Loading...
13-96 (2)-0827 77/ • 111 j ! ?• // / / //d /r' : `.i'•r: •:•' /X, - --------- ----­------------ ST LO _d ------ OFFICE - - - - -- - - - - - - - ------- --- AF .F MR R ......... -2 ---------- ............. ......... — ......... i! P. . .............. ............................. ----- --------- ------ go ... ................ .............. ......... - -------- . ... ................ --------------- ------ ED N ------------ - 71'1 /7 /* r / ; if � �r 4- FIRE RISER W/ SUPERVISE 1 60 W1 � DR j./ VALVE, FLOW SWITCH AND IN. LINT ROUTE 4" FIRE LINE ABOVE FLOOR"., TO RISER. COORDINATE RISER ' EXACT LOCATION WITH MECHA ICAL DUCTS TO AVOID CONFLICTS. 4" FIRE LINE UP TO ABOVE GRADE AND THEN PENETRATE l''• BUILDING WALL 4" FIRE LINE TO DDCV & FDC. REFER TO CIVIL �% / ENGINEER DRAWINGS FOR CONTINUATION.—-- .............. / ... ..... .... ... ...... -------------- . ........ . 144m I . ........ ....... _\� ......... ---- ----- ..... ------ .. .... ­7 r11 1,01 1013BY --------- .. ........ ....... ij i ........... ......... .. ------------------------- 101 ........... .. - -_--_------- P --- -- ---- --- MALELi' .. ........ ... 4 ------------------- ------ GOW t FElMAII.GOWNEEI)t ft o -------------- A�MNI ... ..... .4 % . .... .......... N� X : (Y-1 i IDILET/ ­- ----- 113 ..,C.HANrqING1 --------- I ---------------- ... --------------------------- ------ --------- - -------- - — ------- ---------------------- ------- X. -------------- - . i * 0 1 -'2+--y --- j ----------------- Al ------ --------- - ------------- q --- ----­----- ------------- --------- - -- ----------------- �4 --- 4 ................ ............ X X ---------------------- ------ I ---- ... . ........ ... 9, X X A . . ...... .. 9 7� j; ..... ----- .................... 1 ----------- _--------------- I ------------- x., ........... ------------- -----­----------- ------------------- .......... ----------- - - -------- - -------- - - ----- ------------ ------------ ------- ---- --- ....... . ------------- .. .. . ........ . ------------------------ --- ------------ ------­--- ---------- ------------- ------- -------- .... .... .. . .......... ...... ...... . ... . .... ------ ----------------------------------------------------------------- .. ............. ............ . ................... = -­---------------- --------- -- ------------ ........... ........... ............ ............. ............ ............. ...... ----- ... .. .............. ............. . ..... ........... . ...... ---- _77 77 7 ------------- 17 1771' 7777 7 7' 7"*** 7 7 ----- 7 7" 7 7 7' NN -----­---------- 7 .. ...... .... 7z "WIN J ; 1 .11 .. I j-% : ; - . - I - X. : : :1 ov ------------- 4%� I L j: j A 27 1 --------- 4-1 30 R . . ...... ......... ---------------- (104'-0 Ll; ----- ;: :-; : :- - -- -------- I ------ - - ----- --------- r$ X, UP: ................. . ........................ _A. 4 ........... . .................... ... ....... ­ : I — .... - - --- ----- - -- . . .. ......... --- ---- --- ------ ....... :14 go I ........... JR ------ - -------- =MALE; ------ C -------------------- -- iW V_ ........... 10 - ------------------_-------- ------ -4 - -- - --- - -------- . .. . .............. . / 7. r ./ .. / _7 /XV// /Z -_-_--_---- r / / -4 11 ,L_1 tr . . -- ---------------------------------- - ---- ------------------------------------------------ ----------------------------- -- ----------------------------- -- ------------------------------------------- - -------------------­--­-- ­---­--------------------- ------------­ .... --- . ... ............. ......... .............. ......... ..... --------------------------------------- - .......... 1- - -------------------- ....................... . ....... - -.-.-.- .... t � ... . ­ . 9 .. .....--..--..- ------------------ - ----------------------------------------------­---­---- -! ---------------------- ----------------------------------- --------- 14 8 1­1 . - .......... .............. . ......... Z . ... .... .. ----------------------------------------------------- ---------------------- --------_----------- ----­---------­------------- --- ----------------------------- ........................ L ------------------- ----------------------------------------------------------- ................... ..... ......... ................. ------------------------------------------ - ----------------------- - ------------ - --------------- ... ....... .......... ............ ...... ............................. - - — --- - ------------------------------- 141 1'18)i 19, 2") KEY NOTES 4= STANDPIPE AND 2" DRAIN RISER UP. NEW SUPERVISED FLOOR CONTROL VALVE, SEE DETAIL ON SHEET FP1.1. O NEW 2-1/2" HOSE CONNECTION. O CONNECT NEW 2" DRAIN LINE TO STORM DRAIN UNE. PROVIDE S.O.V. AND CHECK VALVE. SEE SHEET P2.2 FOR CONTINUATION. 4" STANDPIPE UP. (DSIDEWALL SPRINKLER AT ELEVATOR HOISTWAY NOT MORE THAN 2 FT ABOVE THE FLOOR OF THE PIT. O NEW 1-1/2n FIRE SPRINKLER LINE TO LANDSCAPE EQUIPMENT ROOM. PROVIDE FIRE SPRINKLERS AS REQUIRED PER NFPA 13 (ORDINARY HAZARD). PROVIDE SPRINKLER GUARDS. NEW FIRE SPRINKLER LINE ABOVE CEILING (TYPICAL) NEW GALVANIZED EXPOSED FIRE SPRINKLER UNE (TYPICAL). FIRST FLOOR PLAN -NEW CONSTRUCTION FIRE SPRINKLER SCALE: 1/8" = V-0" I r. • • • ------ --- - - - 0 Design Services For The Built Environment E Atlanta Birmingham Cincinnati Columbus Dallas Fort Lauderdale Knoxville Jackson Jacksonville Louisville Memphis Nashville Richmond Tampa 0 G R E S H A M S M I T H A N D P A R T N E R S 6030 Hollywood Blvd. Suite 210 Hollywood, Florida 33024 9 54.981.9100 FIRM'S FLORIDA CERT. NO, AAP000034/CA3806 IB26000797/LC26000381 707 N.E. 3rd AVE., SUITE 2W FORT IAUDERDAIX, FL. 33304 L (954) 527-1112 RL CA#000091e1 PJT. NCR WCHAEL HOO PROJECT J: 120717 IRMW aim U) -I- LO x :D Uj 0 in ,,,a S­Njr",I> e N 8 0 Cc w lo TEA OQ,•:\� '" % 4! #"100 8 RECESSED PENDENT SPRINKLERS INSTALLED ON RETURN BENDS (TYPICAL)PER NFPA 13 SECT. 7.3.2.5(3). PREACTION SYSTEM BRANCH LINES SHALL BE PITCHED AT LEAST 1/2- PER 10 FT. AND MAINS SHALL BE PITCHED AT LEAST 1/4- PER 10 FT. TO DRAIN PER NFPA 13 SECT. 8.16.2.3.2. DOUBLE INTERLOCK PREACTION SYSTEM VALVE CABINET VICTAULIC SERIES 745 FIRELOCK FIRE—PAC PART #SP0207457ABIB11 WITH PNEUMATIC/ELECTRICAL RELEASE. SIZE: 2". ELECTRICAL CONTRACTOR SHALL CONNECT TAMPER & FLOW SWITCHES TO FIRE ALARM PANEL AND SMOKE/HEAT DETECTORS TO PREACTION SYSTEM CABINET ELECTRIC RELEASE PANEL @ DRAIN LINE TO DISCHARGE OVER FUNNEL TYPE FLOOR DRAIN. PROVIDE 2" AIR GAP. REFER TO PLUMBING DRAWINGS FOR MORE INFORMATION. G PREACTION SYSTEM SHALL BE PROVIDED WITH INTERNALLY GALVANIZED STEEL PIPE. NONGALVANIZED FITTINGS SHALL BE PERMITTED. 8 CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF THE RADIATION SHIELDING PENETREATION WITH THE EQUIPMENT VENDOR/ARCHITECT PRIOR TO INSTALLATION. S SECTIONAL VALVE ABOVE CEILING. - VJ (0 1— REVISION No. — Date Revision ........... ........................................... .................. ............. ... • .................... ............. .................. ....................................................... • ................... ------- ------------------- ............................. .................... •........ . ........................ -------------------------------------------------------- ------------------- - ------------------------------- ------------------------------------------- FIRST FLOOR PLAN NEW CONSTRUCTION FIRE SPRINKLER PLAN FP2.1 FILE: PROJECT: 29080.00 DATE: 11129/2012 rG 7-77— T'- 777 77 - P. /7 77 777 71 7-7-7 ........................... X. /* ; 1 .11 .. I j-% : ; - . - I - X. : : :1 ov ------------- 4%� I L j: j A 27 1 --------- 4-1 30 R . . ...... ......... ---------------- (104'-0 Ll; ----- ;: :-; : :- - -- -------- I ------ - - ----- --------- r$ X, UP: ................. . ........................ _A. 4 ........... . .................... ... ....... ­ : I — .... - - --- ----- - -- . . .. ......... --- ---- --- ------ ....... :14 go I ........... JR ------ - -------- =MALE; ------ C -------------------- -- iW V_ ........... 10 - ------------------_-------- ------ -4 - -- - --- - -------- . .. . .............. . / 7. r ./ .. / _7 /XV// /Z -_-_--_---- r / / -4 11 ,L_1 tr . . -- ---------------------------------- - ---- ------------------------------------------------ ----------------------------- -- ----------------------------- -- ------------------------------------------- - -------------------­--­-- ­---­--------------------- ------------­ .... --- . ... ............. ......... .............. ......... ..... --------------------------------------- - .......... 1- - -------------------- ....................... . ....... - -.-.-.- .... t � ... . ­ . 9 .. .....--..--..- ------------------ - ----------------------------------------------­---­---- -! ---------------------- ----------------------------------- --------- 14 8 1­1 . - .......... .............. . ......... Z . ... .... .. ----------------------------------------------------- ---------------------- --------_----------- ----­---------­------------- --- ----------------------------- ........................ L ------------------- ----------------------------------------------------------- ................... ..... ......... ................. ------------------------------------------ - ----------------------- - ------------ - --------------- ... ....... .......... ............ ...... ............................. - - — --- - ------------------------------- 141 1'18)i 19, 2") KEY NOTES 4= STANDPIPE AND 2" DRAIN RISER UP. NEW SUPERVISED FLOOR CONTROL VALVE, SEE DETAIL ON SHEET FP1.1. O NEW 2-1/2" HOSE CONNECTION. O CONNECT NEW 2" DRAIN LINE TO STORM DRAIN UNE. PROVIDE S.O.V. AND CHECK VALVE. SEE SHEET P2.2 FOR CONTINUATION. 4" STANDPIPE UP. (DSIDEWALL SPRINKLER AT ELEVATOR HOISTWAY NOT MORE THAN 2 FT ABOVE THE FLOOR OF THE PIT. O NEW 1-1/2n FIRE SPRINKLER LINE TO LANDSCAPE EQUIPMENT ROOM. PROVIDE FIRE SPRINKLERS AS REQUIRED PER NFPA 13 (ORDINARY HAZARD). PROVIDE SPRINKLER GUARDS. NEW FIRE SPRINKLER LINE ABOVE CEILING (TYPICAL) NEW GALVANIZED EXPOSED FIRE SPRINKLER UNE (TYPICAL). FIRST FLOOR PLAN -NEW CONSTRUCTION FIRE SPRINKLER SCALE: 1/8" = V-0" I r. • • • ------ --- - - - 0 Design Services For The Built Environment E Atlanta Birmingham Cincinnati Columbus Dallas Fort Lauderdale Knoxville Jackson Jacksonville Louisville Memphis Nashville Richmond Tampa 0 G R E S H A M S M I T H A N D P A R T N E R S 6030 Hollywood Blvd. Suite 210 Hollywood, Florida 33024 9 54.981.9100 FIRM'S FLORIDA CERT. NO, AAP000034/CA3806 IB26000797/LC26000381 707 N.E. 3rd AVE., SUITE 2W FORT IAUDERDAIX, FL. 33304 L (954) 527-1112 RL CA#000091e1 PJT. NCR WCHAEL HOO PROJECT J: 120717 IRMW aim U) -I- LO x :D Uj 0 in ,,,a S­Njr",I> e N 8 0 Cc w lo TEA OQ,•:\� '" % 4! #"100 8 RECESSED PENDENT SPRINKLERS INSTALLED ON RETURN BENDS (TYPICAL)PER NFPA 13 SECT. 7.3.2.5(3). PREACTION SYSTEM BRANCH LINES SHALL BE PITCHED AT LEAST 1/2- PER 10 FT. AND MAINS SHALL BE PITCHED AT LEAST 1/4- PER 10 FT. TO DRAIN PER NFPA 13 SECT. 8.16.2.3.2. DOUBLE INTERLOCK PREACTION SYSTEM VALVE CABINET VICTAULIC SERIES 745 FIRELOCK FIRE—PAC PART #SP0207457ABIB11 WITH PNEUMATIC/ELECTRICAL RELEASE. SIZE: 2". ELECTRICAL CONTRACTOR SHALL CONNECT TAMPER & FLOW SWITCHES TO FIRE ALARM PANEL AND SMOKE/HEAT DETECTORS TO PREACTION SYSTEM CABINET ELECTRIC RELEASE PANEL @ DRAIN LINE TO DISCHARGE OVER FUNNEL TYPE FLOOR DRAIN. PROVIDE 2" AIR GAP. REFER TO PLUMBING DRAWINGS FOR MORE INFORMATION. G PREACTION SYSTEM SHALL BE PROVIDED WITH INTERNALLY GALVANIZED STEEL PIPE. NONGALVANIZED FITTINGS SHALL BE PERMITTED. 8 CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF THE RADIATION SHIELDING PENETREATION WITH THE EQUIPMENT VENDOR/ARCHITECT PRIOR TO INSTALLATION. S SECTIONAL VALVE ABOVE CEILING. - VJ (0 1— REVISION No. — Date Revision ........... ........................................... .................. ............. ... • .................... ............. .................. ....................................................... • ................... ------- ------------------- ............................. .................... •........ . ........................ -------------------------------------------------------- ------------------- - ------------------------------- ------------------------------------------- FIRST FLOOR PLAN NEW CONSTRUCTION FIRE SPRINKLER PLAN FP2.1 FILE: PROJECT: 29080.00 DATE: 11129/2012 rG ........................... i. /* /A A /XV// /Z -_-_--_---- r / / -4 11 ,L_1 tr . . -- ---------------------------------- - ---- ------------------------------------------------ ----------------------------- -- ----------------------------- -- ------------------------------------------- - -------------------­--­-- ­---­--------------------- ------------­ .... --- . ... ............. ......... .............. ......... ..... --------------------------------------- - .......... 1- - -------------------- ....................... . ....... - -.-.-.- .... t � ... . ­ . 9 .. .....--..--..- ------------------ - ----------------------------------------------­---­---- -! ---------------------- ----------------------------------- --------- 14 8 1­1 . - .......... .............. . ......... Z . ... .... .. ----------------------------------------------------- ---------------------- --------_----------- ----­---------­------------- --- ----------------------------- ........................ L ------------------- ----------------------------------------------------------- ................... ..... ......... ................. ------------------------------------------ - ----------------------- - ------------ - --------------- ... ....... .......... ............ ...... ............................. - - — --- - ------------------------------- 141 1'18)i 19, 2") KEY NOTES 4= STANDPIPE AND 2" DRAIN RISER UP. NEW SUPERVISED FLOOR CONTROL VALVE, SEE DETAIL ON SHEET FP1.1. O NEW 2-1/2" HOSE CONNECTION. O CONNECT NEW 2" DRAIN LINE TO STORM DRAIN UNE. PROVIDE S.O.V. AND CHECK VALVE. SEE SHEET P2.2 FOR CONTINUATION. 4" STANDPIPE UP. (DSIDEWALL SPRINKLER AT ELEVATOR HOISTWAY NOT MORE THAN 2 FT ABOVE THE FLOOR OF THE PIT. O NEW 1-1/2n FIRE SPRINKLER LINE TO LANDSCAPE EQUIPMENT ROOM. PROVIDE FIRE SPRINKLERS AS REQUIRED PER NFPA 13 (ORDINARY HAZARD). PROVIDE SPRINKLER GUARDS. NEW FIRE SPRINKLER LINE ABOVE CEILING (TYPICAL) NEW GALVANIZED EXPOSED FIRE SPRINKLER UNE (TYPICAL). FIRST FLOOR PLAN -NEW CONSTRUCTION FIRE SPRINKLER SCALE: 1/8" = V-0" I r. • • • ------ --- - - - 0 Design Services For The Built Environment E Atlanta Birmingham Cincinnati Columbus Dallas Fort Lauderdale Knoxville Jackson Jacksonville Louisville Memphis Nashville Richmond Tampa 0 G R E S H A M S M I T H A N D P A R T N E R S 6030 Hollywood Blvd. Suite 210 Hollywood, Florida 33024 9 54.981.9100 FIRM'S FLORIDA CERT. NO, AAP000034/CA3806 IB26000797/LC26000381 707 N.E. 3rd AVE., SUITE 2W FORT IAUDERDAIX, FL. 33304 L (954) 527-1112 RL CA#000091e1 PJT. NCR WCHAEL HOO PROJECT J: 120717 IRMW aim U) -I- LO x :D Uj 0 in ,,,a S­Njr",I> e N 8 0 Cc w lo TEA OQ,•:\� '" % 4! #"100 8 RECESSED PENDENT SPRINKLERS INSTALLED ON RETURN BENDS (TYPICAL)PER NFPA 13 SECT. 7.3.2.5(3). PREACTION SYSTEM BRANCH LINES SHALL BE PITCHED AT LEAST 1/2- PER 10 FT. AND MAINS SHALL BE PITCHED AT LEAST 1/4- PER 10 FT. TO DRAIN PER NFPA 13 SECT. 8.16.2.3.2. DOUBLE INTERLOCK PREACTION SYSTEM VALVE CABINET VICTAULIC SERIES 745 FIRELOCK FIRE—PAC PART #SP0207457ABIB11 WITH PNEUMATIC/ELECTRICAL RELEASE. SIZE: 2". ELECTRICAL CONTRACTOR SHALL CONNECT TAMPER & FLOW SWITCHES TO FIRE ALARM PANEL AND SMOKE/HEAT DETECTORS TO PREACTION SYSTEM CABINET ELECTRIC RELEASE PANEL @ DRAIN LINE TO DISCHARGE OVER FUNNEL TYPE FLOOR DRAIN. PROVIDE 2" AIR GAP. REFER TO PLUMBING DRAWINGS FOR MORE INFORMATION. G PREACTION SYSTEM SHALL BE PROVIDED WITH INTERNALLY GALVANIZED STEEL PIPE. NONGALVANIZED FITTINGS SHALL BE PERMITTED. 8 CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF THE RADIATION SHIELDING PENETREATION WITH THE EQUIPMENT VENDOR/ARCHITECT PRIOR TO INSTALLATION. S SECTIONAL VALVE ABOVE CEILING. - VJ (0 1— REVISION No. — Date Revision ........... ........................................... .................. ............. ... • .................... ............. .................. ....................................................... • ................... ------- ------------------- ............................. .................... •........ . ........................ -------------------------------------------------------- ------------------- - ------------------------------- ------------------------------------------- FIRST FLOOR PLAN NEW CONSTRUCTION FIRE SPRINKLER PLAN FP2.1 FILE: PROJECT: 29080.00 DATE: 11129/2012 8 RECESSED PENDENT SPRINKLERS INSTALLED ON RETURN BENDS (TYPICAL)PER NFPA 13 SECT. 7.3.2.5(3). PREACTION SYSTEM BRANCH LINES SHALL BE PITCHED AT LEAST 1/2- PER 10 FT. AND MAINS SHALL BE PITCHED AT LEAST 1/4- PER 10 FT. TO DRAIN PER NFPA 13 SECT. 8.16.2.3.2. DOUBLE INTERLOCK PREACTION SYSTEM VALVE CABINET VICTAULIC SERIES 745 FIRELOCK FIRE—PAC PART #SP0207457ABIB11 WITH PNEUMATIC/ELECTRICAL RELEASE. SIZE: 2". ELECTRICAL CONTRACTOR SHALL CONNECT TAMPER & FLOW SWITCHES TO FIRE ALARM PANEL AND SMOKE/HEAT DETECTORS TO PREACTION SYSTEM CABINET ELECTRIC RELEASE PANEL @ DRAIN LINE TO DISCHARGE OVER FUNNEL TYPE FLOOR DRAIN. PROVIDE 2" AIR GAP. REFER TO PLUMBING DRAWINGS FOR MORE INFORMATION. G PREACTION SYSTEM SHALL BE PROVIDED WITH INTERNALLY GALVANIZED STEEL PIPE. NONGALVANIZED FITTINGS SHALL BE PERMITTED. 8 CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF THE RADIATION SHIELDING PENETREATION WITH THE EQUIPMENT VENDOR/ARCHITECT PRIOR TO INSTALLATION. S SECTIONAL VALVE ABOVE CEILING. - VJ (0 1— REVISION No. — Date Revision ........... ........................................... .................. ............. ... • .................... ............. .................. ....................................................... • ................... ------- ------------------- ............................. .................... •........ . ........................ -------------------------------------------------------- ------------------- - ------------------------------- ------------------------------------------- FIRST FLOOR PLAN NEW CONSTRUCTION FIRE SPRINKLER PLAN FP2.1 FILE: PROJECT: 29080.00 DATE: 11129/2012 FIRST FLOOR PLAN NEW CONSTRUCTION FIRE SPRINKLER PLAN FP2.1 FILE: PROJECT: 29080.00 DATE: 11129/2012