13-96-161-
T
m
5
m
00
V.3
REINFORCED CONCRETE
WALL. SEE STRUCTURAL
>
C
.Y
0
3.
U
L.
v
4)
Q
STRUCTURAL DRAWINGS.
C-
CL
D
U
Q
� N M Q tf)
W zzzzz
J J J J J J
r-
0
ti
a
O
00
O U (D
+- }
C) > U U
00 W a 4A ry a)
O -1 413, 41 0 44 4A (A
U•- W --NM�T Ln
:EEu u-u -u-LL
N>- N W U U Q W W W W W
�NOLL L LfL==M =W
CL 4A 4A 40 Q Q 4A -% EH 4A 4A 4»
a�
yr
v
CL
CL
L�
/
C
m
CL
/
N �
L p
o +
O tq
N �
L
C-
L) C\j Mi —
v
CL
9 L O N, �C
V
= rZ�Ln;.4AVr�
J W
N \ p 0 j
4
v A7.3
r
I I
r r �
I '•I
' SMOOTH PAINTED STUCCO
FINISH AT EXTERIOR WALL
LEVAT I
Er, 2 L,
bo .
5
A7.3 r
U -r= —
fV
'I' I
L A OR i
1 I
T r
00 I
' STEEL CORNER GUARD.
+ SIM. DETAIL 3/A4.1
\�
I
0 -1" CLEAR SH i
ENLARGED ELEVATOR PLAN - SECOND & THIRD FLOORS
4 '
4
A7.3
'Z
3
z
u'f
5
00
V.3
REINFORCED CONCRETE
WALL. SEE STRUCTURAL
SEPARATOR BEAMS.
�1
COORDINATE WITH
Ln
ELEVATOR VENDOR. SEE
STRUCTURAL DRAWINGS.
-
Ln
00
U
3Y,
a
T.
4 '
4
A7.3
'Z
3
�rra..wwi
T
�1
II
Ln
3Y,
a
T.
N---
- - -
- --
—
;' '
(f)
II�
I
�i
0 2' 4' 8'
0
O
2 SIM.
A7.13
24 "L X 24 "W X 24 "D CONCRETE
SUMP PIT FOR ELEVATOR SHAFT.
REFER TO STRUCTURAL AND MEP
DRAWINGS FOR DETAILS
II 6' -1" CLEAR SHAFT
ENLARGED ELEVATOR PLAN - FIRST & FOURTH FLOORS
I. Y-711 .. 2'- . a.
I 6-1" CLEAR SHAM
I
ENLARGED PLAN ELEVAT
.l''� fV
1j. r< _I
0 2' 4' 8'
PIT LADDER. ONE
EACH SIDE.
SEPARATOR BEAMS. COORDINATE
WITH ELEVATOR VENDOR. SEE
STRUCTURAL DRAWINGS.
24 "L X 24 "W X 24 "D CONCRETE
SUMP PIT FOR ELEVATOR SHAFT.
REFER TO STRUCTURAL AND MEP
DRAWINGS FOR DETAILS
�I
I
I
OR PIT
0 2' 4' 8'
FINISHED ROOFING
AS SCHEDULED
TOP OF ELEV.
EL + 52' -9"
Ali
TOP OF ROOF_
EL. + 49' -2"
NEW ELEVATOR
SEE STRUCTURP
TOP OF FOUR'
EL + 35' -8"
TOP OF THIRE
-$�
EL. + 25'-0"
TOP OF SECOI
EL + 15' -0"
4 "X4" STRUCTUI
SEE STRUCTURE
REINFORCED a
SEE STRUCTURE
PIT LADDER. SE
SEPARATOR BE/
WITH ELEVATOI
STRUCTURAL DI
TOP OF FIR51
EL. 0' -0" - —
SELF ADHERING
LINE THE ENTIF
OF THE ELEVAT
TOP OF ELEV)
EL - 5' -0" —
WATERSTOP. SE
ELEVATOR SUMI
2
Al 71
SECTION - ELEVATOR SHAFT
0 2' IV 8'
3 2
qg,2 5 3 A3.21 CONCRETE RIB. SEE
STRUCTURAL
/ DRAWINGS
—oi
_ _ _
TOP OF ELEV. PENTHOUSE
EXTERIOR LOWER - - -- ::>R::" ;_ �: - ---- - - - - -- -- -- - - -- EL+5T -9"
SEE MEP DRAWINGS
O i
N I A:
- - - — - - —} TOP OF CANOPY
- - �! ---- - - - - -- T't EL +50' -0"
A3.23 j
TOP OF ROOF SLAB
CEILING AS
SCHEDULED
2
A7.13
ELEVATOR
LOBBY
401
SIM.1
A7.13
PARKING
THIRD FLOOR U
to
4
A7.13
PARKING
SECOND FLOOR U
2
C. LOBBY
101 u
T
1
FTYAN?
O1'
7
rt-
ELEVATOR
SHAFT
ELEVATOR
SHAFT
ELEVATOR
SHAFT
ELEVATOR
SHAFT
1
I
I
I
I
I
I
I
0
q
- — - — - — - — - — - — TOP OF FOURTH FLOOR SLAB @ OFFICE SPACE '
EL + 35' -8"
------ - - - - -_ TOP OF THIRD FLOOR SLAB
EL + 25' -0"
------ - - - - -- OL TOP OF SECOND FLOOR SLAB
EL + 15' -0"
=, r=--- - - =r-=
I I
r r
I I
r r
I I
i
1 1
r
SECTION - ELEVATOR SHAFT
TOP OF FIRST FLOOR SLAB
0 2' 4' 8'
Copyright 2012 Gresham, Smith and Partners, All Rights Reser:�ed.
s ..
.0 . ,
.s. a
Design Services
For The Built
Environment
■
Atlanta Birmingham
Cincinnati
Columbus Dallas
Fort Lauderdale
Knoxville Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
■
G R E S H A M
S M I TH AN D
P A R T N E R S
6030 Hollywood Blvd.
Suite 210
Hollywood, Florida 33024
954.981.9100
FIRM'S FLORIDA
CERT. NO.
AAP000034 /CA3806
IB26000797/1- C26000381
Al
t� aT
ru
"C3 w
N JO
Lo
CD Cc
Q
LO
O
SEAL: Kristin S. Herman -Druck
AR95172
1 r r`w
REVISION
No. — Date — Revision
ENLARGED PLAN &
SECTIONS AT ELEVATOR
A7.3
FILE: 9080A703.dgn
PROJECT: 29080.00
DATE: 12/14/2012
3
Q
T
Ln
3Y,
a
T.
N---
- - -
- --
—
;' '
(f)
,
Ar
CP
I. Y-711 .. 2'- . a.
I 6-1" CLEAR SHAM
I
ENLARGED PLAN ELEVAT
.l''� fV
1j. r< _I
0 2' 4' 8'
PIT LADDER. ONE
EACH SIDE.
SEPARATOR BEAMS. COORDINATE
WITH ELEVATOR VENDOR. SEE
STRUCTURAL DRAWINGS.
24 "L X 24 "W X 24 "D CONCRETE
SUMP PIT FOR ELEVATOR SHAFT.
REFER TO STRUCTURAL AND MEP
DRAWINGS FOR DETAILS
�I
I
I
OR PIT
0 2' 4' 8'
FINISHED ROOFING
AS SCHEDULED
TOP OF ELEV.
EL + 52' -9"
Ali
TOP OF ROOF_
EL. + 49' -2"
NEW ELEVATOR
SEE STRUCTURP
TOP OF FOUR'
EL + 35' -8"
TOP OF THIRE
-$�
EL. + 25'-0"
TOP OF SECOI
EL + 15' -0"
4 "X4" STRUCTUI
SEE STRUCTURE
REINFORCED a
SEE STRUCTURE
PIT LADDER. SE
SEPARATOR BE/
WITH ELEVATOI
STRUCTURAL DI
TOP OF FIR51
EL. 0' -0" - —
SELF ADHERING
LINE THE ENTIF
OF THE ELEVAT
TOP OF ELEV)
EL - 5' -0" —
WATERSTOP. SE
ELEVATOR SUMI
2
Al 71
SECTION - ELEVATOR SHAFT
0 2' IV 8'
3 2
qg,2 5 3 A3.21 CONCRETE RIB. SEE
STRUCTURAL
/ DRAWINGS
—oi
_ _ _
TOP OF ELEV. PENTHOUSE
EXTERIOR LOWER - - -- ::>R::" ;_ �: - ---- - - - - -- -- -- - - -- EL+5T -9"
SEE MEP DRAWINGS
O i
N I A:
- - - — - - —} TOP OF CANOPY
- - �! ---- - - - - -- T't EL +50' -0"
A3.23 j
TOP OF ROOF SLAB
CEILING AS
SCHEDULED
2
A7.13
ELEVATOR
LOBBY
401
SIM.1
A7.13
PARKING
THIRD FLOOR U
to
4
A7.13
PARKING
SECOND FLOOR U
2
C. LOBBY
101 u
T
1
FTYAN?
O1'
7
rt-
ELEVATOR
SHAFT
ELEVATOR
SHAFT
ELEVATOR
SHAFT
ELEVATOR
SHAFT
1
I
I
I
I
I
I
I
0
q
- — - — - — - — - — - — TOP OF FOURTH FLOOR SLAB @ OFFICE SPACE '
EL + 35' -8"
------ - - - - -_ TOP OF THIRD FLOOR SLAB
EL + 25' -0"
------ - - - - -- OL TOP OF SECOND FLOOR SLAB
EL + 15' -0"
=, r=--- - - =r-=
I I
r r
I I
r r
I I
i
1 1
r
SECTION - ELEVATOR SHAFT
TOP OF FIRST FLOOR SLAB
0 2' 4' 8'
Copyright 2012 Gresham, Smith and Partners, All Rights Reser:�ed.
s ..
.0 . ,
.s. a
Design Services
For The Built
Environment
■
Atlanta Birmingham
Cincinnati
Columbus Dallas
Fort Lauderdale
Knoxville Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
■
G R E S H A M
S M I TH AN D
P A R T N E R S
6030 Hollywood Blvd.
Suite 210
Hollywood, Florida 33024
954.981.9100
FIRM'S FLORIDA
CERT. NO.
AAP000034 /CA3806
IB26000797/1- C26000381
Al
t� aT
ru
"C3 w
N JO
Lo
CD Cc
Q
LO
O
SEAL: Kristin S. Herman -Druck
AR95172
1 r r`w
REVISION
No. — Date — Revision
ENLARGED PLAN &
SECTIONS AT ELEVATOR
A7.3
FILE: 9080A703.dgn
PROJECT: 29080.00
DATE: 12/14/2012