13-96R-048z
O
H
Q
z
z
O
U
Ce
O
LL
M
W
L
(n
W
W
PARTIAL FIRST FLOOR -NEW CONSTRUCTION POWER
MATC'HI TNF A
SCALE: 1/4" = V -0"
z
O
H
Q
z
H
Z
O
U
0
U
cy'i
W
W
W
W
W
(J)
i
R/
WP
jWP gyp, 10 7
GE
10E-15
-EDP -13
10E -12
`1E -15
EDP -14
(@ 10
MATCHLINE A
PARTIAL FIRST FLOOR - POWER
CT SCAN KEYNOTES
O ELECTRICAL PANEL 'CT' WITH 3P/125A MAIN
CIRCUIT BREAKER WITH SHUNT TRIP TO TRIP
WHEN ANY EPO IS PRESSED. THE SHUNT TRIP
CIRCUIT BREAKER MUST BE OF FAIL —SAFE
DESIGN. FIELD COORDINATE EXACT LOCATION
WITH VENDOR /OWNER PRIOR TO INSTALLATION.
O EPO — EMERGENCY POWER OFF WITH
PROTECTIVE COVER THAT PREVENTS ACCIDENTAL
ACTIVATION. THE EPO MUST BE OF FAIL —SAFE
DESIGN, THE CONTROL CIRCUIT FOR THE EPO(S)
MUST HAVE AN ENERGY STORAGE SOURCE SO
THAT THE CONTROL CIRCUIT NEVER LOSES
POWER. ALL EPO(S) ARE TO BE LATCHING TYPE
AND MUST RESET BEFORE MAIN CIRCUIT
BREAKER CAN BE RESET. PROVIDE "EMERGENCY
OFF" NAME PLATE FOR THE EPO(S).
0 "X —RAY ON" WARNING LIGHT ABOVE DOOR AND
DOOR SWITCH. WARNING SIGN TO USE ONLY
INCANDESCENT LAMPS. REFER TO X —RAY SITE
SPECIFIC DRAWINGS FOR ADDITIONAL
INFORMATION.
O DUPLEX OUTLET MOUNTED ABOVE FINISHED
CEILING FOR LAP CEILING LASER LIGHT.
O LIGHT SWITCH FOR CONTROLS OF WARNING
LIGHTS TO TURN OFF FOR SERVICE PURPOSES.
PROVIDE "WARNING LIGHTS CONTROL" NAME
PLATE FOR THE LIGHT SWITCH.
REFER TO KEYNOTES ON SHEET E3.1e..
I "1
SCALE: 1/4" = V -0"
KEY PLAN
1 N.T.S.
0
m
c
3
O
r
N
O
0
OR
0
's
U
co
r
tD
r
N
r
ai
Design Services
For The Built
Environment
0
Atlanta Bi'rmingham
Cincinnati
Columbus Dallas
Fort Lauderdale
KnoxvifTe Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
0
G R E S H A M
S M I T H A N D
P A R T N E R S
6030 Hollywood Blvd_.
Suite 210
Hollywood, Florida 33024
954.981.9100
FIRM'S FLORIDA
CERT. NO.
AAP0000`34/CA3806
I B26000797/LC >260`00381
DELTA G CONSULTING
ENGINEERS, INC.
,;, 707 N.E. 3rd AVE., SUITE 200
rr>> ' FORT LAUDERDALE, FL. 33304
�" neEarc +x f (954) 527 -1112
CA #00009181
PTT. MGR: WCHAEL H00
PROJECT #: 120717
LdQ
MM 4,
0
Q
Q
LC)
Q M
LO
O
wry
% %,. a 3 E O ,, fjo �
�' t
_ � ct��
a - �,� oQ
rn
DATE: 4/4/14
REVISION
No, - Date - Revision
Q02/01/13
QJ
03/15/13 _
Addendum #1
City Comments Response
g
03/29/13
City Comments Response
7Q 10/04/13 I.T. Revisions
PARTIAL FIRST FLOOR
NEW CONSTRUCTION
POWER PLAN
E3m1b
FILE:
PROJECT: 29080.00
DATE: 11/29/2012