09-178R-011GONG RAKE BEAM SEE
PLAN 4 SCHEDULE
LEDGER TYPE "A "-
5 /s" CDX PLYWOOD SHEATHING_
W /10d SHANK RING NAILS a 6"
O.G. (4" a PERIMETER)
PRE - ENGINEERED
WOOD ROOF TRUSSES
Q 24'O/C.
Y2" CDX PLYWOOD
SHEATHING WKI0)d
SHANK RING NAILS
e6"O.C.(4" MFERIMETER)
%11 CDX PLYWOOD SHEATHING
W 1106 SHANK RING NAILS 6"
O.C. (4" a PERIMETER)
PRE - ENGINEERED WOOD
ROOF TRUSSES a 24' O /C.
S" MASONRY WALL
- W1W5 e 32" O /C. IN
3000 PSI GROUT
FILLED CELLS W/ STD
C30 °HK.
CONC BEAM SEE
PLAN 4 SCHEDULE
8" GONG. SLA5 8" CONC. SLAB
REFER TO PLANS REFER TO PLANS
FOR RENF. FOR RENF.
ELEV: ±0' -O" m
TOP OF SLAB d N ' ° ° •• d
° d• .d
•d °d ..° 1 21
/i�� /� \r ro MILL
EXISTING ORGANIC
6
MILL--/ VAPOR
VAPOR BARRIER MATERIALS TO REMAIN
BARRIER
EXISTING ORGANIC
MATERIALS TO REMAIN
GONG. FOOTING SEE
° d PLAN 4 SCHEDULE
FOOTING TO 5EAR
d
III I
T14�=__ON CORAL ROCK.
SECT I Oil c
SCALE: 3/4" =1' -O"
—IN
N
—IN
N 2411 24"
LEDGER "All
2 -2 "x8" P.T. WOOD LEDGER W/
3/4"0 HILTI KWIK BOLTS II
a 12" O.C. 4 41/2" MIN. EMBEDMENT
STAGGERED AS SHOWN.
5 /s" CDX PLYWOOD SHEATHING
III /IIAJ C1 1 AAII/ c Ml—_ wI A II r! .:. III
6ECTION rD-,
SCALE:
%a" CDX PLTWOOD SHEATHING
6 KJ
W /10 SHANK RING NAILS e "
O.G. (411 e PERIMETER)
HURRICANE
NEW 2x4 STRAP
I(od NAILS aCo" O/C
HURRICANE T45 STAGGERED
STRAP
ELEV: +5' -5"
TOP OF BEAM ELEV: +S' -1"
II
TOP OF BEAM: PRE - ENGINEERED WOOD
ROOF TRUSSES a 24" O /C.
CONC BEAM SEE
PLAN 4 SCHEDULE
GONG BEAM SEE C
PLAN 4 SCHEDULE
SE CT I Oil
SCALE: 3/41'=P-01111S_
5 /s" CDX PLYWOOD SHEATHING
W /106 SHANK RING NAILS a ro"
O.G. (4" e PERIMETER)
VAPOR
BARRIER
EXISTING ORGANIC
MATERIALS TO REMAIN
An
HURRICANE
STRAP
:LEV: +8' -5"
TOP OF BEAM
ELEV: -0' -2
TOP OF SLAB
-CONC BEAM SEE
PLAN 4 SCHEDULE
GONG. FOOTING SEE
A PLAN 4 SCHEDULE
1—
ON CORAL ROCK.
SECTION
SCALE: 3/4" =1 )" S_5 CITY OF SOUTH MIAMI
BUILDING DEPT.
STRUCTURAL CTION
.WPROVED BY:
SEE BEAM SCHEDULE < SEE SCHEDULE
FOR REINFORCEMENT °
2 e
d
°d
.da °
d
d d °• °
d °
° d °
° d °
8 d
> d d
• d
°
d d d d
d o
Q
° ADD 2 -"5
° DIAGONAL
d d e EA. SIDE. d
^/ e
0 RT6 -2 ,ARCH DETAIL.
SCALE: 3/4"=V-0"
�CrY OF SOUSM MIAMI
QuILDING pEpT.
5u1Lflt14G SEC'"""
RPROVEO 8Y'
CM0
CQ co
WCO
0
00
M C�
• w
•
P4
cri
•
a� M
Cd
.0
o-4
Cd
�-4
u
o C�tU
hi
H
c.
A
Comm. No.
Scale:
N.T.S.
Date:
01 -22 -08
Drawn:
R. ALVAREZ
Checked:
wz
a
Revisions:
w
01/29/09
2
W
A
55
w
A
w
4j
r-,
c
N
Zao
Lo
a
�
A
A
CM0
CQ co
WCO
0
00
M C�
• w
•
P4
cri
•
a� M
Cd
.0
o-4
Cd
�-4
u
o C�tU
hi
H
c.
A
Comm. No.
Scale:
N.T.S.
Date:
01 -22 -08
Drawn:
R. ALVAREZ
Checked:
E. LLANO
CADD File:
Revisions:
1
01/29/09
2
09/25/09
Sheet No.
55