Loading...
13-96R-020y3' � r % vLn I > � :> W zzzzz I � I � I ° r- I a cc o D D �» -I- -- o> a v M WU• —• —W Nt�VLn N~ 0 z L L U W W W LL LL — W U U Q W W W W W ��LL L LtZW ft� ft� C--Ir I CL f9 fPr E{3 <C Q {fr fH fH fA 4A 40 I I I I � I I I I I I I � a_ CD I L I � I � U) I c\i m I L � I a t I � � L C L z W � r- tpOCq j I EP, CD V"00 (f}44 I L I� I � °L I 14� .. �/W W W- � . � � Y�W,V-�Y Y�WWW��WWW,Y✓WY��/�w'Y ENLARGED PLAN STAIR A -4 — FOURTH FLOOR 1 p 2' 4' 8' I 1 %i ►1 N T bo �o ENLARGED PLAN STAIR A -3 — THIRD FLOOR �� 2' 4' 8' Tn PIPE, REFER TO PLUMBING RETE BLOCK 4 A4.2 1 5 9' -2" 4' -11" 8 110 TREADS @ 11" EACH I @) 9 q T 9 A4.4 CONCRETE BLOCK STAND PIPE, REFER TO PLUMBING DRAWINGS. 5 T m 5/17/2013 M I T VE REVISION -p m -D Q) J OWNER REQUESTED CHANGES F Z o m OJ o a) a L c- a C-) U a y3' � r % vLn I > � :> W zzzzz I � I � I ° r- I a cc o D D �» -I- -- o> a v M WU• —• —W Nt�VLn N~ 0 z L L U W W W LL LL — W U U Q W W W W W ��LL L LtZW ft� ft� C--Ir I CL f9 fPr E{3 <C Q {fr fH fH fA 4A 40 I I I I � I I I I I I I � a_ CD I L I � I � U) I c\i m I L � I a t I � � L C L z W � r- tpOCq j I EP, CD V"00 (f}44 I L I� I � °L I 14� .. �/W W W- � . � � Y�W,V-�Y Y�WWW��WWW,Y✓WY��/�w'Y ENLARGED PLAN STAIR A -4 — FOURTH FLOOR 1 p 2' 4' 8' I 1 %i ►1 N T bo �o ENLARGED PLAN STAIR A -3 — THIRD FLOOR �� 2' 4' 8' Tn PIPE, REFER TO PLUMBING RETE BLOCK 4 A4.2 1 5 9' -2" 4' -11" 8 110 TREADS @ 11" EACH I @) 9 q g' -1p" g 9 A4.4 CONCRETE BLOCK STAND PIPE, REFER TO PLUMBING DRAWINGS. 5 STAIR 1 I 1 ? 1 i v� 7.1 5/17/2013 CITY COMMENTS RESPONSE I 10/04/2013 VE REVISION ® A-1'1 -- - - -� w m J OWNER REQUESTED CHANGES m OJ LL- 0 a VA I ' = O Cil , W o N 12' -10" CONCRETE BLOCK WALL. 14 TREADS @ 11" EACH 6'-7" 8 SEE STRUCTURAL DRAWING. 7 INSTALL UP TO BOTTOM OF 8 A4.4 STAIRS AND LANDING ABOVE. SEE NOTE 12 ON A 7.10. A4.4 ENLARGED PLAN STAIR A -1 — FIRST FLOOR 4 (: ) 0 2' 4' 8' A MMI'l — STAND PIPE, REFER TO PLUMBING DRAWINGS. — CONCRETE BLOCK 5 .1 ,ENLARGED .5 1) PLAN STAIR A -2 — SECOND FLOOR Q4' 8' 1 ) PIPE, REFER UMBING 'INGS. RETE BLOCK TOP OF ELEVATOR PENTHOUSE TOP OF CANOPY EL, + 50' -0" TOP OF ROOF SLAB EL. + V -10" FLUORESCENT LIGHT FIXTURE, (TYPICAL). SEE ELECTRICAL DRAWINGS. SHELL SPACE 417 TOP OF FOURTH FLOOR SLAB @ SHELL SPACE EL. + 35' -8.. CMU BLOCK WALL. REFER TO STRUCTURAL DRAWINGS FOR REINFORCEMENT. PARKING THIRD FLOOR TOP OF THIRD FLOOR SLAB EL. + 25' -0" r � M PARKING SECOND FLOOR TOP OF SECOND FLOOR SLAB EL. + 15' -0" LOBBY FIRST FLOOR TOP OF FIRST EL. 0' -0" 8" STRUCTURAL BEAM AND STAIR NOSING TC BE POURED AT SAME TIME. REFER TO STRUCTURAL DRAWINI FOR FURTHER INFORMATION. DETAIL NOT TO SCALE 11 11 11 11 1 3 - -- _ -- - - — - — - — - — - — - — - — - -- x.22 A3.24 SIM h . 3 A7.10 / / / I \ s, I 7.10 / 8 7 A7.10 s\ 6(SIM' — A7.10 .ral SEALED CONCRETES '"'� — ­ _F SECTION — STAIR "AI' ACM PANELS. SEE SPECIFICATION SECTION 07 4213.23. REFER TO MANUFACTURER'S DETAILS FOR TOP AND BOTTOM CONDITIONS. STUCCO SKIM COAT. PAINT TO MATCH CEILING 3/4" THICK STUCCO ON BOTTOM OF BEAM TO END AT WIDE FLANGE CASING BEAD. MODEL # 1075 BY PLASTIC COMPONENTS, INC. CAULK TRANSITION FROM STUCCO TO DRYWALL. COLOR TO MATCH CEILING PAINT GYPSUM BOARD TO END AT "TILLABLE "I" BEAD" MODEL # 201 -50 BY PLASTIC COMPONENTS, INC. 0 00 Ln u) 0 ip 4 .0 1 tD O U) Ln LU Ln @J o cn �n W rn - 0 0 0� 1O 1 CaJ O � Ln W i 0 1 rn v- o' to V) CONCRETE LANDING, (TYPICAL). SEE STRUCTURAL DRAWINGS 0 - ' b 1 � rn I � I � I �V) 60 U) I r�i � r✓WWWW- WI.- /WW -YfY� V) ACM PANELS. SEE SPECIFICATION >� SECTION 07 4213.23. REFER TO MANUFACTURER'S DETAILS FOR TOP AND BOTTOM CONDITIONS. NOTE: ALL RISER TO BE EQUAL IN HEIGHT FROM TOP OF FINISH TILE FLOORING.Q 1 Copyright 2012 Gresham, Smith and Partners. All Rights Reserved. Design Services For The Built Environment ■ Atlanta Birmingham Cincinnati Columbus Dallas Fort Lauderdale Knoxville Jackson Jacksonville Louisville Memphis Nashville Richmond Tampa N G R E S H A M S M I T H A N D P A R T N E R S 6030 Hollywood Blvd. Suite 210 Hollywood, Florida 33024 954.981.9100 FIRM'S FLORIDA CERT. NO. AAP000034 /CA3806 IB26000797/LC26000381 SEAL: Kristin S. Herman -Druck REVISION No. — Date — Revision Al 4) ADDENDUM #1 A5 5/17/2013 CITY COMMENTS RESPONSE A 10/04/2013 VE REVISION ® 10/30/2013 •— w m J OWNER REQUESTED CHANGES m OJ LL- 0 a = O Cil W o N SEAL: Kristin S. Herman -Druck REVISION No. — Date — Revision Al 2/01/2013 ADDENDUM #1 A5 5/17/2013 CITY COMMENTS RESPONSE A 10/04/2013 VE REVISION ® 10/30/2013 VE STRUCTURAL REVISION A 4/02/2014 OWNER REQUESTED CHANGES ENLARGED PLANS & SECTIONS & STAIR "A" ■ FILE: 9 0 8 0 A 7 0 1 . d g n PROJECT: 29080.00 DATE: 12/14/2012