Loading...
13-718-003GENERAL NOTES: 1.- ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE FLORIDA BUILDING CODE AND WITH THE REQUIREMENTS OF THE MIAMI DADE COUNTY, STATE & NATIONAL LAWS AND CODES, ANY DISCREPANCIES BETWEEN THE PLANS AND ABOVE REQUIREMENTS MUST BE CALL TO THE A /E'S ATTENTION BEFORE PROCEEDING WITH THE WORKS. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE PLANS, 2.- HE MUST FAMILIARIZE HIMSELF WITH THE CONTRACT DOCUMENTS BEFORE PROCEEDING WITH THE WORK AND REPORT TO A/E TO CLARIFY ANY DISCREPANCIES; CONTRACTOR MUST COORDINATE THE WORK OF ALL TRADES AND INSURE THAT ALL WORK CAN BE COMPLETE AS IT IS THE INTENT OF THE PLANS. 3.- CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS, INCLUDING SUBCONTRACTOR'S PERMITS, INSPECTIONS AND APPROVALS FROM GOVERNING AGENCIES WITH JURISDICTION OVER THE PROJECT BEFORE BEGINNING WORK. 4.- ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH THE REQUIREMENTS OF THE UTILITY COMPANIES INCLUDING THE CITY OF MIAMI DADE COUNTY PUBLIC WORKS DEPARTMENT, WHOSE SERVICES SHALL BE USED. ALL MANUFACTURERS SHALL SUBMIT SHOP DRAWINGS TO THE A/E 5.- FOR APPROVAL PRIOR TO FABRICATION. THE A/E WILL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, 6.- METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, AND HE WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DOCUMENTS. 7.- ALL MATERIAL AND WORKMANSHIP SHALL MEET THE REQUIREMENTS OF THE APPLICABLE STANDARD SPECIFICATION OF THE AMERICAN SOCIETY FOR TESTING AND MATERIALS. 8.- THE GENERAL CONTRACTOR MAY SUBSTITUTE EQUIPMENT AND /OR MATERIALS AS LONG AS SUCH CHANGES MEET ALL F.B. CODE REQUIREMENTS ARE EQUAL TO THOSE SPECIFIED ON PLANS AND OBTAINS OWNER'S APPROVAL IN WRITING. 9.- CONTRACTOR SHALL SUBMIT DADE COUNTY PRODUCT CONTROL APPROVAL ROOFING & WATER PROOFING COMPONENTS AND ALL OTHER FOR WINDOWS, PRODUCTS REQUIRING SAID APPROVAL 10.- WORKMANSHIP: ALL WORK SHALL BE PERFORMED IN A MANNER CONSISTENT WITH THE BEST PRACTICES FOR THE RESPECTIVE TRADES AND QUALITY SPECIFIED. WORK NOT CONSISTENT WITH THE TRADE HIGHEST LEVEL OF WORKMANSHIP WILL BE REJECTED. ANY WORK REJECTED SHALL BE REDONE AT CONTRACTOR'S EXPENSE. CORRECTION OF DEFECTIVE WORK SHALL BE STARTED NOT LATER THAN FIVE DAYS AFTER NOTICE IS GIVEN THE CONTRACTOR, AND SHALL PROCEED WITHOUT DELAY UNTIL WORK IS COMPLETED. 11.- CLEANUP: THE CONTRACTOR AND ALL TRADES SHALL AT ALL TIMES KEEP THE PREMISES CLEAN OF DEBRIS ARISING OUT OF THE WORK AND FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS OPERATIONS OR OTHER TRADES. THE CONTRACTOR SHALL PROVIDE AT ALL TIMES A TRASH CONTAINER ADEQUATE FOR THIS JOB. THE CONTRACTOR SHALL DELIVER ALL WORK UPON COMPLETION OF THE JOB IN A CLEAN, READY -TO -USE CONDITION. ALL FINISHED SURFACES SHALL HAVE PROTECTIVE COVERINGS REMOVED, AND SURFACES CLEANED OF ALL MARKS, STAINS, SOIL, PAINT, OR ADHESIONS OF OTHER MATERIALS AND LEFT IN PERFECT CONDITION. WINDOW SCHEDULE MARK CODE WIDTH HEIGHT REMARKS O 2HR -23 74" 38 3/8" HORIZONTAL ROLLER XO EGRESS TYPE O 2HR -1/2 33 53" 38 3/8" HORIZONTAL ROLLER XO EGRESS TYPE OC SH -22 37" 26" SINGLE HUNG CAT II (BATH) Op FIXED GLASS 8' -9" 74 1/4" FIXED GLASS O SH -12 19 1/8" 26" SINGLE HUNG CAT II (BATH) OF 3HR -23 111 38 3/8" HORIZONTAL ROLLER XOX OG 2HR -23 +FW 12' -4" 63" HORIZONTAL ROLLER XOX j1TOP OF T.BEAM ELEV. + 8' -2" j1 FINISH FLOOR ELEV. ELEV. 0' -0" U FACTOR =1.08 SHGC =0.50 DOOR SCHEDULE MARK SIZE WITH TYPE MATERIAL FRAME HARDWARE REMARKS Q 3'- 0 "X6' -8" 1 -3/4" FLUSH METAL METAL DEAD BOLT EXTERIOR FRENCH DOOR O 3'- 0 "X6' -8" 1 -3/4" FLUSH METAL METAL DEAD BOLT EXTERIOR FRENCH DOOR O 2'- 8 "X6' -8" 1 -3/4" FLUSH WOOD WOOD PRIVACITY INTERIOR DOOR O 2'- 8 "X6' -8" 1 -3/4" FLUSH METAL METAL 24.7 FIRE RATED 5 2'- 6 "X6' -8" 1 -3/4" BI -FOLD WOOD WOOD WINDOW BI -FOLD FULL LOVERED O6 8' -9" X74 1/4" 1 -3/4" DOOR SUDING METAL /GLASS METAL DEAD BOLT SUDING GLASS DOOR ( 3 SECTIONS) CASING MOLE AS SELECTED BY OWNER PLAN (2) 2 "x4" 2 "x4" NAILED TO BOTH - SIDES OF TRUSSES ATTIC ACCESS OPENINGS -COORDINATE SIZE WITH TRUSS MANUFACTURER (20 "X36" MIN.) (2) 2 "x4" 3/4" PLYWOOD CUT TO FIT OPENING SIDE W/ METAL BACKING ON INTERIOR SIDE OF SPACE AND INSUL ON ATTIC SIDE. �3 12 FRONT ELEVATION S) SCALE: 1/4"=l'-O" 0 0 NEW WINDOWS TYPE EGRESS (BEDROOMS) RIGHT ELEVATION (E) SCALE: 1/4"=l'-O" WIND PRESSURE SCHEDULE (allowable) 0 0 � �0� o ZONE 4 ZONE 5 PRESSURE SUCTION FRONT ELEVATION S) SCALE: 1/4"=l'-O" 0 0 NEW WINDOWS TYPE EGRESS (BEDROOMS) RIGHT ELEVATION (E) SCALE: 1/4"=l'-O" WIND PRESSURE SCHEDULE (allowable) PANEL MARK AREA MARK ZONE 4 ZONE 5 PRESSURE SUCTION PRESSURE SUCTION 1, 2 & 6 20.0 DOOR 38.25 -41.64 38.25 -50.02 A, F & G 4.9 WINDOW 40.05 -43.44 40.05 -53.62 B 3.5 WINDOW 40.05 -43.44 40.05 -53.62 C 3.3 WINDOW 40.05 -43.44 40.05 -53.62 D 24.7 WINDOW 37.69 -41.08 37.69 -48.92 E 1.7 WINDOW 40.05 -43.44 40.05 -53.62 SIDE LITE 16.2 WINDOW 38.80 -42.19 38.80 51.12 a =3.88' SCHEDULE[ INSUL. AS PER WALL SEC] DRYWALL FINISH AS PER WALL SECT. bLu i i UiN 3/4" PLYWOOD CUT TO FIT OPENING SIDE W/ METAL BACKING ON INTERIOR SIDE OF SPACE AND INSUL. ON ATTIC SIDE. BOTTOM CHORD OF TRUSS CASING MOLDING AS SELECTED BY OWNER EXISTING ATTIC ACCESS PANEL DETAIL N.T.S. 0 LEFT ELEVATION W SCALE: 1/4"=l'-O" 0 0 O O REAR ELEVATION (N) SCALE: 1/4"=l'-O" [H] ❑❑ 0 aul TOP OF T.BEAM ELEV. + 8' -2" At-JINISH FLOOR ELEV. ELEV. 0' -0" ­^&I ..REVISIONS u�. THESE DRAWING & SPECIFICATIONS ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF RUBEN JUAN PUJOLWHETHER THE PROJECT FOR WHICH THEY WERE PREPARED IS EXECUTED OR NOT, THEY ARE NOT TO BE USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT EXCEPT BY AGREEMENT IN WRITING AND WITH THE APPROPRIATE COMPENSATION TO RUBEN JUAN PUJOL & ASSOCIATES Q W W LL Q Ld LLJ O _j V 00 Q M Gi = W c l- °a n o 2 z F Q.. a o W z -j Ct Ix W Q o U `� U t • Yc ao N ti N ^^ DATE 04/04/2013 DRAWN BY: GPC CHECKED BY: R.P. SCALE: AS SHOW A =3 SHEET 3 OF 7 ao N ti N ^^ L.J. ) o z v W W 0 � 1 W M N ob Z =° o I- C� Q co W ° N 0 O mv< �L W f1/ Q - M N Q O T IL DATE 04/04/2013 DRAWN BY: GPC CHECKED BY: R.P. SCALE: AS SHOW A =3 SHEET 3 OF 7