Loading...
13-96 (2)-1461 1 1.1 (1.2 2 (2.1 3 5 (5.1 5.2 (6) 8 10 i . �F- --- - - - - -- - -- i PARTIAL FOURTH FLOOR - ENLARGED POWER PLAN SCALE: 1/4" = V -0" Ot PROVIDE 1/20c. WITH PULLSTRINGS FOR THERMOSTAT CONTROLS. COORDINATE WITH MECHANICAL CONTRACTOR AND LOCATION WITH ARCHITECTURAL ELEVATIONS. O2 RUN CONDUITS TO BALCONY INSIDE WALL/SLAB - NO EXPOSED CONDUITS. Q COORDINATE EXACT LOCATION AND REQUIREMENTS OF ABOVE CEILING WIFI ROUTER WITH IT CONSULTANT. Q COORDINATE EXACT LOCATION OF CEILING MOUNTED SPEAKER WITH AUDIO CONSULTANT. MUSIC SYSTEM TO SHUT DOWN UPON ACTIVATION OF FIRE ALARM SYSTEM. Q BATHROOM'S EXHAUST FAN TO BE CONNECTED AND CONTROLLED TO BATHROOM'S LIGHTS BRANCH CIRCUIT AND LIGHT SWITCH. COORDINATE LOCATION OF LIGHT SWITCH WITH ARCHITECTURAL ELEVATIONS. O COORDINATE LAYOUT OF ELEVATOR EQUIPMENT ROOM WITH ELEVATOR MANUFACTURER. COORDINATE LOCATION OF ELECTRICAL DISCONNECTS WITH ARCHITECTURAL ELEVATIONS Q PROVIDE 1 /2 "C. WITH PULLSTRINGS FROM SECURITY SBA¢ HEAD END EQUIPMENT IN R ROOM 1282 ORDINATE ! END WITH SECU 2 O AHU PROVIDED WITH BUILT -IN DISCONNECT AND CONNECTED TO CU ON ROOF. COORDINATE WITH MECHANICAL DRAWINGS / CONTRACTOR. O ROUTING OF 4 "C. WITH PULLSTRINGS FROM 1 ST FLOOR IT ROOM. NO 90 DEGREES BENDS. 10 0 CE 40 H - ND EQ IPME OR MU IC OFFICE. 2 L t 1 CARD READER TO BE IN 0 N ONLY DURING AFTER HOURS AND DISENGAGED DURING WORKING HOURS. COORDINATE WITH SECURITY VENDOR. AREA OF WORK KEY PLAN N.T.S. 0 Design Services For The Built Environment ■ Atlanta Birmingham Cincinnati Columbus Dallas Fort Lauderdale Knoxville Jackson Jacksonville Louisville Memphis Nashville Richmond Tampa 0 G R E S H A M SMITH AND P A R T N E R S 6030 Hollywood Blvd. Suite 210 Hollywood, Florida 33024 954.981.9100 FIRM'S FLORIDA CERT. NO. AAP000034/CA3806 IB26000797/LC26000381 DELTA G CONSULTING ENGINEERS. INC. 707 N.E. 3rd AVE.. SUTTE 200 FORT LAUDERDALE. FL. 33304 964) 627 -1112 CA#000me1 PJT. MGM 1QCHAEL H00 PROJECT #: 120717 REVISION I No. - Date - Revision /21 02/01/13 Addendum #1 PARTIAL FOURTH FLOOR ENLARGED POWER PLAN E3.4a FILE: PROJECT: 29080.00 DATE: 11/29/2012 r N 100 i Y • CC ST OF •;v. LP REVISION I No. - Date - Revision /21 02/01/13 Addendum #1 PARTIAL FOURTH FLOOR ENLARGED POWER PLAN E3.4a FILE: PROJECT: 29080.00 DATE: 11/29/2012