13-96 (2)-130.........
1 A aka � ACsnx
r'
;
J 10
ol
WP
GE2
•
' -
RAMP UP RAMP UP
- - - - 7 -------------------- - - - - -- f
J J
- ---------------------
✓,
.................. .........: ' ...... ....- ................,.. .1... :._; .... . r"� ...... .............. ...
=r::
AHU -2 10$ :
.:1E19
SL -15
f' x��� ` � w 8 a MALI
0
a._
,
r, .
,
„
T
104
:,
- - � � EDP8
1E-1
,
I
' ,WP
ni vl
t
:
1 E -21
i .
i"
:
t
,
,
7 17
,
:
:
SPEAKERS IN EXAM ROOMS SHALL BE CONTROLLED VIA
THE CENTRAL AUDIO SYSTEM. PROVIDE A 1/2" EMPTY
CONDUIT Ff OM THE SPEAKER TO THE MEDIA EQUIPMENT
NPOMV 1 !1f`AT MIN TVDInAI CAD 2 CVA \I DAA \IQ
PARTIAL FIRST FLOOR -NEW CONSTRUCTION POWER
f
t;.-_._-'• ... .... ...... ------------ -f.....`- /- ...... °;..`- .._.__.__A- . -_::_- �..�.` - „-' -- -'° .....- .......
SCALE: 1/4” = V -0"
Z
0
Q
(Z
h—
Z
0
Ie
O
.0
fyi
W
t
LU
2
Cn
W
W
V)
Q RECEPTACLES IN ELEVATOR PIT. COORDINATE
EXACT LOCATION WITH ELEVATOR SUPPLIER
PRIOR TO ROUGH -IN.
0 PROVIDE CAMERA IN ELEVATOR CABINET.
COORDINATE WITH ELEVATOR SUPPLIER.
Q COORDINATE EXACT LOCATION AND
REQUIREMENTS OF ABOVE CEILING WIFI
ROUTER WITH IT CONSULTANT.
0 COORDINATE EXACT LOCATION OF CEILING
MOUNTED SPEAKER WITH AUDIO CONSULTANT.
MUSIC SYSTEM TO SHUT DOWN UPON
ACTIVATION OF FIRE ALARM SYSTEM.
O BATHROOM'S EXHAUST FAN TO BE CONNECTED
AND CONTROLLED BY BATHROOM'S LIGHTS
BRANCH CIRCUIT AND LIGHT SWITCH.
O GEF TO BE CONTROLLED BY GARAGE'S CO
SENSOR. COORDINATE WITH MECHANICAL
DRAWINGS.
0 COORDINATE LAYOUT OF IT ROOM WITH IT
CONSULTANT PRIOR TO ROUGH -IN OF
RECEPTACLES.
O AHU PROVIDE WITH BUILT -IN DISCONNECT.
COORDINATE WITH MECHANICAL CONTRACTOR.
O PROVIDE 1/2 "C. WITH PULLSTRINGS FOR
THERMOSTAT CONTROLS. COORDINATE WITH
MECHANICAL CONTRACTOR.
to PROVIDE 1/2 "C. WITH PULLSTRINGS FROM
SECURITY CAMERA BACK TO HEAD END
EQUIPMENT. COORDINATE WITH SECURITY
VENDOR.
tt SERVICE ENTRANCE RATED 800A MANUAL
ROTARY SWITCH WITH CAM LOCKS FOR
PORTABLE GENERATOR CONNECTION.
t2 TRUEBEAM EQUIPMENT MAIN CIRCUIT BREAKER
COORDINATE EXACT LOCATION WITH VARIAN
PRIOR TO INSTALLATION.
t3 EXIT LOOP SAW -CUT IN GROUND. PROVIDE
1/2" CONDUIT WITH PULLSTRINGS BACK TO
GATE OPERATOR. COORDINATE EXACT
LOCATION /REQUIREMENTS WITH GATE SUPPLIER.
14 VEHICLE LOOP DETECTOR. PROVIDE 1/2-
CONDUIT WITH PULLSTRINGS BACK TO GATE
OPERATOR. COORDINATE EXACT
LOCATION /REQUIREMENTS WITH GATE SUPPLIER.
t5 COORDINATE WITH MECHANICAL DRAWINGS AND
CONTRACTOR FOR CONTROLS OF MOTORIZED
DAMPER.
is J -BOX FOR DATA MOUNTED IN CEILING SPACE
FOR FUTURE USE. ROUTE 1" E.C. WITH
PULLSTRINGS BACK TO IT 128.
t� J -BOX FOR POWER MOUNTED IN CEILING
SPACE FOR FUTURE USE. ROUTE 1" E.C. WITH
PULLSTRINGS BACK TO ELEC. 122.
t8 COORDINATE ALL CONDUIT PENETRATIONS OF
VAULT AND BRACHY WITH VARIAN
REPRESENTATIVE.
t9 AHU PROVIDED WITH BUILT -IN DISCONNECT
AND CONNECTED TO CU ON ROOF.
COORDINATE WITH MECHANICAL DRAWINGS /
CONTRACTOR.
20 IEC 60309, 30A, 250V POWER INLET POWERED
BY ACCELERATOR CIRCUIT BREAKER PANEL.
REFER TO TRUEBEAM SITE DRAWINGS.
2t MOUNT RECEPTACLES AFF IN VAULT PER
TRUEBEAM SITE DRAWINGS.
Q IN -USE AND X -RAY IN USE WARNING LIGHTS
(CONTRACTOR FURNISHED AND INSTALLED) TO
RELAY JUNCTION BOX BY VARIAN.
23 DOOR SAFETY INTERLOCKS (CONTRACTOR
FURNISHED AND INSTALLED) TO RELAY
JUNCTION BOX BY VARIAN.
24 RELAY J -BOX (VARIAN FURNISHED,
CONTRACTOR INSTALLED). REFER TO TRUEBEAM
SITE DRAWINGS.
26 081 SYSTEM EMERGENCY SHUT OFF - VERIFY
EXACT LOCATION WITH SUPPLIER.
2s PROVIDE OUTLET AND OUTLET COVER TO BE
DARK BROWN IN COLOR. VERIFY MOUNTING
HEIGHT WITH ARCHITECTURAL ELEVATIONS.
AREA OF W ^D V
KEY PLAN
1 N.T.S.
i
Design Services
1 n
For The Built
Environment
0
Atlanta Birmingham
Cincinnati
Columbus Dallas
Fort Lauderdale
Knoxville Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
G R E S H A M
S M I T H A N D
P A R T N E R S
6030 Hollywood Blvd.
Suite 210
Hollywood. Florida 33024
954.981.9100
FIRM'S FLORIDA
CERT. NO.
AAP000034 /CA3806
IB26000797/LC26000381
707 N.E. 9rd AVE., SUITS 200
FORT LAUDERDAIE. FL 93304
964 627 -1112
RL 00009181
PJT. YOR: JaCHAEL KOO
PROJECT J: 120717
REVISION
No. - Date - Revision
PARTIAL FIRST FLOOR
NEW CONSTRUCTION
POWER PLAN
E3.1a
FILE:
PROJECT: 29080.00
DATE: 11/29/2012
W
LO 1_
o
d_r
m
No
�¢
\fir
°•
q
•
L'3
f r
t
a+ 0
U}
•�
v T F :
>,,
Add
,,,µ61o0
0
Cn Q
..
co
REVISION
No. - Date - Revision
PARTIAL FIRST FLOOR
NEW CONSTRUCTION
POWER PLAN
E3.1a
FILE:
PROJECT: 29080.00
DATE: 11/29/2012
W
LO 1_
o
No
°•
q
0
TA T
'••,
•�
v T F :
>,,
s
,,,µ61o0
L
U-jr
REVISION
No. - Date - Revision
PARTIAL FIRST FLOOR
NEW CONSTRUCTION
POWER PLAN
E3.1a
FILE:
PROJECT: 29080.00
DATE: 11/29/2012