Loading...
10-338-025101.13' FF�oFDFFDTT- LINE EXISTING 4' H WIRE FENCE GENERAL PLUMBING NOTES: PLUMBING FIXTURE CONNECTION SCHEDULE 1, A. ALL WORK SHALL BE DONE in accordance With the Florida N 0. DESCRIPTION DRAIN WATER REMARK S Building Code and With all applicable regulations. COLD HOT B. DRAWINGS: Refer to all drawings for coordination of the p -1 WATER CLOSET 3" 1/2" __ FLUSH TANK, 1.28 GPF plumbing Work, C. ARRANGE AND PAY for all permits, licenses, inspections PROVIDE 1.0 GPM FAUCET and tests. Obtain the required certificates and present P -2 LAVATORY 1 1/4" 1/2" 1/2" to owner. D. GUARANTEE: The completed installation shall be fully " " " PROVIDE 1.5 GPM SHO RHEAD guaranteed against defective materials and /or improper P -3 ROMAN TUB 1 1/2 1/2 1/2 VVE PROVIDE ANTI -SCALD VALVE. Workmanship for a minimum of one year for material and labor. P_4 SHOWER 2" 3/4" 3/4" PROVIDE 1.5 GPM SHOWERHEAD AND RAINHEAD E. ALL HORIZONTAL SANITARY PIPING shall slope at 1/8 inch PROVIDE ANTI -SCALD VALVE. per foot minimum for 3" and larger and at 1/4" slope for 2" pipes and smaller. 1 AS SELECTED BY ARCHITECT. CLOTHES 2" / 2" 1 2" W / " P -6 PROVIDE RECESSED BOX, 2. SHOP DRAWINGS: Contractor shall submit for approval, Within GUY GREY T200 OR EQUAL , 30 days of signing contract, a minimum of five copies of fully descriptive literature, including but not limited to: Water heaters, and plumbing fixtures. No Work shall proceed Without the approval of these submittals. 3. PLUMBING FIXTURES: Fixtures shall be as selected by owner and shall be furnished and installed by this contractor. Fixtures shall be complete With drains, traps, supplies and any other accessory required. Fixtures and faucets shall comply With the SFBC Water saving standards. 4. MATERIALS: A, PIPING: a. Soil, Waste and vent, and storm: Sanitary pipe, PVC, DWV, PLUMBING SYMBOL LEGEND Schedule 40 under ground, and above ground. b. Domestic Water: Copper pipe, Type L With sweat Wrought 5YM50L DESCRIPTION copper fittings. Type "M" in concealed spaces is acceptable. Isolate piping from concrete With GAS PIPE insulating material, SANITARY PIPE c. Condensate drain: DWC PVC. d. Domestic Water supply assembly: Chrome finish tubing — — — i- PENT PIPE With angle shut off valves. —s- #- SAFEWASTE PIPE e. P & T Relief lines: DWV Copper pipe and fittings. Cp -- CONDENSATE PIPE f, Drain Pan lines: DWV PVC pipe and fittings. 0,47E VALVE " g. Insulation: Insulate all HW LINES With 1 C�' y U thick fiberglass - COLD WATER PIPE insulation, With self sealing jacket. _— NOT WATER PIPE �` � yn. h. Gas Piping: Sched. 40 black steel With threaded fittings. P- PLUMBING FIXTURE DESIGNATION 5. ALL AUTOMATIC ELECTRIC Water heaters shall meet the ECO FLUSH GLEAN OUT standards of the latest energy efficiency code. FLOOR PENETRATION 6, PIPING TEST AND DISINFECTIONS: �� � ti A. Test: All sanitary and domestic Water supply piping shall I SHOCK ARRESTOR TYPE "A" be tested for leafs before piping is concealed or connected to equipment and plumbing fixtures. WCO WALL CLEANOUT B. Disinfection: All domestic Water piping shall be VTR VENT THRU ROOF disinfected by introducing a solution of calcium hypochlorite of 50 parts per million of chloride and as COOL CLEANOUT ON GRADE per WAN A A Standards. Vti 7. VALVES: Domestic Water valves shall be of bronze body, HOSE BIBB WITH a ends VACUUM BREAKER sWe t <ka, 8. HOSE BIBBS: Shcli ua 3/4 inch, rough brass construction With SHUT OFF VALVE t shut off valve and vacuum breaker. ON RISER. 9. ALL OUTDOORS FLOOR clean outs shall be terminated up to grade and shall be marked. AAV AIR ADMITTANCE VALVE �, k (STUDOR MINI -VENT) 10. CONTRACTOR SHALL COORDINATE exact location of all plumbing system piping before starting any Work. Notify CONNECT TO EXISTING PIPE. VERIFY EXACT Architect /Engineer of any deviations from design drawings. 11. CONTRACTOR SHALL saW cut or core drill existing slabs to install SIZE, LOCATION, INVERT &CAPACITY ne Work. Patch slabs to match existing. I COMMENCEMENT OF Ww g N FIELD PRIOR TO CO WORK. NOTIFY ARCHITECT & ENGINEER OF ANY DISCREPANCIES. GAS IWH INSTALLATION DETAIL TYPICAL CLEANOUT DETAIL 0 I. 'iif kJT 1S' ASFNAL T F'AVF EN'i' `' n - - -- —_ p ■���� i■��� a i�� Saw1m Ca dficde of AWhodudw 19743 JVl.l0 VJDA4 Ta MA REGUM17ON 0SIU s w ' o`P �?'95205�'40ST SUITE201 Telephone 305- 480 -9361 AffAf^ M 33164 .Facsimile 30--480-9327 ' ' -- a a a ` .! Project.Managerr ROGER L. PERF.Z e- mall:rperezjr @be//south.net -op- I I 1, 7168 S� pf a t� { F a