�-" 2 C2. - '-') C5 KEYNOTES
2.1'( 3 \
- /
% RECEPTACLES IN ELEVATOR PIT. COORDINATE
- EXACT LOCATION WITH ELEVATOR SUPPLIER
PRIOR TO ROUGH -IN.
O PROVIDE CAMERA IN ELEVATOR CABINET.
COORDINATE WITH ELEVATOR SUPPLIER.
O COORDINATE EXACT LOCATION AND
REQUIREMENTS OF ABOVE CEILING WIFI
ROUTER WITH IT CONSULTANT.
COORDINATE EXACT LOCATION OF CEILING
MOUNTED SPEAKER WITH AUDIO CONSULTANT.
MUSIC SYSTEM TO SHUT DOWN UPON
ACTIVATION OF FIRE ALARM SYSTEM.
O BATHROOM'S EXHAUST FAN TO BE CONNECTED
AND CONTROLLED BY BATHROOM'S LIGHTS
BRANCH CIRCUIT AND LIGHT SWITCH.
O GEF TO BE CONTROLLED BY GARAGE'S CO
SENSOR. COORDINATE WITH MECHANICAL
DRAWINGS.
t� COORDINATE LAYOUT OF IT ROOM WITH IT
CONSULTANT PRIOR TO ROUGH -IN OF
RECEPTACLES.
0 AHU PROVIDE WITH BUILT -IN DISCONNECT.
COORDINATE WITH MECHANICAL CONTRACTOR.
t�9 PROVIDE 1/2"C. WITH PULLSTRINGS FOR
THERMOSTAT CONTROLS. COORDINATE WITH
MECHANICAL CONTRACTOR AND LOCATION WITH
ARCHITECTURAL ELEVATIONS.
10 PROVIDE 1/2"C. WITH PULLSTRINGS FROM
SECURITY CAMERA BACK TO HEAD END
EQUIPMENT IN IT ROOM 128. OORDINATE
WITH SECURITY VENDOR. 2
SERVICE ENTRANCE RATED ROTARY
SWITCH WITH CAM LOCKS FOR PORTABLE
GENERATOR CONNECTION.
t2 VARIAN EQUIPMENT MAIN CIRCUIT BREAKERS.
COORDINATE EXACT LOCATION WITH VARIAN
PRIOR TO INSTALLATION AND LOCATION WITH
ARCHITECTURAL ELEVATIONS. I
13 EXIT LOOP SAW -CUT IN GROUND. PROVIDE
1/2" CONDUIT WITH PULLSTRINGS BACK TO
GATE OPERATOR. COORDINATE EXACT
LOCATION /REQUIREMENTS WITH GATE SUPPLIER.
G VEHICLE LOOP DETECTOR. PROVIDE 1/2"
CONDUIT WITH PULLSTRINGS BACK TO GATE
OPERATOR. COORDINATE EXACT
LOCATION /REQUIREMENTS WITH GATE SUPPLIER.
is COORDINATE WITH MECHANICAL DRAWINGS AND
CONTRACTOR FOR CONTROLS OF MOTORIZED
DAMPER.
16 J -BOX FOR DATA MOUNTED IN CEILING SPACE
Z FOR FUTURE USE. ROUTE 1" E.C. WITH
0 PULLSTRINGS BACK TO IT 128.
J -BOX FOR POWER MOUNTED IN CELING
Q SPACE FOR FUTURE USE. ROUTE 1" E.C. WITH
PULLSTRINGS BACK TO ELEC. 122.
z �s COORDINATE ALL CONDUIT PENETRATIONS OF
�+ VAULT AND BRACHY WITH VARIAN
zREPRESENTATIVE.
0 1s AHU PROVIDED WITH BUILT -IN DISCONNECT
U AND CONNECTED TO CU ON ROOF.
COORDINATE WITH MECHANICAL DRAWINGS /
CONTRACTOR.
0 Zo IEC 60309, 30A, 250V POWER INLET POWERED
BY ACCELERATOR CIRCUIT BREAKER PANEL.
-0 REFER TO VARIAN SITE DRAWINGS. COORDINATE
T-4 LOCATION WITH ARCHITECTURAL ELEVATIONS.
IM Zt MOUNT RECEPTACLES AFF IN VAULT PER
W TRUEBEAM SITE DRAWINGS.
1 22 IN -USE AND X -RAY IN USE WARNING LIGHTS
W (CONTRACTOR FURNISHED /VERITAS INSTALLED)
= TO RELAY JUNCTION BOX BY VARIAN,
COORDINATE LOCATION WITH ARCHITECTURAL
ELEVATIONS.
W
Uj
23 DOOR SAFETY INTERLOCKS (CONTRACTOR
Ln FURNISHED AND INSTALLED) TO RELAY
JUNCTION BOX BY VARIAN. COORDINATE
LOCATION WITH ARCHITECTURAL ELEVATIONS.
24 RELAY J -BOX (VARIAN FURNISHED,
CONTRACTOR INSTALLED). REFER TO TRUEBEAM
SITE DRAWINGS. COORDINATE LOCATION WITH
ARCHITECTURAL ELEVATIONS.
25 OBI SYSTEM EMERGENCY SHUT OFF - VERIFY
EXACT LOCATION WITH SUPPLIER.
zs PROVIDE OUTLET AND OUTLET COVER TO BE
DARK BROWN IN COLOR. COORDINATE LOCATION
WITH ARCHITECTURAL ELEVATIONS.
27 REMOTE GATE CONTROL - CONNECT TO GATE
CONTROL PANEL.
2 � rHK i iH� r1K5 i t-�UUK -NEW CONSTRUCTION POWER
SCALE: 1/4" = 1' -0"
AREA OF W
c
0
o:
a�
k
:i
N
O
4
O
0
o!
U
m
is
T-
N
�I
KEY PLAN
F
P
D
G S & P
a
Design Services
For The Bu „IIt
Environment
N
Atlanta Birm,i,ngham
Cincinnati
Columbus Dallas
Fort Lauderdale.
Knoxville Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
0
G R E S H A M
S M I T H A N D
P A R T N E R S
6030 Hollywood Blvd_.
Suite 210
Hollywood, Florida 33024
954.981.9100
FIRIVI'S FLORIDA
CE'RT NO.
AAP000034 /CA3806.
IB26000797/LC26000381
DELTA G CONSULTING
x ` ENGINEERS. INC.
707 N.E. 3rd AVE., SUITE 200
FORT LAUDERISALE, FL. 33304
a (954) 527 -1112
dlW r TMs4 F 1 t lu
AY'JAN�N e(IAMWu
µua'ac;xawu,�nmm, CA #00009181
PTT. MGR: MICHAEL H00
PROJECT #: 120717
DATE' ,?F j, 14/ V 0%.
REVISION
No. - Date - Revision
02101/13
Addendum #1
2
03/15/13
City Comments Response
3
M�
City Comments Response
m
♦+
qA
<.
A�11,
41-110
t,
4-• p
t
LL
„�s RTC
A
O�
;
<:
Q
X
Ln
Z)
* S ift-
r
�1�eo
0 E O /Z)
%
p 9 u
/f)
�;GEO$ E”
:'P -'t, � ja
DATE' ,?F j, 14/ V 0%.
REVISION
No. - Date - Revision
02101/13
Addendum #1
2
03/15/13
City Comments Response
3
03/29/13
City Comments Response
/7\ \ 10/04/13 I.T. Revisions
PARTIAL FIRST FLOOR
NEW CONSTRUCTION
POWER PLAN
E3.1a
ILE:
ROJECT: 29080.00
ATE: 1 1/29/2012