Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13-96 (2)-053
f , s7 fl }t� li !j l� i t� f .i I� I� I; t{ I I� s� fi ii tl it S� iJ i� ;i C� 1 t� fi 11 , ,i �i ,. t i� i1 L C M SLOPE STAIR A -1 2 SD -RAMP P UP ,007 SF) y� 8-SD (6,539 SF) 6-SD (3,265 SF) - - - -a M E - -- - -� - 1 7MT _,o 6 EXAM 1=j LL EXAM 107 106 ICD I 5 FE ALE 1): �3 0 6 N LOBBY — — — - - ---- 101 5 MALE GO ED T - WAITING 7 2 110 10-SD (9, 04 SF)----2 u AITING S[>--\ 102 8 7 A "A 3 "S 6 "SD (2,70 ) 3" � (5 4"0 0 N 3 "SD ----� 2C WAY 2C WAY 2 1 10 "SD (12,569 SF STAFF LOUN6 126 OFFICE 125 ffx DOCTOR'S OFFICE ( 127 STAF 'TOILET I f24 I W-1 MECH. -- - -- 129 , _ i o TELECOM. I AN. 1I I i j I I I I EWH-1 130 128 I I I ( I I ( I 3 I.T. AHU -1 LANDSCAPE EQUIP. ELEC. 122 STOR. S WORK ROOM CONFERENCE 120 19 121 }i -- I I I I I I - - - -_ -- - - - - -- I --- r - - - -� -- - - - --- CONSULT I 109 1 1 /4 "CD 1 1/4" D I CONTROL EXAM HOT 117 108 LAB o 116 I 1 1 'C/ 4 "CD .�K rl 2 "CD I _T CONTROL - - -- 2 "CD 115 1 "CD I 1 1 /4 "CD LINE U/G 19 C AN ING I VAULT 111: I FEMALE $ 8 118 _ I 1 "CD — �� NED BR ACHY 13 F81 i Y) 113 13 13 0 TOILET/ I HU -3 ANGING — — — — AHU-4A AHU-4B Jill L_j ----------------- - - - - -- - - - - - 2 "CD CONTRACTOR TO PROVIDE & VENDOR TO INSTALL ALL g EQUIPMENT & PIPING WITHIN I I VAULT AND BRACHY ROOMS. FIRST FLOOR PLAN - NEW CONSTRUCTION SANITARY PLAN SCALE: 1/8" = V -0" 2C WAY \4 IF WAY _S SLOPE w a_ 0 J 14 4-SD (1,200 4 "GD (1,200 SI �3S416 SF) �n 4 "SD 2 WA FCO SD — 6-SD (3,576 S 0 N 8 "SD (3,576 SF) I ; SLOPE Li o_ 0 _J PARKING � 8 "SD (4,776 SF) N 0 V) 0 8-SD (8,192 SF) Li D_ of 4 14 F � 3" = -a S 4 "GD oo (950 SF) o 10" D 0 ( 42 SF) J V N 1 2 1 i SD 16 2-WAY "SD ( �0 ,02f _J 1 "SD (15,168 3 FH O B -1 2 DRAWING KEYED NOTES: O 4" SANITARY LINE BELOW GRADE. Q 24 "X24 "X24" ELEVATOR SUMP PIT. 11 ELECTRIC ELEVATOR, (NO HYDRAULIC 16 NOTE: PROVIDE IMPACT PROTECTION FOR REFER TO CIVIL ENGINEER SEE ARCHITECTURAL DWG'S FOR DETAILS OIL IS IN USE). SEE ARCHITECTURAL VERTICAL PLUMBING PIPES. SEE ARCHIT. DRAWINGS FOR CONTINUATION. THIS PIT IS ONLY FOR ANY RAINWATER DWG'S FOR DETAILS DRAWINGS FOR DETAILS PLAN NORTH Q 10" STORM DRAIN LINE BELOW GRADE. LIQUID OR SIMILAR 12 2" SUMP PUMP DISCHARGE TO 17 8" OVERFLOW ROOF DRAIN PIPE. REFER TO CIVIL ENGINEER ® ELEVATOR SUMP PUMP LIBERTY PUMPS MAIN SANITARY LINE. TERMINATE 6" ABOVE FINISHED FLOOR. DRAWINGS FOR CONTINUATION. MODEL #ELV250 AUTOMATIC SUMERSIBLE 18 6" OVERFLOW ROOF DRAIN PIPE DOWN. O3 10" STORM DRAIN LINE BELOW GRADE. HP, 3450 RPM301 5 V) 14FT. TDH , 1/3 13 3/4-CD LINE IN CEILING SPACE. FIELD O TERMINATE 6" ABOVE FINISHED FLOOR. REFER TO CIVIL ENGINEER " COORD. 19 2 "SAN. STUB OUT FOR SINK INSIDE VAULT. DRAWINGS FOR CONTINUATION. Q9 3/4 WATER HEATER RELIEF LINE " TO BUILDING EXTERIOR TERMINATED 14 BACK WATER VALVE IN ACCESS BOX FBRy -EpI� VARIAN). TO VENDOR DRAWINGS ® 2 CONDENSATE DRAIN LINE. FACE DOWN 6 "A.F.F. REFER TO CIVIL ENGINEER 10 ABT TRENCH FORMER SYSTEM 15 2" DRAIN LINE FROM FIRE SPRINKLER O DRAWINGS FOR CONTINUATION. (MODEL NCH F) CONSISTING OF RISER (PIPE DN.). SEE SHEET FP2.1 O5 4 "SANITARY STACK FROM ABOVE. PRE — ENGINEERED EPS FOAM FORMERS, FOR CONTINUATION HEAVY DUTY DUCTILE IRON GRATE © 4 "VENT PIPE UP. (UNCOATED) WITH APPROPRIATE 5 LOCKING DEVICES (# 1811A) OR EQUAL 0 G S c_ Design Services For The Built Environment 71 Atlanta Birmingham Cincinnati Columbus Dallas Fort Lauderdale Knoxville Jackson Jacksonville LOUisville Memphis Nashville Richmond Tampa G R E S H A M S M I T H A N D P A R T N E R S 6030 Hollywood Blvd. Suite 210 Hollywood, Florida 33024 954.981.9100 FIRM'S FLORIDA CERT. NO. AAP000034 /CA3806 IB26000797/LC26000381 GEORGE SANJUAN, P.E. FLORIDA LICENSE 846100 DATE: 05/17/13 REVISION No. - Date - Revision Q02/01/13 Addendum "1 Qi 03/15/13 City Comments Pesponse I 5 05/17/13 City Comments Response r FIRST FLOOR PLAN NEW CONSTRUCTION SANITARY PLAN FILE: PROJECT: 29080.00 DATE: 1 1 /29/201 2 DELTA G CONSULTING ENGINEERS. INC. 707.'N. 3 ��1It SUITE 200 PORE i4 RD'! E,� EL. 33304 00 81 '. CL C • MW, r PJT. MGR: U16LA14 ItOO PROJECT //: .12 717 •o r- t �% •' tJ ^IC w w A Q a :3 m O y O t Ln z 0- W o GEORGE SANJUAN, P.E. FLORIDA LICENSE 846100 DATE: 05/17/13 REVISION No. - Date - Revision Q02/01/13 Addendum "1 Qi 03/15/13 City Comments Pesponse I 5 05/17/13 City Comments Response r FIRST FLOOR PLAN NEW CONSTRUCTION SANITARY PLAN FILE: PROJECT: 29080.00 DATE: 1 1 /29/201 2