Loading...
02-114-013'ABBREVIATIONS BOARD BLDG BUILDING BLK A/C AIR CONDITIONING LAB LABORATORY ACOUS ACOUSTICAL LAM LAMINATE ACT ACOUSTICAL TiLE LBS POUNDS ADJ ADJACENT LP LEFT HAND AFF ABOVE FINISHED FLOOR LP LOUD POINT AHU AIR HANDLING UNIT LT LIGHT ALT ALTERNATE LVR LOUVER ALUM ALUMINUM CONTROL JOiNT CLG ASL ABOVE SEA LEVEL CLR CLEARANCE BD BOARD BLDG BUILDING BLK BLOCK BLKG BLOCKING BOT BOTTOM BU BUILT UP C CONDUIT CAB CABINET CB CATCH BASIN CD CEILING DIFFUSER GEM CEMENT CER CERAMIC CFM CUBiC FEET PER MINUTE CJ CONTROL JOiNT CLG CEILING CLR CLEARANCE CMU CONCRETE MASONRY UNiT CO CLEAN OUT COL COLUMN CONC CONCRETE CONST CONSTRUCTION CONT CONTINUOUS CONSR CONTRACTOR CT CERAMIC TILE GTR COUNTER CU CONDENSING UNIT CW COLD WATER SIM COOLING WATER RETURN CWS COOLING WATER SUPPLY DET DETAIL DF DRINKING FOUNTAIN DI,A DIAMETER DIM DIMENSION DN DOWN DWG DRAWING MA5 MASONRY MAX MAXIMUM MC MEDICINE • BI MECH MECHANICAL MFR MANUFACTURER MIN MINIMUM MISC MISCELLANEOUS MLDG MOULDING MO MA50NRY OPENING MOD MODIFIED r MOUNTED MTL METAL MULL MULLION NAT NATURAL NIC NOT IN CONTRACT OM NOMINAL NTS NOT • SCALE OA OVERALL OC ON CENTER OD OUTSIDE DIMENSION OFCi OWNER FURNISHED CONTRACTOR INSTALLED OH OPPOSITE HAND OPG OPENING OFF OPPOSITE OVHD OVERHEAD EJ POINT OF QT PLASTIC PLAS PLASTER PLT PLATE ELEC POUND5/-SQUARE FOOT PSI POUNDS/5QUARE INCH PT PRESSURE TREATED FWD PLYWOOD EJ EXPANSION JOINT QT QUARRY TILE EL ELEVATION KW KILOWATT ELEC ELECTRIC I� RISER ELEV ELEVATOR RA RETURN AIR EQ EQUAL RAD RADIUS RECESS EQUIP EQUIPMENT RAG RETURN AIR GRiLL EWC ELECTRIC WATER COOLER REC RECESSED EXH EXHAUST REF REFERENCE EXIST EXISTING DETAILS PLUMBING EXP EXPANSION DOOR SCHEDULES / DOOR TYPES P -001 EXT EXTERIOR SC SOLID CORE SANITARY FLOOR PLAN sF SQUARE FOOT A -I0 S SHEET F50 FURNISHED BY OTHERS SIM SIMILAR FDN FOUNDATION SPECS SPECIFICATIONS FE FIRE EXTINGUISHER SQ SQUARE FEC FIRE EXTINGUISHER CABINET SS STAINLESS STEEL FHC FiRE HOSE CABINET ST STREET FIN FINISH STD STANDARD FiXT FIXTURE STL STEEL FL FLOOR STOR STORAGE FLUOR FLUORESCENT STRUCT STRUCTURAL FP FiRE PROOF SUSP SUSPENDED FT FOOT (FEET) SYM SYMMETRICAL FTG FOOTING FR FRAME T TREAD TtG TONGUE 4 GROOVE GA GAUGE TEL TELEPHONE GALV GALVANIZED TEMP TEMPERATURE GB GRAB BAR TERR TERRAZO GC GENERAL CONTRACTOR TNK THICK GL GLASS THRES THRESHOLD GWB GYPSUM WALL BOARD TSL TOP OF SLAB TST TOP OF STEEL TW TOP OF WALL NB NOSE BiB iYP TYPICAL HC HOLLOW CORE HM HOLLOW METAL HORiZ HORIZONTAL UC UNDERCUT HP NIGH POiNT UL UNDERWRITERS LABORATORIES HT HEIGHT UNF UNFINISHED HTG HEATING UON UNLESS OTHERWISE NOTED HVAC HEATING, VENTICATIG E AiR CONDITIONING HW NOT WATER WD WOOD W14 WATER HEATER I INSIDE DIMENSION WM WiRE MESH (NCAND INCANDESCENT WP WATERPROOFING iNSUL INSULATION WPT WORKING POINT iNT INTERIOR WTR WATER WIM WELDED WIRE MESH a -�i a t O v� 4, JUNCTION s# JOINT JT KIT KITCHEN KV KILOVOLT ♦ KILOVOLT • - KW KILOWATT NO. OF MALES WATER CLOSETS URINAL LAV NO OF FEMALES WATER CLOSETS LAVATORY 2ro -ro0 2 1 2 2 r -(00 3 2 r . w 3"11010INFRE90I I I. General Contractor shall examine the site and become Familiar with conditions affecting the construction of the premises before submitting bids. Failure to do this shall not be considered cause for additional charges or complaints. 2. Proper disposal of all waste materials shall be by the General Contractor. All individual subcontractors shall be responsible For proper disposal of waste materials due to their respective activities. The site shall be kept clean and secure at all times. Any General Contractor's subcontractor shall be responsible for proper disposal due to their activities. 3. General Contractor shall leave the job cleaned upon completion of work, including but not limited to vacuum cleaning carpets, polishing hardware, fixtures, removal of dust, dirt and paint excess. 4. Any deviation from these construction drawings and specifications must be submitted For review and approval prior to implementation. 5. The Contractor shall pay and maintain all necessary City, County and State licenses prior to commencing construction. if special permits are required for any part of the work, they shall be obtained and exhibited. The Contractor shall give all notices and comply with the laws, ordinances, codes and regulations bearing on the conduct of the work as drawn and specified. 6. it will be the Contractor's responsibility as part of the work to be done to co- ordinate his work with that of other contractors and subcontractors. '1. The Contractor shall maintain an accurate log of "As Built" information and submit same upon completion of the Job for final acceptance and certification. 5. Work and material shall comply with the applicable standards of the South Florida Bulding Code and all other applicable codes. All work shall be of good quality. g. The Contractor shall be responsible for all cutting, fitting or patching that may be required to complete the work or to make its several parts fit together properly. 10. Noise shall be held to a minimum consistent with reasonable construction methods. 11. The Contractor shall provide adequate security and protection for all parts of the existing building, and or their contents and occupants, wherever work under this contract Is to be performed. The General Contractor Is responsible for the removal of any item that can be damaged or stolen. 12. Contractor to include in his bid work In other areas as specifically outlined on the drawings, as prescribed by field conditions or as required for proper execution of the work indicated. 13. Upon award of contract, General Contractor shall identlfy all long lead items and order them immediately, or instruct and guarantee that the General Contractor's hired subcontractor shall do so. 14, Contractor shall keep on site a complete set of construction drawings, specifications, addendum and clarification drawings, including a copy of city approved drawings. 15. General Contractor must adhere to landlord's rules and regulations, ensure all appropriate forms are Filled out and approved by landlord prior to commencement of construction. i&. Contractor shall review manufacturers /fabricators' shop drawing submittals and co- ordinate to accommodate all trades and deadlines. Contractor shall Forward all submittals to the Architect for review of design intent compliance prior to fabrication. Q.i Q..) L- U) FA C) O W U U) Dcrc STAR DRAWING INDEX ARCHITECTURAL ELECTRICAL A -1 GENERAL NOTES, ABBREVIATIONS, LOCATION MAP, E -01 SYMBOL LEGEND, LIGHTING FIXTURE SCHEDULE, LIST OF DRAWINGS SPECIFICATIONS AND DETAILS A -2 DEMOLITION PLAN E -02 NOTES AND PANEL SCHEDULES A -3 FLOOR PLAN, CONSTRUCTION NOTES, FINISH NOTES E -03 LIGHTING AND FIRE ALARM SYSTEM FLOOR PLAN A -4 POWER AND SIGNAL PLAN E -04 POWER FLOOR PLAN A -5 REFLECTED CEILING PLAN E -05 ROOF PLAN A -6 PARTITION TYPES / DETAILS E -06 RISERS A -1 DETAILS PLUMBING A -S DOOR SCHEDULES / DOOR TYPES P -001 LEGEND, INDEX, SCHEDULES AND GENERAL NOTES A -S ENLARGED BATHROOM PLAN, ELEVATION AND DETAILS, P -200 SANITARY FLOOR PLAN INTERIOR ELEVATIONS A -I0 CABINET ELEVATIONS P -300 DOMESTIC WATER FLOOR PLAN A -11 CABINET ELEVATIONS P -500 PLUMBING ISOMETRICS A -12 CABINET ELEVATIONS / CABINET DETAILS P -100 PLUMBING DETAILS A -13 PLUMBING PLAN / NOTES FIRE PROTECTION A -14 PLUMBING ILLUSTRATIONS FP -101 FIRE PROTECTION FLOOR PLAN AND GENERAL NOTES MECHANICAL M -01 SYMBOL LEGEND, GENERAL NOTES, SHEET INDEX AND SCHEDULES M -02 FLOOR PLAN -HVAC M -03 ROOF PLAN - HVAC M -04 DETAILS M -05 DETAIL, CONTROLS AND SPECIFICATIONS S.W. 59TH PLA-41 1 Tenant Dr. •, ii Project No. REVISIONS L 1 PLUMB. COMMENTS 02/22/02 00 File name: a � • DATE 10-11-01 SHEET A-1 2000