Loading...
09-178R-012%" CDX PLYWOOD SHEATHING �D W /10d SHANK RING NAILS a 6" O.C. (4" a PERIMETER) MPAI CLIP (EA SIDE) 5-6 PIGGY BACK WOOD 5 AS MFR BY LISP 3 "x6" WOOD ROOF TRUSSES 624"O/C. 6-(0 2 "x6" t4G DECK RAFTER 024" O/G W /(2) 166 NAILS \ 2 "x6" 01611 JhELEV: 412'-511 NV TOP OF BEAM LN L� 4 "x12" WOOD • ABEAM I� 3/4" CDX PLYWOOD—!-- LYWOOD — 4' -0" SHEATHING W 1106 SHANK RING NAILS e 6" O.C. (4" a PERIMETER) 3/4" CDX PLYWOOD SHEATHING W 1106 SHANK RING NAILS EA SIDE OF EXISTING TRUSS EXISTING STRUCTURE TO REMAIN iz "41 THRU BOLT x12" WOOD \ BEAM 2x6 PT W/5/f,&" XL ° TAPCONS e all O/C MIN EMB= 1 3/4" NEW CONC BEAM SEE LAN 4 SCHEDULE TB -10 EXISTING ROOF TRUSS OVERHANG TO BE REMOVED N CONC BEAM SEE PLAN 4 SCHEDULE RTB -2 .D Yz" EXP JT MTG S" CONC. SLAB REFER t0 PLANS a ° g 4 _ FOR RENR 4 F r6ELEV: 4-211 �� / /� / /� / /� / /� / /�/ •� / /�• • ° . °• • ..a4 . � .• : a• / / TOP OF SLAB ii #5e24" ° 6 MILL VAPOR BARRIER CONC BEAM SEE ORGANIC PLAN 4 SCHEDULE MATERIALS TO REMAIN &E CT f ON F &GALE: 3/4"=V-01A&-6 2 "x6" T4G DECK W /(2) 166 NAILS 3 "x6 " WOOD RAFTER 624 "O /C HURRICANE STRAP NEW CONC BEAM SEE —/ PLAN 4 SCHEDULE S" MASONRY WALL— W/#5 e 32" O /C. IN 3000 PSI GROUT FILLED CELLS W/ STD 90' HK. "S DOWELLS SET 6" INTO EXISTING TB USING ------ HILTI RE500 EPDXY &E CT f ON rH-,� SCALE: 3/4"=V-01A5-6 ELEV: +11' -4" TOP OF BEAM EDGER TYPE "A" :LEV: VARIES TOP OF EXISTING ROOF LEv: 45' -2" TOP OF EXISTING TB EXISTING XISTING ROOF MASONRY TRUSSES WALL t0 REMAIN ° CONC. FOOTING SEE PLAN 4 SCHEDULE - O ° CORAL ROCK. NOTE: ROOF SHEATHING RAFTERS, EXISTING ROOF, ETC. NOT SHOWN FOR CLARITY. , 4"4" WOOD BEAM ELEV: +12 " -a" TOP OF BEAM (2A "4 THRU BOL 01b'- CARRIAGE BOL (1) %a"0 HILTI KWIK 5OLT3 MIN PEN 4" INTO CONCRETE BEAM • NVFHE3C HANGER AS MFR BY NU -VUE "x6" WOOD POST AU66 AS MFR BY USP NOA 001- 0306 -06 - EXISTING BEAM STING MASONRY WALL DETA f L 5 6CALE: 1" =1' -0" & -6 FOOTING TO BEAR ON CORAL ROCK. SE CT f Oil SCALE: 3/4"=I'- S -6 3 NOTE: ROOF SHEATHING RAFTERS, EXISTING ROOF, ETC. NOT SHOWN FOR CLARITY. 4 "x12" WOOD BEAM r6hIELEV: 412" -Q" TOP OF BEAM O °. (2) HILTI KWIK BOLT3 MIN PEN 4" INTO CONCRETE BEAM 7-1 V4 - (2T� /a "m CARRIAGE BOLT a NVFHE3C HANGER AS MFR BY NU -VUE a ° NEW CONC- BEAM RTB -2 (SEE DETAIL SHEET S -3 EXISTING BEAM DETAfL C 1" 6 SALE: = I' -0" S -6 a 8 "x8" CONG, CAP W/ 2 *S CONT. �.. ••; S" MASONRY WALL Y #1 24" IN 3000 PSI GROUT FILLED CELLS H -H 4� CONC. FOOTING SEE PLAN 4 SCHEDULE • a. 4. �\� FOOTING TO BEAR ON CORAL ROCK OF S��TH M1A�A1 �,3UjLDjNG IDEpT. UII.QING gECi14t+ 6E CT f ON SCALE: 3/41,=], -�'I S-6 paY -4 c CQ -4 I �I • co .� oc w P4 • • �n � M • d� •o � cCd7 ed ON C12 U CITY OF SOUTH MIAM) BUILDING DEPT. STRUCTU L ECTION f "' p COVED QY: bS ti A Comm. No. Scale: N.T.S. Date: 01 -22 -08 Drawn: R. ALVAREZ Checked: w� a Revisions: W 0-1/29/09 2 W A A 0 � y � rT, A 1•�••i z .o N P4 W �' � A A -4 c CQ -4 I �I • co .� oc w P4 • • �n � M • d� •o � cCd7 ed ON C12 U CITY OF SOUTH MIAM) BUILDING DEPT. STRUCTU L ECTION f "' p COVED QY: bS ti A Comm. No. Scale: N.T.S. Date: 01 -22 -08 Drawn: R. ALVAREZ Checked: E. LLANO CADD File: Revisions: 0-1/29/09 2 09/25/09 Sheet No.