITH PURCHASE OR INSTALLA11ON OF THE EQUIPMENT AND
MATERIALS.
THE CONTRACTOR SHALL PROVIDE A SET OF PRINTS CLEARLY MARKED TO SHOW
AS -BUILT CONDITIONS AT THE COMPLETION OF CONSTRUCTION.
INTERRUPTION OF EXISTING FACILITIES AND / OR SERVICES SHALL BE KEPT
TO A MINIMUM. THE CONTRACTOR SHALL FURNISH ALL MATERIALS REQUIRED
WHENEVER TEMPORARY CONNECTIONS ARE NECESSARY TO MAINTAIN CONTINUITY
OF SERVICES, COORDINATE ALL INTERRUPTIONS WITH OWNER.
PRECAU11ONS SHALL BE TAKEN TO PREVENT CONTAMINATION OF OWNER EQUIPMENT,
FURNITURE AND CARPETING WITHIN THIS BUILDING. COVER AND WRAP EQUIPMENT,
FURNITURE AND CARPETING AS NECESSARY. DUST AND DEBRIS SHALL BE STRICTLY
CONTROLLED. CLOSE COORDINATION WITH OWNER WILL BE REQUIRED. DURING
CONSTRUCTION CONTRACTOR SHALL FOLLOW THE "SMACNA" LATEST EDITION "INDOOR AIR
QUALITY GUIDELINES FOR OCCUPIED BUILDINGS UNDER CONSTRUCTION ".
ALL BUILDING CONSTRUCTION AFFECTED BY THE REMOVAL, RELOCATION OR
INSTALLATION OF ANY PIECE OF EQUIPMENT SHALL BE REPAIRED AND FINISHED
AS REQUIRED TO MATCH EXISTING CONDITIONS, OR AS DIRECTED BY THE
ARCHITECTURAL DRAWINGS AND/ OR SPECIFICATIONS.
IF ANY CONFLICT IS ENCOUNTERED WITHIN THE DESIGN DOCUMENTS, REGARDLESS
OF TRADE OR RESPONSIBILITY, THE GREATER SCOPE OF WORK SHALL PREVAIL.
FIELD VERIFICATION
ALL WORK SHALL BE FIELD VERIFIED AND COORDINATED BEFORE INSTALLATION
WITH ALL OTHER TRADES.
WHERE INTERFERENCES OCCUR AND DEPARTURES FROM INDICATED DESIGN
WILL BE REQUIRED TO DETERMINE CHANGES ON LOCATIONS, SIZES AND ELEVATIONS
OF PIPING, DUCTWORK, ETC. THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST
FOR THE CHANGE ACCOMPANIED BY A DETAILED DRAWING FOR APPROVAL FROM
ARCHITECT/ ENGINEER PRIOR TO PROCEEDING WITH ANY CHANGE OR DEPARTURES
FROM EXISTING CONTRACT.
COORDINATE LOCATION OF DUCTWORK WITH OTHER TRADES, PARTICULARLY WHERE
DUCTS RUN THROUGH STRUCTURAL ELEMENTS. PROVIDE ALL NECESSARY SLEEVES
BEFORE CONCRETE IS POURED.
CONTRACTOR SHALL VERIFY EXISTING DUCTWORK SIZES, IF APPLICABLE, WHICH CONNECT TO NE
DUCTWORK BEFORE FABRICATION AND INSTALLATION.
CONTRACTOR SHALL VERIFY EXISTING PIPING SIZES, IF APPLICABLE, WHICH CONNECT TO NEW
PIPING BEFORE FABRICATION AND INSTALLATION.
BEFORE CUTTING OR MAKING OPENINGS IN ANY BUILDING COMPONENT, CONTRACTOR
SHALL VERIFY USING ANY REQUIRED MEANS THAT ITS LOAD BEARING CAPABILITY
IS NOT COMPROMISED IN ANY MATTER.
EXISTING SYSTEMS
NOT USED.
CONTRACTOR SHALL VERIFY THE COOLING AND HEATING CAPACITIES AND AIR SUPPLY
VOLUMES OF ALL EXISTING HVAC SYSTEMS TO REMAIN. THE CONTRACTOR SHALL
ADVISE THE ARCHITECT AND ENGINEER OF ANY DEVIATION FROM WHAT IS INDICATED
ON PLANS, BEFORE PROCEEDING WITH WORK.
NOT USED.
CONTRACTOR SHALL INSPECT ALL EXISTING DUCTWORK TO BE REUSED AND MAKE ANY
NECESSARY REPAIRS TO ENSURE AN AIRTIGHT SYSTEM. AIR LEAKAGE RATES SHALL
BE IN CONFORMANCE WITH THE SMACNA'S STANDARDS. DUCTWORK INSULATION SHALL
BE INSPECTED AND REPLACED IN AREAS WHERE THE INSULATION IS DETERIORATED,
DAMAGED, OR NOT CONTINUOUS. ALL WORK AND MATERIALS SHALL BE IN CONFORMANCE
WITH THE CONTRACT DOCUMENTS. INSPECT AND REPAIR IF REQUIRED DUCT SUPPORTS
TO ENSURE SECURE MOUNTING OF THE DUCT SYSTEM.
CONTRACTOR SHALL ADVISE THE OWNER OF THE GENERAL CONDITIONS OF THE
EXISTING SYSTEMS TO REMAIN.
NOT USED.
ANY EQUIPMENT OR DEVICES TO REMAIN THAT MIGHT HAVE TO BE DISCONNECTED
BECAUSE OF THE REMOVAL OF ANY OTHER DEVICE MUST BE RECONNECTED AND TIED
BACK TO THE EXISTING BUILDING SYSTEMS AND TESTED FOR CORRECT OPERATION.
NEW EQUIPMENT
NOT USED.
MECHANICAL EQUIPMENT SHALL BE SUPPORTED PER MANUFACTURER RECOMMENDATIONS
AND AS REQUIRED FOR APPLICABLE CODES AND STANDARDS, USING INDUSTRY STANDARD
PRACTICES. STRUCTURAL ENGINEER DESIGN AND RECOMMENDATIONS SHALL
BE FOLLOWED. SUBMIT SHOP DRAWINGS OF ALL SUPPORTING STRUCTURES THAT CLEARLY
INDICATE SIZES, MATERIAL, DESIGN AND PRODUCT APPROVAL NUMBERS.
VIBRATION ISOLATORS SHALL BE PROVIDED FOR ALL MECHANICAL EQUIPMENT WITH
MOVING AND /OR ROTARY PARTS. SUBMIT SHOP DRAWINGS SHOWING, BUT NOT LIMITED,
ISOLATION PERFORMANCE AND ALLOWABLE SUPPORTING LOADS.
FOR ALL OUTDOOR MOUNTED EQUIPMENT PROVIDE SURFACE AND COIL PROTECTION
AGAINST CORROSION DUE TO PROXIMITY TO MARINE AND /OR CORROSIVE ENVIRONMENT.
CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR.
THE CONTRACTOR SHALL FURNISH ALL MOTORS, STARTERS AND RELAYS, ETC., TO
CONFORM A FULLY OPERATING SYSTEM. COORDINATE WITH THE ELECTRICAL DIVISION
ALL WORK RELATED TO THE MECHANICAL SYSTEMS.
NOT USED.
NOT USED.
NOT USED.
PROVIDE EQUIPMENT MAINTENANCE AND INSTRUCTION MANUALS. THE MANUAL SHALL
ESTABLISH ALL REQUIRED SCHEDULED MAINTENANCE THAT SHALL BE PERFORMED
DURING THE LIFE OF THE BUILDING TO GUARANTEE THE WORKING CONDITION OF THE
INSTALLED SYSTEM AND THE MAINTENANCE OF A PROPER I.A.Q. IN THE BUILDING.
MANUALS SHALL BE SUBMITTED TO THE ENGINEER FOR ACCEPTANCE.
EQUIPMENT DATA SHOWN IN THE EQUIPMENT SCHEDULES IS BASED ON MANUFACTURER'S
ACTUAL CATALOG. VERIFY THIS INFORMATION WITH MANUFACTURERS PRIOR TO
PURCHASING OR INSTALLING ANY EQUIPMENT. MANUFACTURER'S NAMES SHALL BE
INTERPRETED AS ESTABLISHMENT OF REQUIRED TYPE CLASS AND QUALITY. ALL
SUBSTITUTIONS SHALL BE APPROVED BY THE PROJECT ENGINEER.
PROVIDE ALL NECESSARY INSTRUCTIONS TO THE OWNER IN THE OPERATION OF THE
MECHANICAL SYSTEM.
SEE EQUIPMENT SCHEDULES ON DRAWINGS FOR INFORMATION ON ALL SPECIFIED
EQUIPMENT FOR THIS JOB.
DUCTWORK
PROVIDE ALL NECESSARY ACCESS PANELS TO CONTROL VALVES, DAMPERS, SENSORS,
AND ANY OTHER DEVICES NON- ACCESSIBLE OTHERWISE.
ALL SIZES SHOWN FOR LINED AND UNLINED DUCTS ARE CLEAR INSIDE DUCT DIMENSIONS.
CONDITIONED AIR DUCTWORK SHALL BE CLASS "ONE" FIBER GLASS DUCT BOARD IN
ACCORDANCE WITH SMACNA'S FIBROUS DUCTS STANDARDS, Unless specified otherwise on the
Mechanical Floor Plans. INSULATION SHALL HAVE THE REQUIRED DENSITY AND THICKNESS TO
PROVIDE A MINIMUM INSULATION VALUE OF R -6 FRO SUPPLY DUCTWORK RUNNING THROUGH
UNCONDITIONED SPACE AND R -4.2 FOR DUCTWORK RUNNING THROUGH CONDITIONED SPACE.
PROVIDE VOLUME DAMPERS, TURNING VANES, ETC., IN DUCTWORK FOR PROPER AIR
FLOW AND BALANCE. PROVIDE MULTIPLE VANE EXTRACTORS OR SPUTTERS WITH
CONTROL RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO
MAIN SUPPLY DUCT AND WHERE SHOWN.
NOT USED.
NOT USED.
NOT USED.
TEST AND BALANCING
BALANCE ALL SYSTEMS TO PROVIDE FLOW QUANTITIES AND CAPACITIES AS INDICATED
ON DRAWINGS.
PERFORM A COMPLETE OPERATING AND BALANCING TEST OF THE FINISHED SYSTEM.
PROVIDE WRITTEN REPORT OF THE RESULT OF THIS TEST STATING THE ACCEPTABILITY
OF THE SYSTEM AND COMPLIANCE WITH THE DESIGN DOCUMENTS. TEST AND BALANCE
AGENCY SHALL BE AN INDEPENDENT, AABC OR NEBB CERTIFIED AGENCY, AND SHALL
BE RETAINED BY THE OWNER. CONTRACTOR SHALL COORDINATE WITH OWNER AND TESTING
AND COMMISSIONING AGENCY ALL WORK FOR FINAL CERTIFICATION OF THE HVAC SYSTEM.
OTHER
ALL WORK SHALL BE COORDINATED WITH OWNER /TENANT.
THE CONTRACTOR SHALL PROTECT ALL EXISTING SYSTEMS /DEVICES WHILE PERFORMING THE
SCOPE OF WORK. SHOULD ANY EXISTING SYSTEMS NEED TO BE MODIFIED DUE TO UNFORESEEN
CONDITIONS, THE CONTRACTOR SHALL PRIOR MAKING ANY DETERMINATION INFORM THE
HVAC LEGEND
SYMBOL
DESCRIPTION
A.H.U.
AIR HANDLER UNIT
ER
EXISTING TO BE RELOCATED
N
NEW
BDD
BACK DRAFT DAMPER
0/A
OUTSIDE AIR
CFM
CUBIC FEET PER MINUTE
E.F.
EXHAUST FAN
E.R.
EXISTING TO REMAIN
R/A
RETURN AIR
RG
RETURN GRILLE
S/A
SUPPLY AIR
SR
SIDEWALL REGISTER
TG
TRANSFER GRILLE
MVD
MANUAL VOLUME DAMPER
COND.
CONDENSATE
®
THERMOSTAT, PROGRAMABLE (k)
®
AIR DISTRIBUTION SEE PLAN
SP*
SPRINKLER HEAD (DOWNWARD)
®
SUPPLY DUCT SECTION
m
EXHAUST, RETURN, OR OUTSIDE AIR
p{�
MANUAL VOLUME DAMPER
uvo
MVD AT TAKE OFF
FIRE DAMPER
SUPPLY AIR DUCT RECTANGULAR
DUALL DUCT ACCESSORIES SHALL
HAVE TURNING VANES ALTHOUGH NOT
SHOWN
FLEXIBLE ROUND DUCT
FLEXIBLE ROUND DUCT DOWN
TO GRILLE
?
DUCT MOUNTED SMOKE DETECTOR
TO GRILLE
REMOTE TEST STATION/ AUDIBLE ALARM
CEILING SUPPLY DIFFUSER
®
LINEAR SUPPLY DIFFUSER
AIM
CEILING RETURN DIFFUSER
STANDARD BRANCH SUPPLY OR
RETURN, NO SPUTTER (45• TAP)
WITH MVD AT TAKE OFF
POINT OF CHANGE IN DUCT
CONSTRUCTION STATIC PRESSURE
CLASS.
RETURN AIR (R /A) GRILLE.
SIDEWALL, CEILING GRILLE /REGISTER.
_U_
ONE INCH (1 ") DOOR UNDERCUT.
EXHAUST FAN (CEILING MOUNTED),
Xl}�
OUTSIDE AIR INTAKE WALL CAP.
,�A'
LLII��JJ ��
WALL MOUNTED EXHAUST FAN
(PROPELLER / CENTRIFUGAL).
WALL MOUNTED LOUVER.
CONNECT TO EXISTING
NOTE
NOT ALL SYMBOLS MAY BE USED
HVAC DESIGN REQUIRES:
YES
NO
DUCT SMOKE DETECTOR
**
NOMINAL
MAXIMUM
FIRE DAMPER(S)
0
SMOKE DAMPER(S)
TRANE
VCE06
FIRE RATED ENCLOSURE
�*
277/1/60
FIRE RATED ROOF /FLOOR
STATE OF FLORIDA
NOTES:
FIRE STOPPING
AS SPECIFIED IN THE PROJECT SPECIFICATIONS.
2. UNITS SHALL HAVE ELECTRONIC (DDC), PROPORTIONAL CONTROLS.
SMOKE CONTROL
4. SUPPORT UNITS FROM STRUCTURE ABOVE.
5. UNITS SHALL HAVE ACCESS PANELS FOR DAMPER ACTUATORS.
* * EXISTING
VARIABLE AIR VOLUME BOX SCHEDULE
i
SYMBOLS
MANUFACTURER
MODEL No.
UNIT SIZE
NOMINAL
MAXIMUM
ELECTRICAL
HEATER (Kw)
O
TRANE
VCE06
6
500
277/1/60
3.0';!.
STATE OF FLORIDA
NOTES:
1. ALL UNITS SHALL BE PROVIDE WITH A FACTORY INSTALLED DDC CONTROL
AS SPECIFIED IN THE PROJECT SPECIFICATIONS.
2. UNITS SHALL HAVE ELECTRONIC (DDC), PROPORTIONAL CONTROLS.
3. UNITS SHALL BE CONTROLLED IN RESPONSE TO ROOM TEMPERATURE SENSORS AND CO2 SENSOR WHERE REQUIRED.
4. SUPPORT UNITS FROM STRUCTURE ABOVE.
5. UNITS SHALL HAVE ACCESS PANELS FOR DAMPER ACTUATORS.
6. ALL DIFFUSER RUNOUTS SHALL BE EQUIPPED WITH A MANUAL BALANCING DAMPER.
7. CONTROL UNITS SHALL BE PROVIDED COMPLETE WITH A 208/24 VOLT AC TRANSFORMER AND A FUSED
DISCONNECT SWITCH. DISCONNECT SWITCHES SHALL BE PROVIDED FOR CONTROL POWER AND FOR HEATER
POWER. PROVIDE POWER LINE FUSES TO MATCH LOAD. j
8. CONTRACTOR SHALL PROVIDE ALL REQUIRED FITTINGS TO CONNECT BOXES TO DUCTWORK SIZED AS PER
MANUFACTURER RECOMENDATIONS.
9. ALL NEW UNITS SHALL BE CONNECTED TO EXISTING BUILDING CONTROLS.
151 SEVILLA AVENUE, SUITE 200
CORAL GABLES, FL 33134
OFFICE: (305) 442 -1188
FAX: (305) 445 -1509
WWW. ADCINTERNATIONAL.NET
Issue Date & Issue Description Drawn By Checked By
01 12/04/09
AC AR
y,
STATE OF FLORIDA
AR 0010536
RAYMUNDO FEITO, R.A.
_ _.0001315
Architect • Seal /Signature
Construction Documents for:
a ��
t:
ONE 7000 PLACE
SUITE: 545
5th FLOOR
7000 SW 62nd AVENUE
SOUTH MIAMI, FL 33143
Issue Date & Issue Description Drawn By Checked By
01 12/04/09
AC AR
PERMIT ISSUE
(� Date & Delta Description Drawn By Checked By
07/07.10 P &G P &G
! REVISION PER CLIENT REQUEST
Fc-rient Information
HEALTHCARE REALTY
2601 SW 37th AVENUE
SUITE 805
MIAMI, FL 33133
OFFICE: (305) 446 -3666
Project Number
09127
CAD File Name
ONE 7000 PLACE - SUITE 545 - DR.PEREZ
Description
MECHANICAL SCHEDULE, & NOTES