Loading...
13-1218-043POWER SUPPLY AND 6' —N20 INTERCONNECTING —02 CABLE(PROVIDED) _4> 115V DUPLEX OUTL= 7 TO TRE. SUPPLIED AND INSTALLED BY 0 9 CONTRACTOR WITHIN 4' OF z MANIFOLD i cII LINES TO OUTLETS (7), D.I.S.S. 0 A" VALVES (7C), OR ZONE N VALVE (34A) DEPENDING ON_,,- RED BLUE APPLICATION. SEE PLAN. C THE ELECTRICIAN SHALL EXTEND L/V CABLE (100' PROVIDED) BETWEEN THE MANIFOLD AND ZONE VALVE (IF REQUIRED), ALARM PANEL (34) THE ELECTRICIAN SHALL EXTEND L/V CABLE (100' PROVIDED) BETWEEN THE MANIFOLD AND ALARM PANEL. ZONE VALVE (34A) —N20 REQUIRED WHEN THE TANK —02 ROOM IS LOCATED _4> OUTSIDE OR ON ANOTHER TO TRE. FLOOR OF THE FACILITY ROOMS AIR TECH REGULATORS (PROVIDED) 2 X 10 BLOCKING FLUSH WITH STUDS CYLINDER RESTRAINTS (PROVIDED) SEE PLAN AND DETAILS OF SYSTEM COMPONENTS FOR MORE INFORMATION too* *00 U a 0 • o ul�00Q F—V 0 %, • V 0 • 0 e & ---------------------------- - --- ..................... .... .. . .. .. . ---------------- - ----------- MIDMARK THIS DETAIL IS FOR INFORMATIONAL PURPOSES ONE '�. RJERTOMANUFACTURER'S INSTALLATION GUIDE FOR WHITE ADDITIONAL INFORMATION. AIR TECH U 0 w a 0 -Zi I I INSTALLATION REQUIREMENTS: L),ffmmliq TO ASSURE SAFE OPERATION AND CONFORMATION : TO LOCAL FIRE CODES, ALL PORTER INSTRUMENT BROWN YELLOW MANIFOLD SYSTEMS ARE DESIGNED TO BE USED Wl'i'll SED� _ :ON DELIVERY SYSTEMS MOUNTED INSIDE WALLS, , RED BLUE AND THEY MEET OR EXCEED THE GUIDELINES ESTABLISHED BY THE NATIONAL FIRE PROTECTION AS_,C,&ATION. WHITE RED FOR NONFLAMMABLE MEDICAL GAS SYSTEMS, NFPA 99. COPIES OF NFPA 99 OR PORTIONS THER�MAy OBTAINED BY WRITING TO: u NATIONAL FIRE PROTECTION ASSOCIATION BATTERYMARCH PARK, QUINCY, MA 02269-9904 OR CALL: 1-800-34• 3555 TANK ROOM GUIDELINES: 1. MUST BE IN A SEPARATE ROOM OR CABINET THAN COMPRESSORS OR OTHER EQUIPMENT. 2. A DRYWALL STUDDED ROOM WITH A ONE HOUR FIRE RATING WILL SUFFICE. 3. DOOR SHOULD LOCK. 4. ROOM SHOULD BE VENTED (72 SQ. IN.'MINIMUM). A V,--',N IN THE DOOR WILL SUFFICE ONLY IF NO OTHER X7 OPTION FOR VENTING TO EXTERIOR IS AVAILABLE. K'XfTACH TANK RESTRAINERS WITH LAG SCREWS. INSTALL 40" FROM THE FLOOR. 6. TANK ROOM INSTRUCTIONS AND CAUTION FOR NON -I'1. wMABLE MEDICAL GASES IN USE MUST BE POSTED. DENTAL DEALER'S RESPONSIBILITIES: 1. VERIFY THAT THE SYSTEM HAS BEEN TESTED FOR LEAKS. 2. INSTALL WALL MOUNTS OR CABINET MOUNTS IN APPROPRIATE LOCATIONS. 3. INSTALL COVER PLATES ON OUTLET STATIONS, 4. INSTALL FLOWMETER HEADS. 5. TEST THE SYSTEM FOR CROSSED LINES, REFER TO SECTION "TEST FOR CROSSED LINES" UNDER PLUMBERS INSTRUCTIONS AND PERFORM TEST. DO NOT ASSUME THE SYSTEM HAS BEEN TESTED. 6. TEST FOR FAILSAFE OPERATION. LEVEL III FACILITY 7 CHECK ALARM TANK RO S. DEMONSTRATE SYSTEM TO DOCTOR. WITH LESS THAN 3000 CU. FT. GAS (INCLUDING \ i STORAGE r-Yf-1 HnIM MITIP EN) SEE MANUFACTURER'S INSTALLATION GUIDE FOR CONTR X., rOR'S RESPONSIBILITIES SPARE CYLINDERS (OPTIONAL) MUST ALSO BE RESTRAINED TO WALL. LEVEL III SYSTEMS INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING REQUIREMENTS: 1. NO MORE THAN 3000 CU. FT. TOTAL CAPACITY OF ALL GASES (EXCLUDING NITROGEN) CONNECTED AND IN STORAGE AT ONE TIME. 2. ENCLOSURE FOR SUPPLY SYSTEMS SHALL BE PROVIDED WITH DOORS OR GATES THAT MAY BE LOCKED, 3. DOORS TO SUPPLY SYSTEM STORAGE LOCATIONS SHALL BE PROVIDED WITH A LOUVERED OPENING HAVING A MINIMUM OF 72 SQ. IN. TOTAL FREE AREA. BUT, LOUVER IS ONLY NEEDEC HEN NO OTHER VENTING IS POSSIBLE, 4. EACH CYLINDER OF GAS SHALL HAVE A LISTED PRESSURE REGULATOR DIRECTLY CONNECTED. 5. A PRESSURE RELIEF VALVE SET AT 50 PERCENT ABOVE (75 PSIG.) NORMAL LINE PRESSURE (50 PSIG). 6. A SHUT-OFF VALVE OR CHECK VALVE SHALL BE INSTALLED DOWNSTREAM OF EACH PRESSURE REGULATOR. 7. A PRESSURE GAUGE SHALL BE INSTALLED IN THE MAIN LINE ADJACENT TO THE ACTUATING SWITCH... IT SHALL BE APPROPRIATELY LABELED. B. PIPING SHALL BE SEAMLESS TYPE K OR L (ASTM B88) COPPER TUBING... SHALL BE THOROUGHLY CLEANED OF OIL GREASE... AND BE TEMPORARILY CAPPED OR PLUGGED TO PREVENT RECONTAMINATION. 9. FLEXIBLE CONNECTORS OF OTHER THAN ALL-METAL CONSTRUCTION USED TO CONNECT OUTLETS OF PRESSURE REGULATORS TO FIXED PIPING SHALL. HAVE A MINIMUM BURST PRESSURE OF 1000 PSIG AND SHALL NOT PENETRATE WALLS, FLOORS, CEILINGS, OR PARTITIONS. 10. BEFORE CLOSING OF THE WALLS, EACH SECTION OF THE PIPING SYSTEM, EXCLUDING MANIFOLD, SHALL BE SUBJECTED TO A MINIMUM TEST PRESSURE OF 150 PSIG WITH OIL-FREE, DRY AIR OR NITROGEN. THIS TEST PRESSURE SHALL BE MAINTAINED UNTIL EACH JOINT HAS BEEN EXAMINED FOR LEAKAGE, AND ANY LEAKS LOCATED SHALL BE REPAIRED AND RETESTED AS ABOVE. AFTER TESTING AS ABOVE, THE COMPLETELY ASSEMBLED PIPING SYSTEM SHALL RE SUBJECTED TO A 24-HOUR STANDING PRESSURE TEST AT 20 PERCENT ABOVE THE NORMAL OPERATING LINE PRESSURE USING REQUIRED TEST GAS. 11. PIPING SYSTEMS, WITH THE EXCEPTION OF NITROGEN SYSTEMS, SHALL BE CAPABLE OF DELIVERING 50 TO 55 PSIG TO ALL OUTLETS AT THE MAXIMUM FLOW RATE. 12. ALL BRAZED JOINTS IN THE PIPING SHALL BE MADE UP USING BRAZING FILLER ALLOYS THAT BOND WITH THE BASE METALS BEING BRAZED AND THAT COMPLY WITH " "SPECIFICATIONS FOR BRAZING FILLER METAL," ANSI/AWS A5.8. A) COPPER-TO-COPPER JOINTS SHALL BE MADE USING A COPPER-PHOSPHORUS BRAZING FILLER ALLOY (SCUP SERIES) WITHOUT FLUX. B) DISSIMILAR METALS SUCH AS COPPER AND CRASS SH,:.LL BE JOINED USING AN APPROPRIATE FLUX WITH EITHER A COPPER-PHOSPHORUS (SCUP SERIES) OR A SILVER (BAG SERIES) BRAZING FILLER ALLOY. APPLY FLUX SPARINGLY AND IN A MANNER TO AVOID LEAKING ANY EXCESS INSIDE OF COMPLETED JOINTS. USE OF PREFLUXED ROD IS ACCEPTABLE. 13. AUDIBLE AND NON-CANCELABLE VISUAL SIGNALS SHALL INDICATE IF THE PRESSURE IN THE MAIN LINE INCREASES OR DECREASES 20 PERCENT FROM THE NORMAL OPERATING PRESSURE, AND SHALL BE INSTALLED IN THE OFFICE OR PRINCIPAL WORKING AREA OF THE INDIVIDUAL RESPONSIBLE FOR THE MAINTENANCE OF THE MEDICAL GAS SYSTEM, TO ASSURE CONTINUOUS SURVEILLANCE. 14. WHERE THE CENTRAL SUPPLY IS REMOTE FROM THE MEDICAL GAS SYSTEMS USE POINTS, THE MAIN SUPPLY LINE SHALL BE PROVIDED WITH A SHUT-OFF VALVE SO LOCATED IN THE TREATMENT FACILITY AS TO BE ACCESSIBLE FROM USE-POINT LOCATIONS IN AN EMERGENCY. 15. OUTLET STATIONS SHALL BE DESIGNEE) SO THAT PARTS OR COMPONENTS THAT ARE REQUIRED TO BE GAS SPECIFIC CANNOT BE INTERCHANGED BETWEEN STATION OUTLETS FOR DIFFERENT GASES. 16. LABELING SHALL APPEAR ON THE PIPING AT INTERVALS OF NOT MORE THAN 20 Fr. AND AT LEAST ONCE IN EACH ROOM AND EACH STORY TRAVERSED BY THE PIPING SYSTEMS. ACCUTRON GUARDIAN, GUARDIAN 11 N20,, 02 SYSTEM MANIFOLD (k D-33 NOT TO SCALE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR FOLLOWING ALL LOCAL CODES FOR ROUGH INSTALLATION. ELECTRICIAN TO PROVIDE AND PULL 1813 LOW VOLTAGE WIRE BETWEEN THIS BOX AND EACH COMPONENT. LABEL EACH WIRE FOR FINAL CONNECTION. THIS PANEL CONTROLS: (2) AIR COMPRESSORS (2) VACUUM PUMPS WATER SHUT-OFF VALVE ----------------- CONTROL PANEL REFERENCE CROSS WIRING BRAND WIRE B (LIGHT) c MIDMARK BLUE WHITE RED AIR TECH YELLOW BROWN ORANGE1 DENTALEZ BLACK BROWN YELLOW MATRX APOLLO RED BLUE BLUE WHITE WHITE RED NOTE: INSTALL CONTROL PANEL ACCORDING TO LOCAL CODES. ALTHOUGH CONTROL PANEL CAN BE INSTALLED DIRECTLY INTO SHEET ROCK, MANY LOCAL CODES REQUIRE USE OF A JUNCTION BOX. DRYWALL CUT-OUT �3/16'" DIA. PILOT HOLES FOR ANCHORS CONTROL PANEL CONTROL PANEL PROVIDED BY HENRY-SCHEIN DENTAL, FINAL CONNECTION BY HENRY SCHEIN DENTAL. SEE MANUFACTURER'S INSTALLATION MANUAL FOR MORE DETAIL. ,�MIDMARK CONTROL PANEL n A - "J NOT TO SCALE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOP FOLLOWING ALL LOCAL CODES FOR ROUGH INSTALLATION. HENRY SCHEIN TO MAKE FINAL CONNECTIONS. ELECTRICIAN TO INSTALL A TWO-GANG JUNCTION BOX WITH MUD RING (PROVIDED BY MANUFACTURER). RUN 3/4" CONDUIT FROM BOX TO 3" ABOVE CEILING (CONTINUOUS -10 MANIFOLD (33) WHEN PLENUM SPACE IS NOT ACCESSIBLE). ELECTRICIAN TO RUN L/V CABLING (100' PROVIDED BY MANUFACTURER) BETWEEN ALARM PANEL AND NITROUS OXIDE MANIFOLD (33) AT FINISH. COIL 6-8" OF CABLE WITHIN BOX FOR FINAL CONNECTION TO ALARM PANEL.— 2x WALL STUD SEE MANUFACTURER'S INSTALLATION MANUAL FOR MORE INFORMATION. ACCUTRON GUARDIAN ALARM PANEL, NOT TO SCALE .... . . ... . . . ...... . ..... I I ------------- ..... ....... N I I ----------- - ------ DRAWING NAME: SOUTHMIAMI-F PROJECT START DATE: 07/02/2013 FINALS START DATE: 09/10/2013 DRAWN BY: OTI--IET\§ FINALS BY TAS -CHECKED BY: JBKl U z 7. LIJ _T u ry z LU I-