Loading...
13-96-194I FINISH & ACCENT LEGEND SHEET SPECIFIC KEYNOTES CABINET/ 101. REFER TO ELEVATIONS ON SHEET A5.6 FOR FURTHER INFORMATION. I COUNTERTOP -31- XX- X/XX -X WALLS _XXXXXX XX 102. REFER TO ELEVATIONS ON A5 SERIES FOR FURTHER INFORMATION ON APPLIED FINISH. - - - - - - - BASE XXXXXX -XX FINISH BOX - SEE SHEET D0.2 FOR 103. REFER TO ELEVATION ON A5 SERIES FOR ADDITION INFORMATION ON APPLIED WALLCOVERING _ _ _ _ -- _ FLOOR XXX)CXX -XX "INTERIOR DESIGN FINISH LISTING" WRAPPED PANEL ABOVE BENCH. ----- ��-� ACCENT AND /OR SPECIFIC FINISH 104. INSTALL ROLLER SHADES (RS -1) AT EXTERIOR WINDOWS. - - - - - - - - T m G S P I T co -o -- FLOORING TRANSITION REQUIRED BETWEEN DIFFERENT FINISH MATERIALS 105. INSTALL T -1 FLOORING AT EXTERIOR BALCONY. ENSURE COORDINATION BETWEEN LIGHTING 0° -0 a' (SEE TRANSITION DETAILS ON SHEET A8.15. AND BALCONY DETAIL. SEE ARCHITECTURAL DRAWINGS FOR DETAIL. I N > o aa) a CHANGE IN FLOORING WHERE A TRANSITION IS NOT REQUIRED 106. REFER TO DETAIL 3A/A8.15 FOR FINISH TRANSITION. FACE OF MOSAIC TILE TO ALIGN WITH 0 I L _C c ADJACENT DRYWALL PARTITION. Design Services I I DIRECTION OF FLOORING INSTALLATION 107. SPECIFIED FLOORING TO RUN UNDER DOOR AND ALIGN WITH EDGE OF VAULT WALL. F o r The Built TRANSITION STRIP AND FINISHES WITHIN VAULT SHALL BE PROVIDED BY VERITAS; COORDINATE WITH VENDOR DRAWINGS. NOTES: A. THIS FINISH & ACCENT FINISH LEGEND IS ONLY A SYMBOLIC REPRESENTATION 108. PAINT ALL DRYWALL SURFACES WITH PAINT AS INDICATED. CONCRETE SUBSTRATE AS -IS. Environment OF DIFFERENT MATERIAL TYPES USED FOR THIS PROJECT. B. THE CONTRACTOR SHALL REFER TO THE INTERIOR DESIGN FINISH LISTING ON 109. SEE DETAIL 2/D2.4 FOR DETAIL OF AREA RUG INSTALLATION. SHEET'D0.1, ''D0.2,' THE INTERIOR DESIGN DRAWINGS, AND THE PROJECT 110. REFER TO VERITAS VENDOR DRAWINGS FOR FINISH MATERIAL WHERE INDICATED. Atlanta B i r m i n g h a m MANUAL FOR ADDITIONAL PRODUCT AND COLOR SPECIFICATIONS. I C. SEE SHEET D0.1 FOR "INTERIOR DESIGN GENERAL NOTES" Cincinnati 111. FIRST FLOOR LANDING AND STAIRS TO 2ND FLOOR TO RECIEVE QUARZ COMPAC FINISH. Columbus Dallas I INTERIOR DESIGN FINISH ABBREVIATIONS SEE FINISH LISTING ON SHEET D0. 2 FOR FINISH AND GENERAL STAIR INFORMATION. Fort Lauderdale 112. SECOND FLOOR LANDING, AND ALL STAIRS AND LANDINGS TO 4TH FLOOR TO RECIVE TRAFFIC Knoxville Jackson COATING FLOOR. SEE FINISH LISTING ON SHEET D0.2 FOR FINISH AND GENERAL STAIR INFORMATION. I CP CARPET RS ROLLER SHADE Jacksonville Louisville ' EFG ENTRANCE FLOOR GRILLE RT RUBBER TILE 113. REFER TO ARCHITECTURAL DRAWINGS FOR EXTERIOR WALL FINISHES. Memphis Nashville EP EPDXY PAINT SC SEALED CONCRETE ETR EXISTING TO REMAIN T TILING (CERAMIC /PORCELAIN /ETC.) 114. PROVIDE EXTERIOR TILE IN LOCATIONS AS INDICATED. Richmond Tampa P PAINT TC TRAFFIC COATING PL PLASTIC LAMINATE TWp TACKABLE WALL PANEL 115. PROVIDE BLACK BITUMOUS FIRE RETARDANT PAINT ON PLYWOOD. RB RESILIENT BASE WB WOOD BASE WC WALL COVERING 116. EDGES OF CARPET TILE SHALL BE FACTORY FINISHED. I G R E S H A M 117. REFER TO REFLECTED CEILING PLAN FOR REFERENCE POINTS FOR CARPET TILE INSTALLATION. SMITH A N D i 118. PROVIDE KOROSEAL 1/4" ALUMINUM "J" CAP EXTRUSION DIRECTLY BEHIND GLASS PARTITION. MOLDING _ - -- -- -- - --- -- - - -- TO PROVIDE CLEAN TRANSITION BETWEEN TWO WALLCOVERING FINISHES. - P A R T N E R S I ! I 119. ENTRANCE FLOOR GRILLE TO RUN WALL TO WALL IN WIDTH. FIELD DIMENSIONS SHALL BE 6030 Hollywood Blvd. COORDINATED WITH VENDOR FOR CUSTOM SIZES ADJACENT TO WALLS. FLOOR GRILLE ; Suite 210 SHALL NOT BE FIELD CUT. 14 -- -- ! Hollywood, Florida 33024 954.981.9100 120. ADD ALTERNATE #1: IN LIEU OF SPECIFIED WALLCOVERING, PROVIDE (P -1) PAINT AT CORRIDORS 131 & 132. 121. ADD ALTERNATE #2: IN LIEU OF SPECIFIED WALLCOVERING, PROVIDE (P -1) PAINT AT EXAMS 106,107 & 108. CERT. NO. I 122. ADD ALTERNATE #3: IN LIEU OF SPECIFIED WALLCOVERING, PROVIDE (P -1) PAINT AT ELEVATOR LOBBY 401 PL -1 Z -1 STAF GUNGE 104 A A P 0 0 0 0 3 4/C A 3 8 0 6 WOX7 I AND CORRIDORS 409 & 416. P -1 ! 1 5 OFFICE IB26000797/LC26000381 WB- I .. 125 P -3 T -2 104 - L - - WC -11 a� ! I WB -1 T -2 e - _ WC -11 V0 WBA I ' P -1 (P-3 T -2 120 P /QTZ -2 L� I - 101 T- /T -3 _ DOCTOR'S 104 11 127 J24 T -2 SLOPE SLOPE I � HSKP. ' I a TELECOM. I.T. P_1 123 EP -1 ! I I MECH. CORRIDOR ,y, M I� 129 130 128 WB -1 132 RB -1 �'� I 115 T -2 -' ' V � I� ELEC. T M 122 ' Q - I- o _ a I M No RAMP UPS - STORAGE WORK ROOM - P -1 0 i LL- - -- +- 119 120 CONFERENCE PL -1 /QTZ -1 II 4A 0� 164 M Q 1 PL -1 /QTZ -2 PL -1 /QTZ -1 121 P -1 WC-4 > MEME >M� 0 .J J .J J J I P -1 T -1/T -3 WC -14 p 1 WB -1 B- T -1 �; -� U Q W 1 t. �� i RB -1 - WB -1 w 1 T -2 i 4D C Lo �) SC -1 T -1 T -2 P -1 P -1 T -2 m T -2 WBA WB -1 LO T -2 T -2 --- PARKING - i X I I T -I N CH. P -1 P -1 P -1 105 MEN 118 120 P -1 f '" "" _ �= 'L''- li"R'�•ik� "1".rc�.c .E '`4 '`".9'r �T -10-t -- _______ _ _____________ __________ __ _ IS�aIR SH -1 - ---------------------------- - - - - -- - - - - -- ��� I CONSULT Y I c A -1 11 121 121 121 102 PL -1 /QTZ -1 NTROL 1 SEAL: Shauna Carpenter �= -�t -- _� -- -! ._� = -� - 1 EXAM EXAM EXAM 109 HOT 117 , F L I D -55r-t 5 1,. - _ - - LAB WC-4 , a 14 I FT l �', 107 108 I Co ��� i�� 116 �'1 P -1 m L L a ` N N ! t T -1 r, ° v> +� +�- 106 ,AC :1NON1EN CORRIDOR w a a s i LEVATO E C 103 120 WC-4 `� F., I I 12-1 I L 12;12 a1�r IC 13 I o w + + E» <» E» �» <» <;. - WBA 131 I � � Z L L CD LL LNi LMi LLi tai 2 `'�' ,164 PL -1 /QTZ 1 CONTROL c"rc!'w v vawwwww P -1 T -2 I iNOw L Ld0���� -- - -- WC-4 107 I I CL i* P 11) fO IEA ifi iA ; I WB_1 MT -1 .r "' s 101 WBA .r VAULT yl1'�OA' I - - WB -2 T -1 P -1 'TOIL ! q3 T -2 118 I! I I ° I j _ LOBBY 102 PL -1 �-� _SLOPE �• SLOPE o WB -1 CHANGt r - - -- t L A o 101 T ACC ;111; WC-3 .r 110 j W MEN'S 108 �.r .rr _ s- :.�::,L_� MT -1 GOWNED GOWNED BRACHY __ _ REVISION - 8 WAITING WAITING rrr r r - - - -� - 0 z. Z �= 106 C-2 0 3 114 .rr rr-r Lu - L . I1 <'' - r ILET/ - -- ,rr �"r o � No. - Date - �, _ 101 ! iC ANGIN 110 Revision C -- =� `� -- -- WAITING 3; i 4.1 E WB -1 1 J" art' I 14 i _. 104 ' w 119 102 P -1- PL -1 /QTZ -1 W B 1 T-1/T-3 (� .X r" t T -2 '.. r,. I P -2 I T -2 rrrrrrrrrrrr'.rrr'.rrrrrrs' r'rrrr ? -- -- -- - _ - �z m�i __ 14 --- - - - - -- __________ ---- - - - - -- - �_------ - - - - -- to �cm0q< l» ! I FIRST FLOOR I ' I INTERIOR DESIGN FINISH PLAN I i I� ', -- - - - - -- - -- �- _ -- - - - - -1 - - - ----- i- - - - - -- - - -I- - -- - -I- -- - - ---- I- - - - - -- ._-_-___ 1____________ T------------ �------------ I - - - - -- --------- I------------- � - - - -- ------- - - - -__ --_.-_____ T__._-------- r---______. I-__-- _1________1__---------- -i - - -- - - - - - -�- I I I INTERIOR DESIGN FINISH PLAN - 1ST FLOOR I I, 0 4' 8' 16' FILE: 9080D21A.dgn I I PROJECT: 29080.00 DATE: 7 12/14/2012 I Copyright 2012 Gresham, Smith and Partners. All Bights Reserved. I - -- -