Loading...
09-178R-011GONG RAKE BEAM SEE PLAN 4 SCHEDULE LEDGER TYPE "A "- 5 /s" CDX PLYWOOD SHEATHING_ W /10d SHANK RING NAILS a 6" O.G. (4" a PERIMETER) PRE - ENGINEERED WOOD ROOF TRUSSES Q 24'O/C. Y2" CDX PLYWOOD SHEATHING WKI0)d SHANK RING NAILS e6"O.C.(4" MFERIMETER) %11 CDX PLYWOOD SHEATHING W 1106 SHANK RING NAILS 6" O.C. (4" a PERIMETER) PRE - ENGINEERED WOOD ROOF TRUSSES a 24' O /C. S" MASONRY WALL - W1W5 e 32" O /C. IN 3000 PSI GROUT FILLED CELLS W/ STD C30 °HK. CONC BEAM SEE PLAN 4 SCHEDULE 8" GONG. SLA5 8" CONC. SLAB REFER TO PLANS REFER TO PLANS FOR RENF. FOR RENF. ELEV: ±0' -O" m TOP OF SLAB d N ' ° ° •• d ° d• .d •d °d ..° 1 21 /i�� /� \r ro MILL EXISTING ORGANIC 6 MILL--/ VAPOR VAPOR BARRIER MATERIALS TO REMAIN BARRIER EXISTING ORGANIC MATERIALS TO REMAIN GONG. FOOTING SEE ° d PLAN 4 SCHEDULE FOOTING TO 5EAR d III I T14�=__ON CORAL ROCK. SECT I Oil c SCALE: 3/4" =1' -O" —IN N —IN N 2411 24" LEDGER "All 2 -2 "x8" P.T. WOOD LEDGER W/ 3/4"0 HILTI KWIK BOLTS II a 12" O.C. 4 41/2" MIN. EMBEDMENT STAGGERED AS SHOWN. 5 /s" CDX PLYWOOD SHEATHING III /IIAJ C1 1 AAII/ c Ml—_ wI A II r! .:. III 6ECTION rD-, SCALE: %a" CDX PLTWOOD SHEATHING 6 KJ W /10 SHANK RING NAILS e " O.G. (411 e PERIMETER) HURRICANE NEW 2x4 STRAP I(od NAILS aCo" O/C HURRICANE T45 STAGGERED STRAP ELEV: +5' -5" TOP OF BEAM ELEV: +S' -1" II TOP OF BEAM: PRE - ENGINEERED WOOD ROOF TRUSSES a 24" O /C. CONC BEAM SEE PLAN 4 SCHEDULE GONG BEAM SEE C PLAN 4 SCHEDULE SE CT I Oil SCALE: 3/41'=P-01111S_ 5 /s" CDX PLYWOOD SHEATHING W /106 SHANK RING NAILS a ro" O.G. (4" e PERIMETER) VAPOR BARRIER EXISTING ORGANIC MATERIALS TO REMAIN An HURRICANE STRAP :LEV: +8' -5" TOP OF BEAM ELEV: -0' -2 TOP OF SLAB -CONC BEAM SEE PLAN 4 SCHEDULE GONG. FOOTING SEE A PLAN 4 SCHEDULE 1— ON CORAL ROCK. SECTION SCALE: 3/4" =1 )" S_5 CITY OF SOUTH MIAMI BUILDING DEPT. STRUCTURAL CTION .WPROVED BY: SEE BEAM SCHEDULE < SEE SCHEDULE FOR REINFORCEMENT ° 2 e d °d .da ° d d d °• ° d ° ° d ° ° d ° 8 d > d d • d ° d d d d d o Q ° ADD 2 -"5 ° DIAGONAL d d e EA. SIDE. d ^/ e 0 RT6 -2 ,ARCH DETAIL. SCALE: 3/4"=V-0" �CrY OF SOUSM MIAMI QuILDING pEpT. 5u1Lflt14G SEC'""" RPROVEO 8Y' CM0 CQ co WCO 0 00 M C� • w • P4 cri • a� M Cd .0 o-4 Cd �-4 u o C�tU hi H c. A Comm. No. Scale: N.T.S. Date: 01 -22 -08 Drawn: R. ALVAREZ Checked: wz a Revisions: w 01/29/09 2 W A 55 w A w 4j r-, c N Zao Lo a � A A CM0 CQ co WCO 0 00 M C� • w • P4 cri • a� M Cd .0 o-4 Cd �-4 u o C�tU hi H c. A Comm. No. Scale: N.T.S. Date: 01 -22 -08 Drawn: R. ALVAREZ Checked: E. LLANO CADD File: Revisions: 1 01/29/09 2 09/25/09 Sheet No. 55