Loading...
13-1218-037PROPOSED DENTAL PLUMBING SPECIFICATIONS PLUMBING NOTES 1. THIS SPECIFICATION SHEET IS INTENDED AS A GUIDE FOR TRADESMEN. THE FLOOR PLANS ENCLOSED HEREIN ARE SUGGESTIONS FOR THE PLACEMENT OF DENTAL EQUIPMENT. THEY ARE NOT INTENDED FOR CONSTRUCTION, 2. EXACT EQUIPMENT LOCATIONS MUST BE JOB SITE VERIFIED BY THE HENRY SCHEIN DENTAL EQUIPMENT SPECIALIST. 3. FOLLOW MANUFACTURER'S DRAWINGS FOR EXACT REQUIREMENTS FOR ANY EQUIPMENT SUPPLIED BY HENRY SCHEIN DENTAL. CONSULT WITH HENRY SCHEIN DENTAL REP FOR ADDITIONAL INFORMATION. 4. WATER PRESSURE MUST NOT EXCEED 50 PS1 AT ALL DENTAL UNITS. 5. BACK -FLOW PREVENTION IS REQUIRED ON ALL LINES AS PER LOCAL CODE. VACUUM NOTES THE VACUUM PIPING LAYOUT HAS A LARGE EFFECT ON THE EFFICIENCY AND RELIABILITY OF THE DENTAL VACUUM SYSTEM. REFER TO MANUFACTURER'S PRE - INSTALLATION GUIDE PROVIDED BY HENRY SCHEIN EQUIPMENT SALES SPECIALIST (ESS) FOR SPECIFIC SIZING OF STUB -UP, TRUNK, AND BRANCH LINES. IT IS HIGHLY RECOMMENDED THAT VACUUM LINES RUN UNDERNEATH DENTAL EQUIPMENT BY MEANS OF TRENCHING/ CORING (CONCRETE SLAB) OR IN SUB FLOOR (BASEMENT/ CRAWL SPACE). ALL LINES ARE TO BE DESIGNED WITH PVC PIPING UNLESS DICTATED BY LOCAL CODES TO USE COPPER OR CAST IRON. TO ENSURE OPTIMUM VACUUM PERFORMANCE, INSTALL MAIN LINE DIRECTLY BELOW THE DENTAL CHAIR, CABINET OR WALL JUNCTION BOX TO REDUCE OR ELIMINATE BRANCH LINE RUNS WHEREVER POSSIBLE. I. STUB -UP TERMINATE VACUUM TRUNK LINE IN MECHANICAL ROOM W/ VERTICAL STUB -UP 3" A.F.F. PLUMBING CONTRACTOR TO PROVIDE FPT ADAPTOR ON END OF STUB -UP, SIZE OF ADAPTOR TO BE DETERMINED BY TRUNK AND PUMP INTAKE PIPE SIZES, IN THE CASE OF DUAL TRUNK LINE SYSTEM, PROVIDE ENOUGH SPACE BETWEEN STUB -UPS TO INSTALL TEES ON BOTH LINES. 2. TRUNK LINE(S) VACUUM TRUNK LINES(S) TO BE SUPPORTED EVERY 6-0" TO PREVENT SAG AND SLOPED A MINIMUM OF 114" PER 10' -0" TOWARD THE VACUUM PUMP, 3. BRANCH LINE(S) BRANCH LINES ARE TO BE "SWEEPING" 90 DEGREE TURNS TO AVOID VACUUM LOSS. A "Y" TEE FITTING SHOULD BE USED WHEN AVAILABLE TO BRANCH TWO LINES TOGETHER, so BRANCH LINE CONFIGURATIONS w SUB FLOOR V, < 45' ELIOWS \� J J < TEE FITTING z HEREIN. . MAIN LINE w f f. (� z c� C o z s' DESCRIPTION o © DO NOT PIPE TRUNK LINE IN A SERIFS Z w FLOW MANNER LOOPING FROM J -BOX TO C4 J -BOX. A CONTINUOUS TRUNK LINE MUST W w TO BE MAINTAINED FROM THE PUMP TO THE o � PUMP FURTHEST J -BOX USING BRANCH LINES OFF U x OF THE TRUNK LINE TO PICK UP EACH z> FLOW J -BOX OUTLET. TRUNK LINE MAY FOLLOW z 0> DRAIN LINE TRENCHES WITHIN REASON. � U USE ONLY 451DEGREE EL'S. DO NOT USE UTILITY CENTER - CONTRACTOR TO PROVIDE REQ'D UTILITIES. BACK FLOW PREVENTION DETAIL A ANY 90° EL'S. ALL SUB FLOOR SCH 40 PVC (USE FOR ALL SUB FLOOR CONNECTIONS ARE TO BE PLUMBED WITH INTERSECTIONS) 45' EL'S USING DETAIL A FOR TEEING BRANCH LINE CONNECTIONS INTO TRUNK 5 LINE. REQUIRED AS PER LOCAL CODE. SPECIAL NOTE: IF VACUUM LINES ENCROACH ON EITHER A WALL OR COLUMN FOOTING, USE 45 DEGREE ELBOWS TO PIPE AROUND FOOTING SO PIPE REACHES PROPER LOCATION. SEE SHEETS SPE.1 & SPE.2 FOR ILLUSTRATIONS & DETAILS PLUMBING SPECIFICATIONS IjLE:ASE NOTE: ALL REQUIREPERTS T0 BE VERIFIED BY MANUFACTURER'S SPEC UTILITIES SHEETS PROVIDED BY HENRY SCHEIN DENTAL EQUIPMENT SPECIALIST. INT.SQ.FT.= BY OTHERS so MANUFACTURER'S SPECS SUPERSEDE ANY AND ALL INFORMATION CONTAINED w V, < J J < z HEREIN. . w (� z c� C o z w DESCRIPTION o © 3 0 Z w C4 Lu 0 W w 0 o � U x ❑< z> z 0> � U UTILITY CENTER - CONTRACTOR TO PROVIDE REQ'D UTILITIES. BACK FLOW PREVENTION 5 1 REQUIRED AS PER LOCAL CODE. ' 0 1 22 3 UTILITY CENTER - CONTRACTOR TO PROVIDE REQ'D UTILITIES. RACK FLOW PREVENTION ' 3 REQUIRED AS PER LOCAL CODE. N20,02 AND VACUUM OUTLET STATION - CONTRACTOR (MED GAS CERTIFIED WHERE REQUIRED BY CODE) TO PROVIDE REQ'D UTILITIES. OUTLET STATION PROVIDED BY HENRY SCHEIN 10 DENTAL, INSTALLED BY CONTRACTOR (WHEN REQUIRED). SILVER SOLDERED TO TYPE K OR L COPPER LINES, 3/8" OD NITROUS AND 1/2" OD OXYGEN COMING FROM THE SYSTEM MANIFOLD. 1/2" O.D. VACUUM BRANCH FROM MAIN VACUUM TRUNK LINE. SEE HENRY SCHEIN DENTAL EQUIPMENT SPECIALIST FOR EXACT LOCATIONS. FOLLOW NFPA CODES. STANDARD SINK & FAUCET - CONTRACTOR TO PROVIDE AND INSTALL REQ'D UTILITIES, SINK 22 11A AND FAUCET. MANUFACTURER AND STYLE DETERMINED BY OWNER. FINAL CONNECTIONS BY • • CONTRACTOR. 6 13 AIR LINE AND VALVE - CONTRACTOR TO PROVIDE REQ'D UTILITES. TERMINATE WITH A 3/8" + 13 COMPRESSION STOP. 2 15 ULTRASONIC CLEANER - CONTRACTOR TO PROVIDE REQ'D UTILITIES. CLEANER SUPPLIED AND 15 INSTALLED BY HENRY SCHEIN DENTAL. 2 16 MODEL TRIMMER - CONTRACTOR TO PROVIDE REQ'D UTILITIES. MODEL TRIMMER SUPPLIED AND ' ' 16 INSTALLED BY HENRY SCHEIN DENTAL. BACK FLOW PREVENTION REQUIRED PER CODE. 2 17 PLASTER TRAP - SUPPLIED BY HENRY SCHEIN DENTAL, INSTALLED BY CONTRACTOR ON SINK 16 DRAIN LINE. DENTAL AIR COMPRESSOR (AIRSTAR 70) - FOR GAS - DRIVEN DEVICES IN A LEVEL 3 FACILITY, CONTRACTOR TO PROVIDE REQ'D UTILITIES AND FRESH -AIR INTAKE VENT. 1/2" LD. COPPER TYPE 1 25 K OR L SUPPLY LINES TO LOCATIONS THAT REQUIRE AIR. SUCK BOOST TRANSFORMER SUPPLIED 25 AND INSTALLED BY CONTRACTOR (IF REQ'D). FINAL CONNECTIONS BY CONTRACTOR. REFER TO NFPA 99, 2005, 5.3.3.5 FOR REGULATIONS & REQUIREMENTS. DENTAL AIR COMPRESSOR (AIRSTAR 50) - FOR GAS - DRIVEN DEVICES IN A LEVEL 3 FACILITY. CONTRACTOR TO PROVIDE REQ'D UTILITIES AND FRESH -AIR INTAKE VENT. 1/21D. COPPER TYPE 1 25 K OR L SUPPLY LINES TO LOCATIONS THAT REQUIRE AIR. BUCK BOOST TRANSFORMER SUPPLIED 25 AND INSTALLED BY CONTRACTOR (IF REQ'D). FINAL CONNECTIONS BY CONTRACTOR. REFER TO NFPA 99, 2005, 5.3.3.5 FOR REGULATIONS & REQUIREMENTS. VACUUM PUMP (DRY) - CONTRACTOR TO PROVIDE REQ'D UTILITIES, SCH 40 PVC MAIN TRUNK LINES (WHERE PERMITTED BY CODE). TRUNK, REDUCTION AND BRANCH LINE SIZES PER MFR RECOMMENDATIONS. EXHAUST PUMP TO OUTSIDE. BACK FLOW PREVENTION REQ'D PER 2 27A LOCAL CODE. COLLECTION CANISTER (CAS) SUPPLIED BY HENRY SCHEIN DENTAL, INSTALLED • . . 27A BY CONTRACTOR. BUCK ROOST TRANSFORMER SUPPLIED AND INSTALLED BY CONTRACTOR (IF REQ'D). FINAL CONNECTIONS BY CONTRACTOR. PROVIDE WATER LINE WITH HOSE BIB NEAR UNIT. VACUUM INLET - CONTRACTOR TO PROVIDE A 1/2" PVC $RANCH WITH TERMINATION FITTING 2 2E FROM MAIN TRUNK LINE, VERIFY HEIGHT AND LOCATION WITH HENRY SCHEIN DENTAL • 28 EQUIPMENT SPECIALIST. DUST COLLECTOR VACUUM INLET - CONTRACTOR TO PROVIDE A 1 1/2" PVC BRANCH WITH 1/2" 4 28A TERMINATION FITTING FROM DUST COLLECTION UNIT. VERIFY HEIGHT AND LOCATION WITH • HENRY SCHEIN DENTAL EQUIPMENT SPECIALIST. WATER SOLENOID W /FILTER - CONTRACTOR TO PROVIDE REQ'D UTILITIES. SOLENOID SUPPLIED 1 30A RY HENRY SCHEIN DENTAL, INSTALLED BY CONTRACTOR ON COLD WATER SUPPLY LINE (FOR • 30A DENTAL EQUIPMENT ONLY). N20 -02 SYSTEM MANIFOLD - CONTRACTOR TO PROVIDE REQ'D UTILITIES. MANIFOLD SUPPLIED 1 33 BY HENRY SCHEIN DENTAL, INSTALLED BY CONTRACTOR. SILVER SOLDERED K OR L COPPER ' • 33 TRUNK LINES RUNNING TO EACH TREATMENT ROOM. CONTRACTOR TO PRESSURE TEST LINES SEPARATELY WITH DRY NITROGEN AT 150 PSI FOR 24 HOURS. FOLLOW NFPA CODES. U V J uj Z w Z N O� U Z 00 w 6 Q � r- 0 SD _.I w 0 0 CL r7 F- � 5F CY7 W LL �� II li � I 0 U O HENRY SCHEIN REP: JOHN TURNER CENTER: WEST PALM BEACH PHONE fit: 800 645 -6594 w ~ LL z Z OzO (D ui`r Q E-- � I-- >_ �u OUWw IL u- F w > w Z W w C) O < > Z' =0_' =� ►.� 4U wp 7) �n < F-" -r FL—u ,I- uj p "- 0 zLL j 04 n < 0 -� U� <O❑Z Q zcLo a —Ly lu D-�C0`nF--) W❑ z O Z U� < <0w0 A U U < = o < Lu ►-> -Z Lu "- cn w w Z Q w Q Z in UZw O z 00 ❑UQU w ❑U3 :> jZ _ w � w aj 2 ~ "- LL � -opt I DRAWING NAME: SOUTHMIAMI -F PROJECT START DATE: 07/02/2013 FINALS START DATE: 09/10/2013 DRAWN BY: OTHERS FINALS BY: TAS CHECKED BY: JBK REVISIONS: INT.SQ.FT.= BY OTHERS SCALE: SHT. SIZE: 3/16 " =1' -0" D I P L U M EE'N( F LAN D z LL z u 2 c C