13-96R-0515 )5.1) 5.2 6
� s
(i 0
KEYNOTES
Q PROVIDE 1/2"C. WITH PULLSTRINGS FOR
THERMOSTAT CONTROLS. COORDINATE WITH
MECHANICAL CONTRACTOR AND LOCATION WITH
ARCHITECTURAL ELEVATIONS.
RUN CONDUITS TO BALCONY
INSIDE WALL /SLAB — NO EXPOSED CONDUITS.
O COORDINATE EXACT LOCATION AND
REQUIREMENTS OF ABOVE CEILING WIFI
ROUTER WITH IT CONSULTANT.
COORDINATE EXACT LOCATION OF CEILING
MOUNTED SPEAKER WITH AUDIO CONSULTANT.
MUSIC SYSTEM TO SHUT DOWN UPON
ACTIVATION OF FIRE ALARM SYSTEM.
O BATHROOM'S EXHAUST FAN TO BE CONNECTED
AND CONTROLLED TO BATHROOM'S LIGHTS
BRANCH CIRCUIT AND LIGHT SWITCH.
COORDINATE LOCATION OF LIGHT SWITCH WITH
ARCHITECTURAL ELEVATIONS.
O COORDINATE LAYOUT OF ELEVATOR EQUIPMENT
ROOM WITH ELEVATOR MANUFACTURER.
COORDINATE LOCATION OF ELECTRICAL
DISCONNECTS WITH ARCHITECTURAL ELEVATIONS
Q PROVIDE 1/2"C. WITH PULLSTRINGS FROM
SECURITY CAMERA BACK TO HEAD END
EQUIPMENT IN IT ROOM 128 OORDINAT
WITH SECURITY VENDOR.
NOT USED. / \
O ROUTING OF 4 "C. WITH PULLSTRINGS FROM
1 ST FLOOR IT ROOM. NO 90 DEGREES BENDS.
to OFFICE 407 HEAD —END EQUIPMENT FOR MUSIC
SYSTEM. PROVIDE 1/2"C. WITH PULLSTRIN
TO CEILING MOUNTED SPEAKS IN THIS 1
OFFICE. 2
t t CARD READER TO BE IN 0 N ONLY
DURING AFTER HOURS AND DISENGAGED
DURING WORKING HOURS. COORDINATE WITH
SECURITY VENDOR.
AREA OF WORK
ER PLAN
SCALE: 1/4" = V -0"
KEY PLAN
N.T.S.
I
Q
C
s
m
G S & P
0
Design Services
For The Built
Environment
Atlanta Birmingham
Cincinnati
Columbus Dallas
Fort Lauderdale'
Knoxville Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
G R E S H A M
SMITH AND
P A R T N E R S'
6`030 Hollywood Blvd.
Suite 2`10
Hollywood, Florida 33024
954.981.9100
FIRM'S FLORIDA
CERT. NO
AAP000034/CA380.6
B`26000797/LC26000381
DELTA G CONSULTING
ENGINEERS. INC.
707 N.E. rd AVE., SUITE 200
FORT LAUDERDALE, FL. 33304
c +i (954) 527 -1112
CA #00009181
PJT. UGR: bUCHAEL H00
PROJECT #: 120717
� Q
" rt W cr
M �
y,,, �• a
r
Lo
_.
Q w `O o
e
,
CJ � w ,
a
GEbitUF,,;$ANJUMI
DATE;
REVISION
No. - Date - Revision/21
1
02/01/13
Addendum #1
7 10104/13 I.T. Revisions
PARTIAL FOURTH
FLOOR ENLARGED
POWER PLAN
E3.4a
FILE:
PROJECT: 29080.00
DATE: 11/29/2012