13-96 (2)-1461
1 1.1 (1.2 2 (2.1 3 5 (5.1 5.2 (6) 8 10
i .
�F-
--- - - - - -- - --
i
PARTIAL FOURTH FLOOR - ENLARGED POWER PLAN
SCALE: 1/4" = V -0"
Ot PROVIDE 1/20c. WITH PULLSTRINGS FOR
THERMOSTAT CONTROLS. COORDINATE WITH
MECHANICAL CONTRACTOR AND LOCATION WITH
ARCHITECTURAL ELEVATIONS.
O2 RUN CONDUITS TO BALCONY
INSIDE WALL/SLAB - NO EXPOSED CONDUITS.
Q COORDINATE EXACT LOCATION AND
REQUIREMENTS OF ABOVE CEILING WIFI
ROUTER WITH IT CONSULTANT.
Q COORDINATE EXACT LOCATION OF CEILING
MOUNTED SPEAKER WITH AUDIO CONSULTANT.
MUSIC SYSTEM TO SHUT DOWN UPON
ACTIVATION OF FIRE ALARM SYSTEM.
Q BATHROOM'S EXHAUST FAN TO BE CONNECTED
AND CONTROLLED TO BATHROOM'S LIGHTS
BRANCH CIRCUIT AND LIGHT SWITCH.
COORDINATE LOCATION OF LIGHT SWITCH WITH
ARCHITECTURAL ELEVATIONS.
O COORDINATE LAYOUT OF ELEVATOR EQUIPMENT
ROOM WITH ELEVATOR MANUFACTURER.
COORDINATE LOCATION OF ELECTRICAL
DISCONNECTS WITH ARCHITECTURAL ELEVATIONS
Q PROVIDE 1 /2 "C. WITH PULLSTRINGS FROM
SECURITY SBA¢ HEAD END
EQUIPMENT IN R ROOM 1282 ORDINATE ! END
WITH SECU 2
O AHU PROVIDED WITH BUILT -IN DISCONNECT
AND CONNECTED TO CU ON ROOF.
COORDINATE WITH MECHANICAL DRAWINGS /
CONTRACTOR.
O ROUTING OF 4 "C. WITH PULLSTRINGS FROM
1 ST FLOOR IT ROOM. NO 90 DEGREES BENDS.
10 0 CE 40 H - ND EQ IPME OR MU IC
OFFICE. 2 L
t 1 CARD READER TO BE IN 0 N ONLY
DURING AFTER HOURS AND DISENGAGED
DURING WORKING HOURS. COORDINATE WITH
SECURITY VENDOR.
AREA OF WORK
KEY PLAN
N.T.S.
0
Design Services
For The Built
Environment
■
Atlanta Birmingham
Cincinnati
Columbus Dallas
Fort Lauderdale
Knoxville Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
0
G R E S H A M
SMITH AND
P A R T N E R S
6030 Hollywood Blvd.
Suite 210
Hollywood, Florida 33024
954.981.9100
FIRM'S FLORIDA
CERT. NO.
AAP000034/CA3806
IB26000797/LC26000381
DELTA G CONSULTING
ENGINEERS. INC.
707 N.E. 3rd AVE.. SUTTE 200
FORT LAUDERDALE. FL. 33304
964) 627 -1112
CA#000me1
PJT. MGM 1QCHAEL H00
PROJECT #: 120717
REVISION
I No. - Date - Revision /21
02/01/13 Addendum #1
PARTIAL FOURTH
FLOOR ENLARGED
POWER PLAN
E3.4a
FILE:
PROJECT: 29080.00
DATE: 11/29/2012
r N
100
i
Y
• CC
ST
OF •;v.
LP
REVISION
I No. - Date - Revision /21
02/01/13 Addendum #1
PARTIAL FOURTH
FLOOR ENLARGED
POWER PLAN
E3.4a
FILE:
PROJECT: 29080.00
DATE: 11/29/2012