13-96 (2)-085MDFR
DO NOT INSTALL 01;0.8Pj`TN1<I,ERS
PERT_ HIS �P��?/''- 'Q-I� FIRE PROTECTION
CONTRACTOR'S WORKING PLANS SHALL BE
SUBMITTED FOR APPROVAL TO
MIAMI DYDTE oIS (INSTALLED OR REMODELED.
ANY
KEY NOTES
0 4" STANDPIPE WITH 2 -1/2" HOSE CONNECTION AND 2" DRAIN RISER.
O SUPERVISED FLOOR CONTROL VALVE, SEE DETAIL ON SHEET FP1.1.
Q C STANDPIPE WITH 2 -1/2" HOSE CONNECTION.
Q EXPOSED FIRE SPRINKLER LINE (GALVANIZED).
THIRD FLOOR PLAN - NEW CONSTRUCTION FIRE SPRINKLER
SCALE: 1/8" = V -0"
ji
i
U S & r
.....................................................................................
Design Services
For The Built
Environment
■
Atlanta Birmingham
Cincinnati
Columbus Dallas
Fort Lauderdale
Knoxville Jackson
Jacksonville Louisville
Memphis Nashville
Richmond Tampa
0
G R E S H A M
SMITH AND
P A R T N E R S
6030 Hollywood Blvd.
Suite 210
Hollywood, Florida 33024
9 54.9 81.9100
FIRM'S FLORIDA
CERT. NO.
AAP000034/CA3806
IB26000797/LC26000381
DELTA G CONSULTING
ENGINEERS, INC.
707 N.E. 3rd AVE.. SUITE 200
FORT LAUDERDALE, FL. 33304
964) 527-1112
CA#00009181
P]T. YOR: laaff 6 H00
PROJECT #: 120717
L-Li O
V4 E
.• C? �� Np 6 .••� Cfr.-
•w
• OF
P� Q.
E
REVISION
02/01/13 = Addendum #1 V 2 N
THIRD FLOOR PLAN
NEW CONSTRUCTION
FIRE SPRINKLER PLAN
FP2m3
FILE:
PROJECT: 29080.00
DATE: 11129/2012