Loading...
13-1274-002L(-) Lo W Lc) Lo _ry — 00—N �MA I L ARCH., NOTE. ;..!m REM NOW- MA V-6 1 - HOLD DOWN ALL NON-aEAF;dNG WALLS UNTIL SLAB IS POURED AND SHOTES REMOVED DO NOT PLACE BEAM TOP STEEL UNTIL JOISTS ARE PLACED V4* SLOPE Mon VERIFY AM CONDITIOM DIMENS"M SOFFIT AND JOKM LENGIK - QC. M INSURE MOO" SLAB REOUIRED THRU OUT DECV- - BOTTOM SOFFIT ELEVATION SHOWN AS REFERENCF4 G. Q RESPONSIBLE FOR r FURNISHING ELEVATIONS. • N07FY P.C.I. 24 HOURS BEFORE POURING. 14 5*-80= 79'-e PLYWOoOD FORMS SHOULD ALLM TO BE STRIPPED 48 HOURS AFTER POUR: PCI STANDARD - VERIFY JOW E* NOT INTERFERE NTH OPENINM PLUMBING OR COIL STEEL. - C%Q RESPO�E FOR FUINSHING CORRECT WTTOM OF JOW ELEVATIONS ALONG POURED IN RACE BEAMS AND GRADE BEAMS, WOCH ARE FORMED BY OTHERS. - STRUCTURE 140T EXPOSED UNI 0THElr*SE NOTED ON PLAN. ll , - QQ TO INSURE SLAB REWaMENT AS PER STRUM. PLAN (TYP.). RAF ARCH. ENG. G.C. NOTE: kit NOTES. SHMQ AND SlMeMra PROCE]DURE 1�- At SIMM M F0ftL PLYNOW it CAN BE SIRVPED AFTEft 24 HMW FOR SPAN UMS OF W-r } '111 3V4! SHIM 48 HOM FOR WAR UP 70 9--M 72 HOM FM WM OE79M V-V AM tl*--W 2)- NMEASE 00%M 8-J71 �7 2 �Vl �04! A�- 91m ES CAN BE MLEASE AFTVt 7 DAYS OR on, MTN CITY 0- SOUTH POIANli 13UILDIINIG D�EPT. STRUCTURAL-2ECTION VAIM[fiv, DESIGN DATA Vic TOPPING= 4.000 P.S.I. U) f'c PRECAST= 6.000 P.S.I. Lo TOTAL JOIST AREA= 14-300 S•F• THIS SHT. KK ®_ U-) TOTAL SOFF. BM.= 690 LF. THIS SHT. 00 S.I.L.= 50 (L.L.) + (D.L.)= 50 p. S. (u.O.N4, 00 1— L(-) Lo W Lc) Lo _ry — 00—N �MA I L ARCH., NOTE. ;..!m REM NOW- MA V-6 1 - HOLD DOWN ALL NON-aEAF;dNG WALLS UNTIL SLAB IS POURED AND SHOTES REMOVED DO NOT PLACE BEAM TOP STEEL UNTIL JOISTS ARE PLACED V4* SLOPE Mon VERIFY AM CONDITIOM DIMENS"M SOFFIT AND JOKM LENGIK - QC. M INSURE MOO" SLAB REOUIRED THRU OUT DECV- - BOTTOM SOFFIT ELEVATION SHOWN AS REFERENCF4 G. Q RESPONSIBLE FOR r FURNISHING ELEVATIONS. • N07FY P.C.I. 24 HOURS BEFORE POURING. 14 5*-80= 79'-e PLYWOoOD FORMS SHOULD ALLM TO BE STRIPPED 48 HOURS AFTER POUR: PCI STANDARD - VERIFY JOW E* NOT INTERFERE NTH OPENINM PLUMBING OR COIL STEEL. - C%Q RESPO�E FOR FUINSHING CORRECT WTTOM OF JOW ELEVATIONS ALONG POURED IN RACE BEAMS AND GRADE BEAMS, WOCH ARE FORMED BY OTHERS. - STRUCTURE 140T EXPOSED UNI 0THElr*SE NOTED ON PLAN. ll , - QQ TO INSURE SLAB REWaMENT AS PER STRUM. PLAN (TYP.). RAF ARCH. ENG. G.C. NOTE: kit NOTES. SHMQ AND SlMeMra PROCE]DURE 1�- At SIMM M F0ftL PLYNOW it CAN BE SIRVPED AFTEft 24 HMW FOR SPAN UMS OF W-r } '111 3V4! SHIM 48 HOM FOR WAR UP 70 9--M 72 HOM FM WM OE79M V-V AM tl*--W 2)- NMEASE 00%M 8-J71 �7 2 �Vl �04! A�- 91m ES CAN BE MLEASE AFTVt 7 DAYS OR on, MTN CITY 0- SOUTH POIANli 13UILDIINIG D�EPT. STRUCTURAL-2ECTION VAIM[fiv,