13-96 (2)-129----------- - - ..........
KEYNOTES
pp
01 .2 ,' 7 12 1 (D RECEPTACLES IN ELEVATOR PIT. COORDINATE
EXACT LOCATION WITH ELEVATOR SUPPLIER
...... ... PRIOR TO ROUGH-IN.
.. . .... .. ..... .....
. ....... ........ . .......... .......... ----------- ...............
PROVIDE CAMERA IN ELEVATOR CABINET.
COORDINATE WITH ELEVATOR SUPPLIER.
COORDINATE EXACT LOCATION AND
REQUIREMENTS OF ABOVE CEILING WIFI
................. ..
------------------------ * ----------- ------------------- ----------- - -- -
. . .......... . ............... ............................... .. .......... ROUTER WITH IT CONSULTANT.
xkl
MI.
n �
M, COORDINATE EXACT LOCATION OF CEILING
0
WP MOUNTED SPEAKER WITH AUDIO CONSULTANT.
100,
MUSIC SYSTEM TO SHUT DOWN UPON
GE2
ACTIVATION OF FIRE ALARM SYSTEM.
BATHROOM'S EXHAUST FAN TO BE CONNECTED
AND CONTROLLED BY BATHROOM'S LIGHTS
-------------- BRANCH CIRCUIT AND LIGHT SWITCH.
I .....................
GEF TO BE CONTROLLED BY GARAGE'S CO
COORDINATE WITH MECHANICAL
..............
DRAWINGS.
COORDINATE LAYOUT OF IT ROOM WITH IT
CONSULTANT PRIOR TO ROUGH-IN OF
RECEPTACLES.
.......... . . .. .......... .... ... . . .................... ......... .. AHU PROVIDE WITH BUILT-IN DISCONNECT.
.............. ................... ...... ...................... ..............................
.. ..... ........... .... . .... . ....... . ............. ... .. .......
.......................................... ................. ............... ............... ................. ............... COORDINATE WITH MECHANICAL CONTRACTOR.
/\ : a - -- 14 T ,� i ._1 ' �`� I PROVIDE 1/2-C. WITH PULIJ19RIW.6,FOR
THERM-OS-TAT CO 66'ORMNATE H
. .....................
AWCAr 0
- -------------- - ----- ------ VRAC OR AND LOCATION WITH
CHI CTURAL ELEVATIONS.
PROVIDE 1, 2"C. ITH INGS FROM
-------------- ---------- SECURITY CAMERA BACK TO HEAD END
--------------------- EQUIPMENT. COORDINATE WITH SECURITY
VENDOR.
................... I ......
SERVICE ENTRANCE RATED 800A MANUAL
------------------
ROTARY SWITCH WITH CAM LOCKS FOR
SPEAKERS IN EXAM ROOMS SHALL BE CONTROLLED VIA
PORTABLE GENERATOR CONNECTION.
THE CENTRAL AUDIO SYSTEM. PROVIDE A 1/2- EMPTY
TRUEBEAM EQUIPMENT MAIN CIRC�U
�T BREAKERS.
CONDUIT FROM THE SPEAKER TO THE MEDIA EQUIPMENT
WP
COORDINATE EXACT
�H
(VERIFY LOCATION). TYPICAL FOR 3 EXAM R(10M�4,
IWAND LOCATION WITH
10
..........
ARCHITECTURAL ELEVATIONS.
.................. - - ---------------- ...................... - ----- ...... ... ........ ...... . .. ............ ... L ....... ............ .......... ............ ............ .... ...... ............. ............ ......
..... - - -------- - .............. N . ......... I. PROVIDE
.......... -------- ......... - - - ...... ...... . .......... .......... . ....... ......... .......... ..........
CONDUIT WITH PULLSTRINGS BACK TO
EXIT LO - T 0 51['
- — - ----------------------------------------- 1/2
27
----------------_--- ----------- -------------- .......... ...... GATE OPERATOR. COORDINATE EXACT
------ -----------
E AHU-2 --- - --- J.-
-------- -----
------------------ 10 .5 1
LOCATION /REQUIREMENTS WITH GATE SUPPLIER.
J;
TECTOR. PROVIDE 1/2-
-----------
N VEHICLE LOOP DE
-----------_- - -- ----------
..... ---------------- --------
A
L-26
loo� ......... . CONDUIT WITH PULLSTRINGS BACK TO GATE
SL -15
MALE OPERATOR. COORDINATE EXACT
EXAM
07 Q
%ap 1E- LOCATION/REQUIREMENTS WITH GATE SUPPLIER.
... .......... ........ . ......... .... ...... - .. ......... 7
----- . .....
--------------
1 4 COORDINATE WITH MECHANICAL DRAWINGS AND
GE '25 SID
T
4 16 8 f CONTRACTOR FOR CONTROLS OF MOTORIZED
LT 1 ................... .
DAMPER.
i L .............
1E-27
•
Z
..........
----- -------- -- --- ---------- ------------------ - ---------------- ----------------
U
-13
................ GE J-BOX FOR DATA MOUNTED IN CEILING SPACE
E-6
0
GE-27 1E:8� :1 E-1
FOR FUTURE USE. ROUTE 1" E.C. WITH
26 26
STAIR TO AHU-613
... ......... .... .....
19 /IGE-29 EXAM q_=
............ PULLSTRINGS BACK TO IT 128.
3
- --------- 6E-311
............ .. .. EXAM
-----------------------------------
............
----------- 10N ...... ....... 2X - W-ff J-BOX FOR POWER MOUNTED IN CELING
.............
.................... ----------- Z SPACE FOR FUTURE USE. ROUTE 1" E.C. WITH
------------------------------------ .7
..............................
• UP: Q
........ ... .... . .....
PULLSTRINGS BACK TO ELEC. 122.
N
GE-33j 19
%
@ COORDINATE ALL CONDUIT PENETRATIONS OF
Z
VAULT AND BRACHY WITH VARIAN
:3 L-J ----------------
WP ............. ........ ---------------------------------- 0 REPRESENTATIVE.
-------------------- ----
...... ...... . ...... . ..... ... ........ ....... .... L ------------- L ....................... --------------------------------------------------------------------- .........
. . .... .......... ........... ---------------------------------------------- ----------
----------------
ms:
.. .. .... ...... ------- -- .......... ........ AL U
----------------------- --- ----- 0,011MMAM OAHU PROVIDED WITH BUILT IN DISCONNECT
................................
. .................
GE 15 103 13� AND CONNECTED TO CU ON ROOF.
0 COORDINATE WITH MECHANICAL DRAWINGS
-------------------------------------------
GE 17
U_ CONTRACTOR.
EWC IEC 60309, 30A, 250V POWER INLET POWERED
BY ACCELERATOR CIRCUIT AN
fyi REFE T T LI
UKA INUbi.
O
EDP-16
LU 0 DI C ION WITH ARCHITECTURAL
IIE-9
•...................•.•...........
... . ... -----------
-------- ----
----------------
.......... ............... -. -. - -. -. -. I I— ........ -------------------------------- .. . ............................................
-------------------------- ----------------- ...... ................ .... . . .. . . ............. .................................. ....................... ..........................
............................
...... ... .......... .......... .. . ..... ..... . .. ......... ....... . . ...... ... . .. ....... ..................... ........................ ......................... ................... ......... .... MOUNT RECEPTACLES AFF IN VAULT PER
- - - --------------- --- ------ ......... .......... .......... .......... ... - .... ........ 3 - : ................... ............ ..................... .......... ................. .......... ..... ..................
.......... .......... ...... .........
LLI
..........
TRUEBEAM SITE DRAWINGS.
................ :EDP -6'
GE 23
pa @ IN-USE AND X-RAY IN USE WARNING LIGHTS
1E-2
.... . -------------
................... .......... .........................
(CONTRACTOR FURNISHED
------- LU
-------- ------- -
- ----------
0 VARIAN. COORDO INATE INATE
TO Lr) OCATION WITH ARCHITECTURAL ELEVATION.
LOBBY
E - CHA
lol
. . .... . ... .... ..
D L RACTOR
------------------------------
El FURNISHED AND INSTAL
--------------------------------
I ------------------- COORDIN
10E 1'
hl ------ --------- - - - - -- -- OCATION WITH ARCHITECTURAL E I N
2
1E-
-----------
TO
CONTRACTOR INSTA ED
OR ATE LOCATION WITH
GE-21
---------------- ---- - - _j 1 E-3 MC�,HIIL%.o�IUMAL �LLLV�AIIUN��.
*_"_\ . ..... . DEDICATED WEATHERPROOF, GFCI MALE GOWNED . . . ...... 0
: A. E
RECEPTACLES FOR WATER FEATURE. --- ------------- F VERIFY
WAITING
\ \\\\\\����� \� ���\� ,..?E EXACT LOCATION WITH SUPPLIER.
il E-39 1 :
PRIOR RI
EXACT EP
T
R
I
PROVIDE
COORDINATE
COORE
REQU
ROUTE
qC�kCAI
TL
-,x
e-, "AHU-2
VERIFY LOCATION OF RECEPTACLES TOILET /'
AND SWITCH BEFORE ROUGH IN. CHANGING EF-3 DE OUTL AND OU
•DARK I IN ATE L CATIO
112
GE-19 WITH ARCHITECTURAL ELEVATIONS.
- ---------- ..............................
..............................
------------------------------ ---------------------- --------------------------------------------------------- - ---- - --- --- WAITING ------- ----- - --- ----------- --------- 10 • -- --------- - -------- ---- --------------------------- @ REMOTE GATE CONTROL - CONNECT TO GATE
Gt-
F in?7 CONTROL PANEL.
PARTIAL FIRST FLOOR -NEW CONSTRUCTION POWER
JLA=; i/'f - = 1--U--
AREA OF lAinr)V
KEY PLAN
1 N.T.S.
— --------------------- ----------------
a
Design Services
For The Built
Environment
N
Atlanta Birmingham
Cincinnati
Columbus Dallas
Fort Lauderdale
Knoxville Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
F-1
G R E S H A M
S M I T H A N D
P A R T N E R S
6030 Hollywood Blvd.
Suite 210
Hollywood, Florida 33024
954.981.9100
FIRM'S FLORIDA
CERT. NO.
AAP000034/CA3806
1B26000797/LC26000381
DELTA G CONSULTING
ENGINEERS, INC.
N.E. 3rd AVE., SUM 200
FORT LLUDERDAIX, FL 33304
527-1112
CA#00009181
PJT. XGR. WCHAEL HOO
PROJECT J: 120717
0
-PXC*Z *WAN. P.X.
DATE-"'
REVISION
No. Date Revision
02/01/13 Addendum #1
..........
..................... ...............................
............ ................................. -------------------------------------------------------
.................... .................................... .......................................................
.................... ................................. .......................................................
- - - - - - - - - - - - - - - - - - - i - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- ----- -- -- -- --------- -- -----
PARTIAL FIRST FLOOR
NEW CONSTRUCTION
POWER PLAN
E3.1a
FILE:
PROJECT: 29080.00
DATE: 11/29/2012