Loading...
13-96R-047� g c; r E .--- -- (C �G. of �­-" 2 C2. ­- '-­') C5 KEYNOTES 2.1'( 3 \ - / % RECEPTACLES IN ELEVATOR PIT. COORDINATE - EXACT LOCATION WITH ELEVATOR SUPPLIER PRIOR TO ROUGH -IN. O PROVIDE CAMERA IN ELEVATOR CABINET. COORDINATE WITH ELEVATOR SUPPLIER. O COORDINATE EXACT LOCATION AND REQUIREMENTS OF ABOVE CEILING WIFI ROUTER WITH IT CONSULTANT. COORDINATE EXACT LOCATION OF CEILING MOUNTED SPEAKER WITH AUDIO CONSULTANT. MUSIC SYSTEM TO SHUT DOWN UPON ACTIVATION OF FIRE ALARM SYSTEM. O BATHROOM'S EXHAUST FAN TO BE CONNECTED AND CONTROLLED BY BATHROOM'S LIGHTS BRANCH CIRCUIT AND LIGHT SWITCH. O GEF TO BE CONTROLLED BY GARAGE'S CO SENSOR. COORDINATE WITH MECHANICAL DRAWINGS. t� COORDINATE LAYOUT OF IT ROOM WITH IT CONSULTANT PRIOR TO ROUGH -IN OF RECEPTACLES. 0 AHU PROVIDE WITH BUILT -IN DISCONNECT. COORDINATE WITH MECHANICAL CONTRACTOR. t�9 PROVIDE 1/2"C. WITH PULLSTRINGS FOR THERMOSTAT CONTROLS. COORDINATE WITH MECHANICAL CONTRACTOR AND LOCATION WITH ARCHITECTURAL ELEVATIONS. 10 PROVIDE 1/2"C. WITH PULLSTRINGS FROM SECURITY CAMERA BACK TO HEAD END EQUIPMENT IN IT ROOM 128. OORDINATE WITH SECURITY VENDOR. 2 SERVICE ENTRANCE RATED ROTARY SWITCH WITH CAM LOCKS FOR PORTABLE GENERATOR CONNECTION. t2 VARIAN EQUIPMENT MAIN CIRCUIT BREAKERS. COORDINATE EXACT LOCATION WITH VARIAN PRIOR TO INSTALLATION AND LOCATION WITH ARCHITECTURAL ELEVATIONS. I 13 EXIT LOOP SAW -CUT IN GROUND. PROVIDE 1/2" CONDUIT WITH PULLSTRINGS BACK TO GATE OPERATOR. COORDINATE EXACT LOCATION /REQUIREMENTS WITH GATE SUPPLIER. G VEHICLE LOOP DETECTOR. PROVIDE 1/2" CONDUIT WITH PULLSTRINGS BACK TO GATE OPERATOR. COORDINATE EXACT LOCATION /REQUIREMENTS WITH GATE SUPPLIER. is COORDINATE WITH MECHANICAL DRAWINGS AND CONTRACTOR FOR CONTROLS OF MOTORIZED DAMPER. 16 J -BOX FOR DATA MOUNTED IN CEILING SPACE Z FOR FUTURE USE. ROUTE 1" E.C. WITH 0 PULLSTRINGS BACK TO IT 128. J -BOX FOR POWER MOUNTED IN CELING Q SPACE FOR FUTURE USE. ROUTE 1" E.C. WITH PULLSTRINGS BACK TO ELEC. 122. z �s COORDINATE ALL CONDUIT PENETRATIONS OF �+ VAULT AND BRACHY WITH VARIAN zREPRESENTATIVE. 0 1s AHU PROVIDED WITH BUILT -IN DISCONNECT U AND CONNECTED TO CU ON ROOF. COORDINATE WITH MECHANICAL DRAWINGS / CONTRACTOR. 0 Zo IEC 60309, 30A, 250V POWER INLET POWERED BY ACCELERATOR CIRCUIT BREAKER PANEL. -0 REFER TO VARIAN SITE DRAWINGS. COORDINATE T-4 LOCATION WITH ARCHITECTURAL ELEVATIONS. IM Zt MOUNT RECEPTACLES AFF IN VAULT PER W TRUEBEAM SITE DRAWINGS. 1 22 IN -USE AND X -RAY IN USE WARNING LIGHTS W (CONTRACTOR FURNISHED /VERITAS INSTALLED) = TO RELAY JUNCTION BOX BY VARIAN, COORDINATE LOCATION WITH ARCHITECTURAL ELEVATIONS. W Uj 23 DOOR SAFETY INTERLOCKS (CONTRACTOR Ln FURNISHED AND INSTALLED) TO RELAY JUNCTION BOX BY VARIAN. COORDINATE LOCATION WITH ARCHITECTURAL ELEVATIONS. 24 RELAY J -BOX (VARIAN FURNISHED, CONTRACTOR INSTALLED). REFER TO TRUEBEAM SITE DRAWINGS. COORDINATE LOCATION WITH ARCHITECTURAL ELEVATIONS. 25 OBI SYSTEM EMERGENCY SHUT OFF - VERIFY EXACT LOCATION WITH SUPPLIER. zs PROVIDE OUTLET AND OUTLET COVER TO BE DARK BROWN IN COLOR. COORDINATE LOCATION WITH ARCHITECTURAL ELEVATIONS. 27 REMOTE GATE CONTROL - CONNECT TO GATE CONTROL PANEL. 2 � rHK i iH� r1K5 i t-�UUK -NEW CONSTRUCTION POWER SCALE: 1/4" = 1' -0" AREA OF W c 0 o: a� k :i N O 4 O 0 o! U m is T- N �I KEY PLAN F P D G S & P a Design Services For The Bu „IIt Environment N Atlanta Birm,i,ngham Cincinnati Columbus Dallas Fort Lauderdale. Knoxville Jackson Jacksonville Louisville Memphis Nashville Richmond Tampa 0 G R E S H A M S M I T H A N D P A R T N E R S 6030 Hollywood Blvd_. Suite 210 Hollywood, Florida 33024 954.981.9100 FIRIVI'S FLORIDA CE'RT NO. AAP000034 /CA3806. IB26000797/LC26000381 DELTA G CONSULTING x ` ENGINEERS. INC. 707 N.E. 3rd AVE., SUITE 200 FORT LAUDERISALE, FL. 33304 a (954) 527 -1112 dlW r TMs4 F 1 t lu AY'JAN�N e(IAMWu µua'ac;xawu,�nmm, CA #00009181 PTT. MGR: MICHAEL H00 PROJECT #: 120717 DATE' ,?F j, 14/ V 0%. REVISION No. - Date - Revision 02101/13 Addendum #1 2 03/15/13 City Comments Response 3 M� City Comments Response m ♦+ qA <. A�11, 41-110 t, 4-• p t LL „�s RTC A O� ; <: Q X Ln Z) * S ift- r �1�eo 0 E O /Z) % p 9 u /f) �;GEO$ E” :'P -'t, � ja DATE' ,?F j, 14/ V 0%. REVISION No. - Date - Revision 02101/13 Addendum #1 2 03/15/13 City Comments Response 3 03/29/13 City Comments Response /7\ \ 10/04/13 I.T. Revisions PARTIAL FIRST FLOOR NEW CONSTRUCTION POWER PLAN E3.1a ILE: ROJECT: 29080.00 ATE: 1 1/29/2012