Loading...
13-96R-0515 )5.1) 5.2 6 � s (i 0 KEYNOTES Q PROVIDE 1/2"C. WITH PULLSTRINGS FOR THERMOSTAT CONTROLS. COORDINATE WITH MECHANICAL CONTRACTOR AND LOCATION WITH ARCHITECTURAL ELEVATIONS. RUN CONDUITS TO BALCONY INSIDE WALL /SLAB — NO EXPOSED CONDUITS. O COORDINATE EXACT LOCATION AND REQUIREMENTS OF ABOVE CEILING WIFI ROUTER WITH IT CONSULTANT. COORDINATE EXACT LOCATION OF CEILING MOUNTED SPEAKER WITH AUDIO CONSULTANT. MUSIC SYSTEM TO SHUT DOWN UPON ACTIVATION OF FIRE ALARM SYSTEM. O BATHROOM'S EXHAUST FAN TO BE CONNECTED AND CONTROLLED TO BATHROOM'S LIGHTS BRANCH CIRCUIT AND LIGHT SWITCH. COORDINATE LOCATION OF LIGHT SWITCH WITH ARCHITECTURAL ELEVATIONS. O COORDINATE LAYOUT OF ELEVATOR EQUIPMENT ROOM WITH ELEVATOR MANUFACTURER. COORDINATE LOCATION OF ELECTRICAL DISCONNECTS WITH ARCHITECTURAL ELEVATIONS Q PROVIDE 1/2"C. WITH PULLSTRINGS FROM SECURITY CAMERA BACK TO HEAD END EQUIPMENT IN IT ROOM 128 OORDINAT WITH SECURITY VENDOR. NOT USED. / \ O ROUTING OF 4 "C. WITH PULLSTRINGS FROM 1 ST FLOOR IT ROOM. NO 90 DEGREES BENDS. to OFFICE 407 HEAD —END EQUIPMENT FOR MUSIC SYSTEM. PROVIDE 1/2"C. WITH PULLSTRIN TO CEILING MOUNTED SPEAKS IN THIS 1 OFFICE. 2 t t CARD READER TO BE IN 0 N ONLY DURING AFTER HOURS AND DISENGAGED DURING WORKING HOURS. COORDINATE WITH SECURITY VENDOR. AREA OF WORK ER PLAN SCALE: 1/4" = V -0" KEY PLAN N.T.S. I Q C s m G S & P 0 Design Services For The Built Environment Atlanta Birmingham Cincinnati Columbus Dallas Fort Lauderdale' Knoxville Jackson Jacksonville Louisville Memphis Nashville Richmond Tampa G R E S H A M SMITH AND P A R T N E R S' 6`030 Hollywood Blvd. Suite 2`10 Hollywood, Florida 33024 954.981.9100 FIRM'S FLORIDA CERT. NO AAP000034/CA380.6 B`26000797/LC26000381 DELTA G CONSULTING ENGINEERS. INC. 707 N.E. rd AVE., SUITE 200 FORT LAUDERDALE, FL. 33304 c +i (954) 527 -1112 CA #00009181 PJT. UGR: bUCHAEL H00 PROJECT #: 120717 � Q " rt W cr M � y,,, �• a r Lo _. Q w `O o e , CJ � w , a GEbitUF,,;$ANJUMI DATE; REVISION No. - Date - Revision/21 1 02/01/13 Addendum #1 7 10104/13 I.T. Revisions PARTIAL FOURTH FLOOR ENLARGED POWER PLAN E3.4a FILE: PROJECT: 29080.00 DATE: 11/29/2012