13-1218-026GENERAL_ PLUMBING NOTES
1. A. ALL WORK SHALL. BE DONE in accordance with the 2.010 Florida
Building Code and with all applicable regulations.
B. DRAWINGS: Refer to all drawings for coordination of the
plumbing work.
C. ARRANGE AND PAY for all permits, licenses, inspections
and tests. Obtain the required certificates and present
to owner.
D. GUARANTEE: The completed installation shall be fully
guaranteed against defective materials and /or improper
workmanship for a minimum of one year for material and
labor.
E. ALL HORIZONTAL SANITARY PIPING shall slope at 1/8 inch
per foot minimum for 3" and larger and at 1/4" slope
for 2 1/2" pipes and smaller.
F. ALL materials shall be new, free of defects and correctly
labeled with their appropriate listing agency.
2. SHOP DRAWINGS: Contractor shall submit for approval, within
30 days of signing contract, a minimum Of five Copies of fully
descriptive literature, including but not limited to: water
heaters, and plumbing fixtures. No work shall proceed without
the approval of these submittals.
1 PLUMBING FIXTURES: Fixtures shall be as selected by owner
and shall be furnished and installed by this contractor. Fixtures
shall be complete with drains, traps, supplies and any other
accessory required. Fixtures and faucets shall comply with the
FBC Water saving standards.
4. MATERIALS:
A. PIPING:
a. Soil, waste and vent, and storm: Sanitary pipe, Cast Iron
under ground, Schedule 40 above ground,
All no HUB connections shall be with cast iron
coupling. All piping in return plenurns shall be cast
iron.
b. Domestic water: CPVC pipe and fittings.
c. Domestic water supply assembly: Chrome finish tubing
with angle shut off valves in exposed areas.
d. P &T Relief lines: CPVC pipe and fittings
e. Drain Pan lines: DWV PVC pipe and fittings.
f. Insulated all hot water and condensate drain piping.
5. PIPING TEST AND DISINFECTION&
A. Test: All sanitary and domestic water supply piping shall
be tested for leaks before piping is concealed or connected
to equipment and plumbing fixtures.
B. Disinfection: All domestic Water piping shall be
disinfected by introducing a solution of calcium
hypochlorite of 50 parts per million of chloride and as
per AWWA Standards.
6. VALVES: Domestic water valves shall be of bronze body,
sweat ends.
7. CONTRACTOR SHALL COORDINATE exact location of all
plumbing system piping before starting any Work. Notify
Architect /Engineer of any deviations from design drawings.
8. CONTRACTOR SHALL provide all necessary labor and materials
for a complete "turn —key" plumbing system.
9. CONTRACTOR SHALL keep accurate as —built dwgs, on the
field and provide them to owner once the job is complete.
10. CONTRACTOR SHALL familiarize himself with job site and
with all construction documents including architectural,
electrical, HVAC, and structural dwgs, prior to bidding.
Adjustments in the plumbing system to accomodate other
disciplines should be expected, and shall not represent
additional costs to owner. Notify Architect /Engineer of any
discrepancies prior to commencement of work.
11. Provide wall cleanouts at the base of every stack.
12. CONTRACTOR SHALL obtain insurance to protect against
public liability and property damage for the duration of work.
13. CONTRACTOR SHALL use dimensions in architectural drawings
to rough —in plumbing work.
PLUMBING SYMBOL LEGEND
- - - - -- -- .._- .._ .....
SYMBOL
......... _....____ --
DESCRIPTION
^^^ ----
SANITARY LINE
— — -
VENT LINE
SD
STORM DRAIN LINE
-
SAFEWASTE LINE
CD
CONDENSATE LINE
{ --
GATE VALVE
—
COLD WATER LINE
- -
HOT WATER LINE
P-
PLUMBING FIXTURE DESIGNA11ON
AAV
AIR ADMITANCE VALVE
FCO
FLOOR CLEAN OUT
C.I�
FLOOR PENETRATION
1.50
MECHANICAL SHOCK
_ —�
ARRESIOR
WCO
WALL. CLEANOUT
VTR
VENT THRU ROOF
COVER SECURED
WITH SCREWS
THREADED C,O, PLUG
rrni rnnnr
4 X 6" DIA. CONCRETE
PAD FLUSH W /FIN, GRADE
MAXIMUM FLOW RATES AND CONSUMPTION
TABLE 604.4
PLUMBING FIXTURE
FLOW RATE
FLOW PRESSURE
OR FIXTURE FITTING
(gprn)
(psi)
LAVATORY, PRIVATE
1.0
60
LAVATORY, PUBLIC, (METERING)
0.25 gallon
AS PER ARCHITECTURAL
LAVATORY
per metering
- - --
1/2"
cycle
AS PER ARCIIIIECTURAL
LAVATORY, PUBLIC, (OTHER THAN METERING)
0.50
60
SHOWER HFAD
1.50
80
SINK FAUCET
1.50
60
WATER CI.. -OSET
1.28 gallons per
AS PER ARCHITECTURAL
HAND SINK
flushing cycle
2"
DISHWASHER (RESIDENTIAL)
6.5 gals. per cycle or
AS PER ARCHIIEC1URAL
less (energy star /water
- - --
cn
sense certified)
WASHING MACHINES
water factor of 8 or lower
E
(energy star /water sense
- - --
a
certified)
TYPICAL CL.EANOUT DETAIL
I
SLIP JOINT
EXTERIOR TYPE
F-1 FI FI R
WAI_L
FACE_ OF WALL
STAINLESS STEEL COVER
SCREWLD TO THREADED
C,O, PLUG,
PLUMBING FIXTURE CONNECTION SCHEDULE
DESCRIPTION
WASTE
VENT
WATER
REMARKS
COLD
HOT
TANK WATER CLOSET
3"
- --
1/2"
- --
AS PER ARCHITECTURAL
LAVATORY
2"
2"
1/2"
1/2"
AS PER ARCIIIIECTURAL
SHOWER
2"
- --
1/2"
1/2"
AS PER ARCLIIIECTURAL
KITCHEN SINK
2"
2"
1/2"
1/2"
AS PER ARCHITECTURAL
HAND SINK
2"
2"
1/2"
1/2"
AS PER ARCHIIEC1URAL
cn
NOTES: 1.— All exposed trim, such as P— traps, angle stops, and supplies shall be chrome plated.
2. - -- All fixtures shall comply with Reference Standards as per 2010 FBC Plumbing 406 through 421.
SHUT-OFF -
VALVE (opt.
112" H
12" CW
SHUT -OFF
VALVE (opt.)
INSTANTANEOUS WATER HEATER
X11 S
WATER HEATER NOTES
MODEL
MAX, 0V
AT 22ov
VOLTS
AT 220VP5
MANUFACTURER
PIPE
ITTTING
_ -_
Lf
_
–N -85
— 1.5
220
39
TITAN –SCR2
112"
.98
E- mail: PROJEC'I'SOGULIRRER000N
CA# 0007612
M
a
AUTOMATIC PRIMER VALVE
WITH INTEGRAL VACUUM
BREAKER
/-- DOMESTIC WATER LINE
1/2" LINE TO TRAP
FLOOR DRAIN
DRAIN TO SEWER LINE
FLOOR DRAIN RESEAL.
NTS
JOB #: 013 -051
GUERRERO /GONZAI
ENGINEERS, INC.
t0l;
Michnel C. Guerrero, P.E
Irge
f.,
Mechanical Eng. Lic. #15235
Rafael L. Gonzalez, P.E.
r ^
Electrical EnJ- Lic. #11057
740 TAMIAMI CANAL R0.'`
Miaml, Horida 33144
Tel. (305) 262 -3JA4, Fax (305),
E- mail: PROJEC'I'SOGULIRRER000N
CA# 0007612
M
LanMar
DESIGN GROUP
Architecture Planning
2450 Southwest 137th Avenue
Suite #212
Miami, Florida 33175
305.226.1340
Fl. registration:
AA:26- 001927
IB :26- 001183
LU
U
U_
Li-
110
Fol
rA-
Z
0
V)
Seal:
Rey Martinez, Architect
AR 11555
Revisions:
No. Date Dept /Section By
4
5
R.
"'; w Date:
° Scale:
Job No.
(. J
Drawn by:
x�
t�y Chocked by:
07.15.13
As Shown
13 -1007
I_�•J
41)
CN
M
a
00
�
o
U-11
cn
Ln
E
Imo.
a
,
L
Z)
O
Fol
rA-
Z
0
V)
Seal:
Rey Martinez, Architect
AR 11555
Revisions:
No. Date Dept /Section By
4
5
R.
"'; w Date:
° Scale:
Job No.
(. J
Drawn by:
x�
t�y Chocked by:
07.15.13
As Shown
13 -1007
I_�•J