13-718-003GENERAL NOTES:
1.- ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE FLORIDA BUILDING CODE AND WITH THE
REQUIREMENTS OF THE MIAMI DADE COUNTY, STATE & NATIONAL LAWS AND CODES, ANY DISCREPANCIES BETWEEN THE
PLANS AND ABOVE REQUIREMENTS MUST BE CALL TO THE A /E'S ATTENTION BEFORE PROCEEDING WITH THE WORKS. THE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE PLANS,
2.- HE MUST FAMILIARIZE HIMSELF WITH THE CONTRACT DOCUMENTS BEFORE PROCEEDING WITH THE WORK AND
REPORT TO A/E TO CLARIFY ANY DISCREPANCIES; CONTRACTOR MUST COORDINATE THE WORK OF ALL TRADES AND
INSURE THAT ALL WORK CAN BE COMPLETE AS IT IS THE INTENT OF THE PLANS.
3.- CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS, INCLUDING SUBCONTRACTOR'S PERMITS, INSPECTIONS AND
APPROVALS FROM GOVERNING AGENCIES WITH JURISDICTION OVER THE PROJECT BEFORE BEGINNING WORK.
4.- ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH THE REQUIREMENTS OF THE UTILITY
COMPANIES INCLUDING THE CITY OF MIAMI DADE COUNTY PUBLIC WORKS DEPARTMENT, WHOSE SERVICES SHALL BE USED.
ALL MANUFACTURERS SHALL SUBMIT SHOP DRAWINGS TO THE A/E
5.- FOR APPROVAL PRIOR TO FABRICATION. THE A/E WILL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS,
6.- METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN
CONNECTION WITH THE WORK, AND HE WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE
WORK IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DOCUMENTS.
7.- ALL MATERIAL AND WORKMANSHIP SHALL MEET THE REQUIREMENTS OF THE APPLICABLE STANDARD
SPECIFICATION OF THE AMERICAN SOCIETY FOR TESTING AND MATERIALS.
8.- THE GENERAL CONTRACTOR MAY SUBSTITUTE EQUIPMENT AND /OR MATERIALS AS LONG AS SUCH CHANGES MEET
ALL F.B. CODE REQUIREMENTS ARE EQUAL TO THOSE SPECIFIED ON PLANS AND OBTAINS OWNER'S APPROVAL IN WRITING.
9.- CONTRACTOR SHALL SUBMIT DADE COUNTY PRODUCT CONTROL APPROVAL ROOFING & WATER PROOFING
COMPONENTS AND ALL OTHER FOR WINDOWS, PRODUCTS REQUIRING SAID APPROVAL
10.- WORKMANSHIP: ALL WORK SHALL BE PERFORMED IN A MANNER CONSISTENT WITH THE BEST PRACTICES FOR THE
RESPECTIVE TRADES AND QUALITY SPECIFIED. WORK NOT CONSISTENT WITH THE TRADE HIGHEST LEVEL OF WORKMANSHIP
WILL BE REJECTED. ANY WORK REJECTED SHALL BE REDONE AT CONTRACTOR'S EXPENSE. CORRECTION OF DEFECTIVE
WORK SHALL BE STARTED NOT LATER THAN FIVE DAYS AFTER NOTICE IS GIVEN THE CONTRACTOR, AND SHALL PROCEED
WITHOUT DELAY UNTIL WORK IS COMPLETED.
11.- CLEANUP: THE CONTRACTOR AND ALL TRADES SHALL AT ALL TIMES KEEP THE PREMISES CLEAN OF DEBRIS
ARISING OUT OF THE WORK AND FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS
OPERATIONS OR OTHER TRADES. THE CONTRACTOR SHALL PROVIDE AT ALL TIMES A TRASH CONTAINER ADEQUATE FOR
THIS JOB. THE CONTRACTOR SHALL DELIVER ALL WORK UPON COMPLETION OF THE JOB IN A CLEAN, READY -TO -USE
CONDITION. ALL FINISHED SURFACES SHALL HAVE PROTECTIVE COVERINGS REMOVED, AND SURFACES CLEANED OF ALL
MARKS, STAINS, SOIL, PAINT, OR ADHESIONS OF OTHER MATERIALS AND LEFT IN PERFECT CONDITION.
WINDOW SCHEDULE
MARK
CODE
WIDTH
HEIGHT
REMARKS
O
2HR -23
74"
38 3/8"
HORIZONTAL ROLLER XO EGRESS TYPE
O
2HR -1/2 33
53"
38 3/8"
HORIZONTAL ROLLER XO EGRESS TYPE
OC
SH -22
37"
26"
SINGLE HUNG CAT II (BATH)
Op
FIXED GLASS
8' -9"
74 1/4"
FIXED GLASS
O
SH -12
19 1/8"
26"
SINGLE HUNG CAT II (BATH)
OF
3HR -23
111
38 3/8"
HORIZONTAL ROLLER XOX
OG
2HR -23 +FW
12' -4"
63"
HORIZONTAL ROLLER XOX
j1TOP OF T.BEAM
ELEV. + 8' -2"
j1 FINISH FLOOR ELEV.
ELEV. 0' -0"
U FACTOR =1.08
SHGC =0.50
DOOR SCHEDULE
MARK
SIZE
WITH
TYPE
MATERIAL
FRAME
HARDWARE
REMARKS
Q
3'- 0 "X6' -8"
1 -3/4"
FLUSH
METAL
METAL
DEAD BOLT
EXTERIOR FRENCH DOOR
O
3'- 0 "X6' -8"
1 -3/4"
FLUSH
METAL
METAL
DEAD BOLT
EXTERIOR FRENCH DOOR
O
2'- 8 "X6' -8"
1 -3/4"
FLUSH
WOOD
WOOD
PRIVACITY
INTERIOR DOOR
O
2'- 8 "X6' -8"
1 -3/4"
FLUSH
METAL
METAL
24.7
FIRE RATED
5
2'- 6 "X6' -8"
1 -3/4"
BI -FOLD
WOOD
WOOD
WINDOW
BI -FOLD FULL
LOVERED
O6
8' -9" X74 1/4"
1 -3/4"
DOOR SUDING
METAL /GLASS
METAL
DEAD BOLT
SUDING GLASS
DOOR ( 3 SECTIONS)
CASING MOLE
AS SELECTED
BY OWNER
PLAN
(2) 2 "x4"
2 "x4" NAILED TO BOTH
- SIDES OF TRUSSES
ATTIC ACCESS OPENINGS
-COORDINATE SIZE WITH
TRUSS MANUFACTURER
(20 "X36" MIN.)
(2) 2 "x4"
3/4" PLYWOOD CUT
TO FIT OPENING SIDE
W/ METAL BACKING
ON INTERIOR SIDE
OF SPACE AND INSUL
ON ATTIC SIDE.
�3
12
FRONT ELEVATION S)
SCALE: 1/4"=l'-O"
0 0
NEW WINDOWS TYPE EGRESS
(BEDROOMS)
RIGHT ELEVATION (E)
SCALE: 1/4"=l'-O"
WIND PRESSURE SCHEDULE (allowable)
0 0
� �0�
o
ZONE 4
ZONE 5
PRESSURE
SUCTION
FRONT ELEVATION S)
SCALE: 1/4"=l'-O"
0 0
NEW WINDOWS TYPE EGRESS
(BEDROOMS)
RIGHT ELEVATION (E)
SCALE: 1/4"=l'-O"
WIND PRESSURE SCHEDULE (allowable)
PANEL
MARK
AREA
MARK
ZONE 4
ZONE 5
PRESSURE
SUCTION
PRESSURE
SUCTION
1, 2 & 6
20.0
DOOR
38.25
-41.64
38.25
-50.02
A, F & G
4.9
WINDOW
40.05
-43.44
40.05
-53.62
B
3.5
WINDOW
40.05
-43.44
40.05
-53.62
C
3.3
WINDOW
40.05
-43.44
40.05
-53.62
D
24.7
WINDOW
37.69
-41.08
37.69
-48.92
E
1.7
WINDOW
40.05
-43.44
40.05
-53.62
SIDE LITE
16.2
WINDOW
38.80
-42.19
38.80
51.12
a =3.88'
SCHEDULE[
INSUL.
AS PER
WALL SEC]
DRYWALL
FINISH
AS PER
WALL SECT.
bLu i i UiN
3/4" PLYWOOD CUT
TO FIT OPENING SIDE
W/ METAL BACKING
ON INTERIOR SIDE
OF SPACE AND INSUL.
ON ATTIC SIDE.
BOTTOM CHORD OF
TRUSS
CASING MOLDING
AS SELECTED BY
OWNER
EXISTING ATTIC
ACCESS PANEL DETAIL
N.T.S.
0
LEFT ELEVATION W
SCALE: 1/4"=l'-O"
0 0
O O
REAR ELEVATION (N)
SCALE: 1/4"=l'-O"
[H] ❑❑
0
aul
TOP OF T.BEAM
ELEV. + 8' -2"
At-JINISH FLOOR ELEV.
ELEV. 0' -0"
^&I
..REVISIONS
u�.
THESE DRAWING & SPECIFICATIONS
ARE INSTRUMENTS OF SERVICE AND
SHALL REMAIN THE PROPERTY OF
RUBEN JUAN PUJOLWHETHER THE PROJECT
FOR WHICH THEY WERE PREPARED
IS EXECUTED OR NOT, THEY ARE NOT
TO BE USED IN ANY MANNER ON OTHER
PROJECTS OR EXTENSIONS TO THIS
PROJECT EXCEPT BY AGREEMENT IN
WRITING AND WITH THE APPROPRIATE
COMPENSATION TO RUBEN JUAN PUJOL
& ASSOCIATES
Q
W
W
LL
Q
Ld
LLJ
O
_j
V
00 Q
M
Gi =
W c l-
°a n o
2
z
F Q..
a
o
W
z -j
Ct
Ix W
Q
o U
`�
U t •
Yc
ao
N
ti
N
^^
DATE 04/04/2013
DRAWN BY: GPC
CHECKED BY: R.P.
SCALE: AS SHOW
A =3
SHEET 3 OF 7
ao
N
ti
N
^^
L.J.
)
o
z
v
W
W
0
�
1
W
M
N
ob
Z
=°
o
I-
C�
Q
co
W
°
N
0
O
mv<
�L
W
f1/
Q
-
M
N
Q
O
T
IL
DATE 04/04/2013
DRAWN BY: GPC
CHECKED BY: R.P.
SCALE: AS SHOW
A =3
SHEET 3 OF 7