Loading...
09-178-006GONG RAKE SEAM SEE PLAN 4 SCHEDULE LEDGER TYPE "A "- CDX PLYWOOD SHEATHING W /10d SPANK RING NAILS c 6" O.G. (4" 9 PERIMETER) PRE - ENGINEERED WOOD ROOF TRUSSES fD 24'O/C. Y2" CDX PLYWOOD SHEATHING W /(10)d SPANK RING NAILS e611O.C.(411 tDPERIMETER) %I' CDX PLYWOOD SHEATHING W1106 SHANK RING NAILS g 6" O.C. (4" e PERIMETER) PRE - ENGINEERED WOOD ROOF TRUSSES g 24' O /C. 8" MASONRY WALL W /*S 6 32" O /C. IN 3000 PSI GROUT FILLED CELLS W/ STD 90'HK. GONG BEAM SEE PLAN 4 SCHEDULE %" CDX PLYWOOD SHEATHING III /t/AJ CI1Aw11/ a Itlr_ kIAll L- — III %" CDX PLYWOOD SHEATHING W /10d SHANK RING NAILS g 6" O.G. (4" -a PERIMETER) PRE - ENGINEERED WOOD— Flit ROOF TRUSSES Q 2411 O /C. GONG SEAM SEE PLAN 4 SCHEDULE HURRICANE STRAP LEV: +s' -F," TOP OF SEAM 8" GONG. SLAB a" GONG. SLAB 8" GONG. SLAB JT MTG REFER TO PLANS REFER TO PLANS REFER TO PLANS 8" GONG. SLAB FOR RENF. FOR RENF. FOR RENF. REFER TO PLANS ELEV: +O' -O' m FOR RENF. SLA ELEV: -0' -2 TOP 0 41--'TOP OF SLAB 1= B d N � d ° .. a d •a ' �.' ° • . . . ; .. d•' .. - 6 MILL 6 M ILL 6 MILL VAPOR EXISTING ORGANIC VAPOR EXISTING ORGANIC 6 MILL VAPOR BARRIER MATERIALS TO REMAIN BARRIER MATERIALS TO REMAIN VAPOR BARRIER EXISTING ORGANIC BAREXISTING ORGANIC GONG BEAM SEE PLAN 4 SCHEDULE MATERIALS TO REMAIN MATERIALS TO REMAIN CONC. FOOTING SEE A PLAN 4 SCHEDULE ° GONG. FOOTING SEE A 4 �d PLAN 4 SCHEDULE III I FOOTING TO 5EAR 1— ON CORAL ROCK. I I I I�� FOOTING TO BEAR I — ON CORAL ROCK. N SE CT 1 011 G 5GALE: 3/4"=V-0" S -5 LEDGER "A" 2- 211x811 P.T. WOOD LEDGER W/ 3 /4"P HILTI KWIK BOLTS II e 1211 O.G. 4 41/211 MIN. EMBEDMENT STAGGERED AS SHOWN. SE CT I Oil D SCALE: 3/4"=V-0"\1!t -5 SE CT I ONl E CITY OF SOUTH MIAMI BUILDING DEPT. STRUCTURAL SEG_,Tinm APPROVED BY.. 0 �� CQ co N.T.S. Date: 01 -22 -08 Drawn: • 10NO wz a Revisions: w 01/29/09 Sheet No. W A p W 0 � ci A � • z .o N W w co rn C'3 C • dw � A o 4 m A � U CS 0 0 �� CQ co N.T.S. Date: 01 -22 -08 Drawn: • 10NO E. LLANO CADD File: Revisions: o 01/29/09 Sheet No. Cfi In 55 p W • x P4 • co rn C'3 • dw cd .0 o 4 m • � U CS 0 N U . 4 F a Comm. No. Scale: N.T.S. Date: 01 -22 -08 Drawn: R. ALVAREZ Checked: E. LLANO CADD File: Revisions: 1 01/29/09 Sheet No. 55