13-1274-009P. C. I. JOIST
1) ELLIS
OR -
JOIST 2) SEE r FOR
SHORE •- ! AND LOADS
O.U.M.
L/2 L/2
L
NOTE:
NO SIDE SHORE REQ'D. UNLESS NOTED ON JOIST SCHED. OR ON
®M. SHORING DWGS.
CONC. SHIM,
(TYP.)
! c
L-
f_.
L I
IF JOIST DOES NOT DIRECTLY ON ORES
ATO AFTER JOIST IS SET, CONTACT
BEFORE POUR.
L
I
P.C.I. FOREMAN NOTE: IF JOIST DOES NOT REST DIRECTLY ON SHORES
Al 1/4 PT. AFTER JOIST SET, CONTACT r
BEFORE `•
[elm r s` mov"m
AFTER CHORE AT CENTER OF SPAN
P.C.I. FOREMAN NOTE: IF JOIST DOES NOT REST DIRECTLY ON SHORES1
ATO JOIST CONTACT
BEFORE POUR.
4— FOR SHORE LOADS AND CROWNS SEE JOIST MATERIAL
SCHEDULE.
-!
JOIST DOES i DIRECTLY ON !'
AFTER JOIST CONTACT
BEFORE POUR.
SCAFFOLDING FOR FORMING BM.
MUST SUPPO• ! AND
CONSTRUCTION !.D Er TO
BM. MEN END SHORES
RE-
MOVED.
JOIST USED NTH P.I.P. BEAM.
BEFORE SHORE AT 1/3 OF SPAN
P.C.I. FOREMAN NOTE: IF JOIST DOES NOT REST DIRECTLY ON SHORES
AT 1/3 PT. AFTER JOIST IS SE-L CONTACT P.C.I.
POUR.
I Ell C0,14 N 3lwft"071r*rz_.r: in Pon
ONLY • !r• • Q r
UNDER FRESH POUR FOR
FFFICE r •+ • •
• OR r i - . i
r W
-m
E=
SKETCH
at in ! ti c r • ` !-
V
w
x
V
0
V
7
1
t
m
�r
a
r
1 � 1 � r i►
P.C.I. FOREMAN DOES NOT DIRECTLY , SHORESI
JOIST AT 1/4 PT. AFTER CONTACT
BEFORE - • 2.
SHORING AND SIRIPPING PROCEDURE.
1j9,10092
- ! a i