Loading...
13-96 (2)-001I!� AIR DISTRIBUTION SCHEDULE SYMBOL USE TYPE DESGN �ACTUiER SIZE REMARICS ACCESSORIES CD SUPPLY ELBOW WITH "AIRFOIL" TURNING VANES T" - LAY N - 24X24 MODULE V CEILING GRILLE (CG) AR DIFFUSERS TRW TDC -AA SEE PLANS - ROUND NECK O.B.D. CG CEILING GRILLE GRILLES TITUS 250-AA SEE PLANS SURFACE MOUNT O.B.D. SIR SUPPLY AR MOTORIZED DAMPER TITUS 30OFS SEE PLANS --- O,BA 7 VARIABLE AIR VOLUME BOX REGISTERS BACKDRAFT (GRAVITY OR MOTOR) DAMPER INUNE EXHAUST FAN M3.1 PARTIAL FIRST FLOOR NEW CONSTRUCTION MECHANICAL PLAN RAG RETURN AR GRILLES & REGISTERS TITUS 350FL PLANS SURFACE MOUNT LD SUPPLY LINEAR BAR DIFFUSER �Myw ML-39 SEE PLANS SURFACE MOUNT --- RD RETURN LINEAR BAR DIFFUSER TITUS MLR -39 1 SEE PLANS SURFACE MOUNT --- EG EXHAUST 13 M5.1 MECHANICAL DETAILS PLAN 1 --- 14 GRILLE GRILLES 5OF SEE PLANS M M5.3 MECHANICAL DETAILS PLAN 3 DAL 0/A INTAKE GREENHUX W/b.G PRODUCT LOUVER LOUVER D -WAD APPROVAL EAL EXHAUST AR GREENHECK W/b.C. PRODUCT LOUVER LOUVER EHH -601D SEE aANS APPROVAL GENERAL MID HVAC CONTRACTOR TO COORDINATE FINISH AND USED WHITE COLOR OF ALL AR DMTRBU71ON PRODUCTS PRIOR TO ORDERIK ALL DFFUSERS SHALL HAVE WITE FINISH. AIR DISTRIBUTION / DUCTWORK NOTES 1. REFER TO ARCHITECTURAL PLANS FOR CEILING TYPE. 2. PROVIDE OFF WHITE FINISH (SUBJECT TO ARCHITECTS APPROVAL). 3. ALL DUCTWORK WHERE ALLOWED BY LOCAL CODES AND CEILING RATING SHALL BE AS FOLLOWS: A. S/A - R/A INSULATED G90 GALVANIZED G22 SHTMTL. 2% 1LB DENSITY B. EXHAUST AIR DUCTWORK - G90 GALVANIZED G24 SHEETMETAL C. INSULATIO THICKNESS QENSI (INC HES) (PC F) OUTSIDE AIR INTAKE DUCTS - N/A N/A EXHAUST DUCTS BLANKET N/A N/A SUPPLY AIR DUCTS INT LINING 2 1 (CONCEALED WITHIN BLDG. ENVELOPE) 4. ALL DUCTWORK AND DIFFUSERS SHALL BE RATED FOR THE USE, PRESSURE AND TEMPERATURE SPECIFIED AND AS REQUIRED BY THE CEILING SYSTEM RATING. 5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH "SMACNA" STANDARDS AND LOCAL BUILDING CODES. 6. ALL DUCT SIZES ARE CLEAR INSIDE DIMENSIONS. 7. SEAL ALL DUCTS, JOINTS AND SEAMS IN AN APPROVED MANNER AND INSURE AGAINST LEAKAGE. 8. PROVIDE ACCESS DOORS AS REQUIRED FOR ALL MECHANICAL EQUIPMENT TO SERVICE AND VISUALLY CHECK ROTATION OF FANS AND MOTORS, POSITION OF DAMPERS, REPLACE FIRE DAMPER LINKS, ADJUST OR REPLACE CONTROLS, ETC. 9. PROVIDE VANED ELBOWS IN ALL CASES, SPUTTER DAMPERS WHERE INDICATED ON DRAWINGS AND VOLUME CONTROL DAMPERS IN ALL BRANCH DUCTS OR DIFFUSER CONNECTIONS. MECHANICAL LEGEND GENERAL NOTES: f 1. ALL MECHANICAL SYSTEMS ARE TO BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE SECTIONS OF THE NFPA STANDARDS, ANSI STANDARDS, THE LOCAL BUILDING CODE, NOISE & HEIGHT ORDINANCES, PLANS AND SPECIFICATIONS. 2. ALL MATERIALS SHALL BE NEW AND ALL WORKMANSHIP AND MATERIALS SHAD_ BE IN STRICT ACCORDANCE WITH APPLICABLE LOCAL CODES, PRODUCT APPROVAL, RULES AND ORDINANCES, ANY DAMAGED EQUIPMENT SHALL BE REPLACED OR RESTORED TO ORIGINAL CONDITION. 3. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, ACCESS PANELS, CONTROL SYSTEMS, DEVICES, PERMITS AND SERVICES NECESSARY FOR FURNISHING AND INSTALLING A COMPLETE OPERABLE MECHANICAL SYSTEM. 4. ALL LOUVERS, GRILLES, PIPING, ETC. SHALL BE PAINTED TO MATCH SURROUNDING COLOR AND TEXTURES AS REQUIRED BY ARCHITECT. VERIFY COLOR AND TEXTURE WITH ARCHITECT. PAINT ALL EXPOSED MECHANICAL EQUIPMENT WITH BENJAMIN MOORE EPDXY ENAMEL 182. 5. ALL CUTTING, PATCHING, STRUCTURAL STEEL, WEATHER PROOFING, PAINTING, AND WALL OPENINGS SHALL BE BY THE GENERAL CONTRACTOR. 6. ALL OPENINGS IN BUILDING STRUCTURE, FOR DUCTWORK, PIPING, ETC. TO BE 1/2" LARGER (ON ALL SIDES) THEN THE OUTSIDE DIMENSIONS. FILL VOIDS WITH FIRE RETARDANT SIUCONE FOAM (I.E. CHASE -FOAM CTC PR -855 BY CHASE TECHNOLOGY CORP.). 7. BUILDING HVAC CALCULATIONS ARE BASED ON THE FOLLOWING: A. INDOOR DESIGN: SUMMER 75 DDB /50% RH, WINTER 72 DDB. B. OUTDOOR DESIGN: SUMMER 91 DDB /78 DWB, WINTER 42 DDB. C. BUILDING CONDITIONS: GLASS U VALUE 0.56 GLASS S.C. 0.53 WALL U VALUE 0.20 ROOF U VALUE 0.03 PEOPLE 1 ST FUR: 44 4TH FUR: 49 OUTSIDE AIR 13 CFM PER SQ. FT. LIGHTS 1.1 W /SQ.FT. 8. PROVIDE FLEXIBLE DUCT CONNECTORS, RATED AS REQUIRED, TO ALL FANS, A/C UNITS, OR MECHANICAL EQUIPMENT. 9. PROVIDE MAINTENANCE AND OPERATION MANUAL ON ALL MECHANICAL EQUIPMENT OR SYSTEMS. PROVIDE 5 SETS OF SUBMITTALS ON ALL HVAC EQUIPMENT. SUBMITTALS SHALL HAVE A SUMMARY SHEET SHOWING ALL SCHEDULED INFORMATION. 10. HVAC CONTRACTOR WILL WARRANTY ALL MECHANICAL SYSTEMS, DUCTWORK, THERMOSTATS, AND ALL OTHER EQUIPMENT,PARTS AND LABOR UNDER THESE DRAWINGS AND SPECIFICATIONS FOR A PERIOD OF ONE (1) YEAR AFTER C.O. OF BUILDING. ANY REPAIRS REQUIRING SYSTEM SHUT DOWN WILL BE DONE DURING NON OPERATIONAL PERIODS. HVAC CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES PRIOR TO BIDDING AND PURCHASING ANY EQUIPMENT. 11. AIR QUALITY SHOULD BE TESTED BEFORE OCCUPANCY AND SHOULD BE INSTRUMENTED AND MONITORED THEREAFTER, OR AT LEAST AT REGULAR INTERVALS MECHANICAL EQUIPMENT NOTES: 1. ALL MECHANICAL EQUIPMENT SHALL BE ARI & U.L LISTED WHERE APPLICABLE AND RATED FOR THE REQUIRED SERVICE, PRESSURES, TEMPERATURES, AND SHALL BE PROVIDED WITH ALL NECESSARY TRANSFORMERS, SEALS, VALVES, CONNECTIONS. ETC. TO FUNCTION PROPERLY. 2. PROVIDE SMOKE DETECTORS WITH ACCESS DOORS IN ALL SUPPLY AIR DUCTS FOR FANS AND AHU'S OF 2000 CFM OR ABOVE. ALL SMOKE DETECTORS SHALL BE BY ONE MANUFACTURER; COORDINATE VOLTAGE ETC. WITH ELECTRICAL CONTRACTOR AND FIRE ALARM SYSTEM BEFORE ORDERING. UPON DETECTION, SMOKE DETECTORS SHALL SHUT DOWN ASSOCIATED AIR MOVING EQUIPMENT. 3. PROVIDE TYPE "B" FIRE DAMPERS IN ALL DUCTS OR OPENINGS PENETRATING FIRE RATED WALLS, PARTITIONS, FLOORS OR ROOF SLABS AND AT FRESH AIR INTAKES IF REQUIRED (SEE ARCHITECTS PLANS FOR RATINGS). PROVIDE RADIATION DAMPERS IN RATED CEILINGS FOR ALL CEILING OPENINGS, CEILING FANS, DIFFUSERS OR GRILLES RATED FOR USE IN THE CEILING ASSEMBLY AS SPECIFIED BY ARCHITECT. 4. PROVIDE BACKDRAFT DAMPERS ON ALL EXHAUST FANS AND /OR INUNE FANS. 5. PROVIDE VIBRATION ISOLATORS ON ALL MECHANICAL EQUIPMENT AS CALLED FOR IN THE SPECIFICATIONS. IF NOT SPECIFIED, AS RECOMMENDED BY MANUFACTURER FOR QUIET OPERATION (WITH 99% ISOLATION EFFICIENCY). 6. PROVIDE A MIN. OF 10' CLEARANCE BETWEEN 0/A INTAKES AND VTR OR EXHAUST OPENINGS. 7. INDEPENDENT CONTRACTOR SHALL TEST AND BALANCE ALL MECHANICAL EQUIPMENT AIR DEVICES. EXTRACTORS. DAMPERS. AHU'S & FAN RATES. ETC. TO PROVIDE THE DESIGN QUANTITIES AS SHOWN ON THE PLANS OR SCHEDULES. PROVIDE T & B REPORT IN ACCORDANCE WITH THE AIR BALANCE COUNCIL STANDARDS. PROVIDE FINAL BALANCING FOR ALL SYSTEMS TO SATISFACTION OF OWNER AND ENGINEER. T & B CONTRACTOR SHALL VISIT JOB SITE DURING CONSTRUCTION TO ENSURE THAT ALL DUCTS. DAMPERS. ETC. ARE INSTALLED FOR PROPER AND QUIET AIR DELIVERY. 8. THERMOSTAT LOCATION SHALL BE APPROVED BY OWNER AND ENGINEER BEFORE INSTALLATION. 9. RUN INSULATED CONDENSATE DRAINS AS PER PLUMBING DRAWINGS. 10. NOT USED. 11. ALL PIPING AND DUCTWORK SHALL BE SLEEVED THRU WALLS, BEAMS, SLABS, ETC, AS REQUIRED AND COORDINATED WITH THE STRUCTURAL ENGINEER. REWORK BAR JOIST CROSS BRACING AND PROVIDE NECESSARY TRANSITIONS AS REQUIRED FOR DUCTWORK INSTALLATION. 12. ALL INSULATION WILL HAVE FIRE /SMOKE RATING LESS THAN 25/50. 13. PROVIDE MOTOR STARTERS AS FOLLOWS (UNLESS OTHERWISE RECOMMENDED BY MOTOR MANUFACTURER): A: PROVIDE OVERLOAD PROTECTION - 1/3 HP AND ABOVE (ALL PHASES). B: PROVIDE ACROSS THE LINE VOLTAGE STARTING BELOW 25 HP. 14. ALL OUTDOOR EQUIPMENT SHALL COMPLY WITH LOCAL ZONING NOISE ORDINANCES. MIN. REQUIREMENT SHALL NOT EXCEED A NOISE LEVEL OF 65 DB AS MEASURED RADIALLY 30 FT FROM THE EQUIPMENT IN ALL DIRECTIONS. 15. FILTERS SHALL BE IN PLACE DURING CONSTRUCTION. PROVIDE A NEW SET PRIOR TO TEST AND BALANCE AND A FINAL SET AT THE END OF ONE YEAR SERVICE PERIOD. r'' MECHANICAL INDEX NEW WORK DRWI r NEW DUCTWORK � DOUBLE WALL INSULATED 1 DUCTWORK SUPPLY /RETURN AIR DUCTWORK ELBOW WITH "AIRFOIL" TURNING VANES T" FLEXIBLE DUCTWORK V CEILING GRILLE (CG) 3 UNEAR DIFFUSER SUPPLY FIRE STOPPING UNEAR DIFFUSER RETURN EXHAUST GRILLE ® AUDIO /VISUAL ALARM FOR DUCT SMOKE DETECTOR eAIR INLET - OUTLET TYPE /CFM r- VOLUME DAMPER MOTORIZED DAMPER SD DUCT SMOKE DETECTOR -� FIRE DAMPER /ACCESS DOOR (FD /AD) 7 VARIABLE AIR VOLUME BOX L� BACKDRAFT (GRAVITY OR MOTOR) DAMPER INUNE EXHAUST FAN M3.1 PARTIAL FIRST FLOOR NEW CONSTRUCTION MECHANICAL PLAN R/A OPENING ABOVE FINISH CEIUNG IN R/A PLENUM. OT THERMOSTAT T S T1iERMOSTAT WITH INTEGRATED TEMPERATURE SENSOR OHUMIDISTAT 10 OKEY NOTE CONNECT TO EXISTING CG CEILING GRILLE EG EXHAUST GRILLE A.P. ACCESS PANEL GENERAL NOTES: f 1. ALL MECHANICAL SYSTEMS ARE TO BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE SECTIONS OF THE NFPA STANDARDS, ANSI STANDARDS, THE LOCAL BUILDING CODE, NOISE & HEIGHT ORDINANCES, PLANS AND SPECIFICATIONS. 2. ALL MATERIALS SHALL BE NEW AND ALL WORKMANSHIP AND MATERIALS SHAD_ BE IN STRICT ACCORDANCE WITH APPLICABLE LOCAL CODES, PRODUCT APPROVAL, RULES AND ORDINANCES, ANY DAMAGED EQUIPMENT SHALL BE REPLACED OR RESTORED TO ORIGINAL CONDITION. 3. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, ACCESS PANELS, CONTROL SYSTEMS, DEVICES, PERMITS AND SERVICES NECESSARY FOR FURNISHING AND INSTALLING A COMPLETE OPERABLE MECHANICAL SYSTEM. 4. ALL LOUVERS, GRILLES, PIPING, ETC. SHALL BE PAINTED TO MATCH SURROUNDING COLOR AND TEXTURES AS REQUIRED BY ARCHITECT. VERIFY COLOR AND TEXTURE WITH ARCHITECT. PAINT ALL EXPOSED MECHANICAL EQUIPMENT WITH BENJAMIN MOORE EPDXY ENAMEL 182. 5. ALL CUTTING, PATCHING, STRUCTURAL STEEL, WEATHER PROOFING, PAINTING, AND WALL OPENINGS SHALL BE BY THE GENERAL CONTRACTOR. 6. ALL OPENINGS IN BUILDING STRUCTURE, FOR DUCTWORK, PIPING, ETC. TO BE 1/2" LARGER (ON ALL SIDES) THEN THE OUTSIDE DIMENSIONS. FILL VOIDS WITH FIRE RETARDANT SIUCONE FOAM (I.E. CHASE -FOAM CTC PR -855 BY CHASE TECHNOLOGY CORP.). 7. BUILDING HVAC CALCULATIONS ARE BASED ON THE FOLLOWING: A. INDOOR DESIGN: SUMMER 75 DDB /50% RH, WINTER 72 DDB. B. OUTDOOR DESIGN: SUMMER 91 DDB /78 DWB, WINTER 42 DDB. C. BUILDING CONDITIONS: GLASS U VALUE 0.56 GLASS S.C. 0.53 WALL U VALUE 0.20 ROOF U VALUE 0.03 PEOPLE 1 ST FUR: 44 4TH FUR: 49 OUTSIDE AIR 13 CFM PER SQ. FT. LIGHTS 1.1 W /SQ.FT. 8. PROVIDE FLEXIBLE DUCT CONNECTORS, RATED AS REQUIRED, TO ALL FANS, A/C UNITS, OR MECHANICAL EQUIPMENT. 9. PROVIDE MAINTENANCE AND OPERATION MANUAL ON ALL MECHANICAL EQUIPMENT OR SYSTEMS. PROVIDE 5 SETS OF SUBMITTALS ON ALL HVAC EQUIPMENT. SUBMITTALS SHALL HAVE A SUMMARY SHEET SHOWING ALL SCHEDULED INFORMATION. 10. HVAC CONTRACTOR WILL WARRANTY ALL MECHANICAL SYSTEMS, DUCTWORK, THERMOSTATS, AND ALL OTHER EQUIPMENT,PARTS AND LABOR UNDER THESE DRAWINGS AND SPECIFICATIONS FOR A PERIOD OF ONE (1) YEAR AFTER C.O. OF BUILDING. ANY REPAIRS REQUIRING SYSTEM SHUT DOWN WILL BE DONE DURING NON OPERATIONAL PERIODS. HVAC CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES PRIOR TO BIDDING AND PURCHASING ANY EQUIPMENT. 11. AIR QUALITY SHOULD BE TESTED BEFORE OCCUPANCY AND SHOULD BE INSTRUMENTED AND MONITORED THEREAFTER, OR AT LEAST AT REGULAR INTERVALS MECHANICAL EQUIPMENT NOTES: 1. ALL MECHANICAL EQUIPMENT SHALL BE ARI & U.L LISTED WHERE APPLICABLE AND RATED FOR THE REQUIRED SERVICE, PRESSURES, TEMPERATURES, AND SHALL BE PROVIDED WITH ALL NECESSARY TRANSFORMERS, SEALS, VALVES, CONNECTIONS. ETC. TO FUNCTION PROPERLY. 2. PROVIDE SMOKE DETECTORS WITH ACCESS DOORS IN ALL SUPPLY AIR DUCTS FOR FANS AND AHU'S OF 2000 CFM OR ABOVE. ALL SMOKE DETECTORS SHALL BE BY ONE MANUFACTURER; COORDINATE VOLTAGE ETC. WITH ELECTRICAL CONTRACTOR AND FIRE ALARM SYSTEM BEFORE ORDERING. UPON DETECTION, SMOKE DETECTORS SHALL SHUT DOWN ASSOCIATED AIR MOVING EQUIPMENT. 3. PROVIDE TYPE "B" FIRE DAMPERS IN ALL DUCTS OR OPENINGS PENETRATING FIRE RATED WALLS, PARTITIONS, FLOORS OR ROOF SLABS AND AT FRESH AIR INTAKES IF REQUIRED (SEE ARCHITECTS PLANS FOR RATINGS). PROVIDE RADIATION DAMPERS IN RATED CEILINGS FOR ALL CEILING OPENINGS, CEILING FANS, DIFFUSERS OR GRILLES RATED FOR USE IN THE CEILING ASSEMBLY AS SPECIFIED BY ARCHITECT. 4. PROVIDE BACKDRAFT DAMPERS ON ALL EXHAUST FANS AND /OR INUNE FANS. 5. PROVIDE VIBRATION ISOLATORS ON ALL MECHANICAL EQUIPMENT AS CALLED FOR IN THE SPECIFICATIONS. IF NOT SPECIFIED, AS RECOMMENDED BY MANUFACTURER FOR QUIET OPERATION (WITH 99% ISOLATION EFFICIENCY). 6. PROVIDE A MIN. OF 10' CLEARANCE BETWEEN 0/A INTAKES AND VTR OR EXHAUST OPENINGS. 7. INDEPENDENT CONTRACTOR SHALL TEST AND BALANCE ALL MECHANICAL EQUIPMENT AIR DEVICES. EXTRACTORS. DAMPERS. AHU'S & FAN RATES. ETC. TO PROVIDE THE DESIGN QUANTITIES AS SHOWN ON THE PLANS OR SCHEDULES. PROVIDE T & B REPORT IN ACCORDANCE WITH THE AIR BALANCE COUNCIL STANDARDS. PROVIDE FINAL BALANCING FOR ALL SYSTEMS TO SATISFACTION OF OWNER AND ENGINEER. T & B CONTRACTOR SHALL VISIT JOB SITE DURING CONSTRUCTION TO ENSURE THAT ALL DUCTS. DAMPERS. ETC. ARE INSTALLED FOR PROPER AND QUIET AIR DELIVERY. 8. THERMOSTAT LOCATION SHALL BE APPROVED BY OWNER AND ENGINEER BEFORE INSTALLATION. 9. RUN INSULATED CONDENSATE DRAINS AS PER PLUMBING DRAWINGS. 10. NOT USED. 11. ALL PIPING AND DUCTWORK SHALL BE SLEEVED THRU WALLS, BEAMS, SLABS, ETC, AS REQUIRED AND COORDINATED WITH THE STRUCTURAL ENGINEER. REWORK BAR JOIST CROSS BRACING AND PROVIDE NECESSARY TRANSITIONS AS REQUIRED FOR DUCTWORK INSTALLATION. 12. ALL INSULATION WILL HAVE FIRE /SMOKE RATING LESS THAN 25/50. 13. PROVIDE MOTOR STARTERS AS FOLLOWS (UNLESS OTHERWISE RECOMMENDED BY MOTOR MANUFACTURER): A: PROVIDE OVERLOAD PROTECTION - 1/3 HP AND ABOVE (ALL PHASES). B: PROVIDE ACROSS THE LINE VOLTAGE STARTING BELOW 25 HP. 14. ALL OUTDOOR EQUIPMENT SHALL COMPLY WITH LOCAL ZONING NOISE ORDINANCES. MIN. REQUIREMENT SHALL NOT EXCEED A NOISE LEVEL OF 65 DB AS MEASURED RADIALLY 30 FT FROM THE EQUIPMENT IN ALL DIRECTIONS. 15. FILTERS SHALL BE IN PLACE DURING CONSTRUCTION. PROVIDE A NEW SET PRIOR TO TEST AND BALANCE AND A FINAL SET AT THE END OF ONE YEAR SERVICE PERIOD. r'' MECHANICAL INDEX YES DRWI r DUCT SMOKE DETECTOR � i 1 MIA MECHANICAL INDEX. SYMBOL LEGEND AND NOTES. SMOKE DAMPERS) 2 M1.2 MECHANICAL SCHEDULES • FIRE RATED ROOF/ FLOOR CEILING ASSEMBLY 3 M2.1 FIRST FLOOR PLAN NEW CONSTRUCTION MECHANICAL PLAN FIRE STOPPING • 4 M2.2 SECOND FLOOR PLAN NEW CONSTRUCTION MECHANICAL PLAN • 5 M2.3 THIRD FLOOR PLAN NEW CONSTRUCTION MECHANICAL PLAN a M2.4 FOURTH FLOOR PLAN NEW CONSTRUCTION ' MECHAMCAL PLAN 7 M2.5 ROOF LEVEL PLAN NEW CONSTRUCTION MECHANICAL PLAN a M3.1 PARTIAL FIRST FLOOR NEW CONSTRUCTION MECHANICAL PLAN 9 M3.2 PARTIAL FIRST FLOOR NEW CONSTRUCTION MECHANICAL PLAN 10 M3.3 PARTIAL FOURTH FLOOR ENLARGED MECHANICAL PLAN 11 M4.1 MECHANICAL CONTROLS PLAN 1 12 M4.2 MECHANICAL CONTROLS PLAN 2 13 M5.1 MECHANICAL DETAILS PLAN 1 14 M5.2 MECHANICAL. DETAILS PLAN 2 15 M5.3 MECHANICAL DETAILS PLAN 3 COORDINATION NOTES: 1. A/C CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE HIS WORK FOR SIZE, LOCATION, CLEARANCE, ACCESS AND ELECTRICAL CHARACTERISTICS WITH ALL OTHER TRADES AND TO PROVIDE SHOP DRAWINGS TO THE ENGINEER FOR REVIEW BEFORE INSTALLATION OF DUCTWORK OR EQUIPMENT. SHOP DRAWING WILL INCLUDE BEAM OR STRUCTURE ELEVATION & REQUIRED EQUIPMENT ACCESS AREAS. 2. WALL, ROOF, AND CEILING OPENINGS INDICATED ON CONTRACTOR DRAWINGS ARE NOMINAL DIMENSIONS ONLY AND ALL DUCT, PIPE OR EQUIPMENT PENETRATIONS SHALL BE SLEEVED AND FIRE RATED AS REQUIRED, ADJUST OPENINGS 3. COORDINATE LOCATION OF CEILING DIFFUSERS, GRILLES AND REGISTERS IN THE FIELD WITH LIGHTS, SPRINKLERS AND ARCHITECTURAL ELEMENTS. 4. COORDINATE LOCATION OF A/C UNITS, THERMOSTATS, FANS AND DUCTWORK WITH BUILDING STRUCTURE AND OTHER TRADES SO THAT NO INTERFERENCES OCCUR. 5. IN GENERAL, DUCT OFFSETS HAVE NOT BEEN SHOWN. A/C CONTRACTOR TO COORDINATE THESE AS REQUIRED. 6. MECHANICAL PLANS IN GENERAL, ARE DIAGRAMMATIC IN NATURE, AND ARE TO BE READ IN CONJUNCTION WITH ARCH. PLUMBING, ELECTRICAL AND STRUCTURAL PLANS AND SHALL BE CONSIDERED AS ONE SET OF DOCUMENTS. DUCT AND PIPING OFFSETS, BENDS AND TRANSITIONS WILL BE REQUIRED TO PROVIDE AND INSTALL A COMPLETE FUNCTIONAL SYSTEM AND SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 7. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO BIDDING, ORDERING, FABRICATION OR INSTALLATION OF MATERIALS OR EQUIPMENT. CONTROLS: 1. TEST AND ADJUST SUPPLY AND RETURN AIR TEMPERATURES TO BE WITHIN 5% OF DESIGN REQUIREMENTS +/- 2 T. NOTES TO CONTRACTOR DRAWINGS /DETAILS ARE TO BE CONSIDERED DIAGRAMMATIC. NOT NECESSARILY SHOWING IN DETAIL OR TO SCALE ALL MINOR ITEMS. UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE STRUCTURAL, ARCHITECTURAL AND SITE CONDITIONS SHALL GOVERN EXACT LOCATIONS. CONTRACTOR SHALL FOLLOW DRAWINGS IN LAYING OUT WORK. AND CHECK/ COORDINATE DRAWINGS OF ALL TRADES. PLENUM NOTE ALL MATERIALS WITHIN R/A PLENUMS SHALL BE NON - COMBUSTIBLE AND COMPLY WITH ALL THE REQUIREMENTS OF FMC- 602.2.1. HVAC DESIGN REQUIRES YES NO DUCT SMOKE DETECTOR • i FIRE DAMPERS) • SMOKE DAMPERS) • FIRE RATED ENCLOSURE • FIRE RATED ROOF/ FLOOR CEILING ASSEMBLY • FIRE STOPPING • SMOKE CONTROL • a Sf 0 Design Services For The Built Environment N Atlanta Birmingham Cincinnati Columbus Dallas Fort Lauderdale Knoxville Jackson Jacksonville Louisville Memphis Nashville Richmond Tampa ■ G R E S H A M S M I T H A N D P A R T N E R S 6030 Hollywood Blvd. Suite 210 Hollywood, Florida 33024 954.981.9100 FIRM'S FLORIDA CERT. NO. AAP000034 /CA3806 1B26000797/LC26000381 ;\ENGINE RS 707 N.E:.'W A cV FORT.'J.tY P1!hI>ALE, F 33 04% :. (954) -111 O CA #0 91 1 •: - -- ` - -- -- PJT. MGR: MICHAEL HO PROJECT #: 120717 CIL i.'� �_ w w � o % U) - mc m 4o t\ w r� U) Q L Q �_ X ``) � LLJ o GEORGE SANJUAN, P.E. FLORIDA LICENSE #46100 DATE: 02/01/13 REVISION No. - Date - Revision Q02/01/13 i Addendum #1 i i MECHANICAL INDEX, SYMBOL LEGEND AND NOTES M1.1 FILE: PROJECT: 29080.00 DATE: 1 1 /29/201 2