Loading...
13-792-031�Y l j U 4r{f it I l') LI LLI 1 ON SITE SEWAGE TREATMENT AND DISPONSAL SYSTEM i CALCULATION: DATA: 6 BEDROOMS WITH 4,222 OF COND. AREA ESTIMATED SEWAGE FLOW CALCULATION AS PER 64E -6.008 TABLE N' I (RESIDENCIAL) 3300 SF OF AREA -------------------------- - - - - -- 400 GPD FOR EACH ADDITIONAL 750 SF INCREASED 60 GPD -------------------------- - - - --- 120 GPD AVERAGE FLOW --------------------------- - - - --- 600' G.P.D TOTAL 520 GPD EQUIVALENT TO 51 FU TOTAL 52G SEPTIC TANK J1 - 27/ 51X520 _ ------ _.._275 G.P.D TOTAL SEPTIC TANK 112 - 24151 X520_____ -- -_245 G. P. D TOTAL SEPTIC TANK J1: AS PER TABLE N' 11 Y G.P.D. RAGE SEWAGE ----------------------- - - - - -- 900 GAL. CAP SEPTIC TANK W IS PROPOSED x x x x x x x x MNFIELD: AS PER TABLE N' 111 x 4STIMATED SEWAGE FLOW (G.P.D) - 275 ATE ABSORSION 1N (G.P.D) -� 0.6 - 459 SF OF DRAINFIELD AND 229.5 SF UNOBTRUCTED AREA ARE REQUIRED. SEPTIC TANK #2: AS PER TABLE N' 11 245 G.P.D. f� AVERAGE SEWAGE --------------------------- 900 GAL. CAP SEPTIC TANK I FLOW. IS PROPOSED DRAINFIELD. AS PER TABLE N' 111 ESTIMATED SEWAGE FLOW (G. P. D) _ 245 RATE ABSORSION IN (G.P.D) `> 0.6 = 409 SF OF DRAINFIELD AND 204.5 SF UNOBTRUCTED AREA REQUIRED. Ih LLI La 1! `L. j N i N OTE THERE ARE ND PERTINENT FEATURES ON ADJACENT PROPERTIES AND ACROSS THE STREET THAT MAY AFFECT THE SYSTEM INSTALLATION, x x x x i�IR0f=Ef;R'T"r X INE 135. &e'X x X - X X X -X- — x T H 4 70S. L. (27FU) --" (SEE P -2 FOR CONT.) 4 "OS. P -2 a..rjel -n 1 Q APPROVED M!.VOi;Xi' "Dr-- COUNTY HEALTH DEPARTMENT PEI ,Nl iT #:. 92 . l 1220n -0 I , RESERVED �� °.� "�i, ;r'.,0 ti Iri c� 174 AREA ' PammMIMM FT. (NIP) :.�` /421/ .._ OF ;rGt;V Y SOIL I� r room c, r, DF> A1\� ice. L F itv l ,i r U-Vh I ^N _ I P.E. No 53288 t °r'. Oi- EXCAVATION AREA SHALL BE 459 SF +6' -3" N.G.V.D. AT t EAS' 7 2 FC-i�T tn.'ZER AND LON€• ER THAN THC f�ii:�":�t.t:ii v:; "• :?r 1l;:ii7 Z E'D 0'," i.);':AIN T4?FNC.i� Jose Antonio Mendez. X L X — -X - 1 -1 4 "0CWS (UG) FROM WM IN ri2 -1/2" PVC SLEEVE WHEN IS RUNNING LES TH N 10' FROM SEPTIC SYSTEM F 15' -2" U) —I CONT.) 204.5 SF IRESERVED ( io hAREA I I I H 5 —0" I I409 SF DRAINFIELD #2 I o I 4 "F.C.I GRADE ELEV. (t1 +6' -3" N.G.V.D. I IV 6" a SEPTIC TANK ;2 0 900 GALLONS L CHICAGO BRICK DRIVEWAY (SEE DETAIL I) The contractor (or designee) is required to perform a soil Poring adjacent to the drainfield excavation at the time of final Inspection. Prier to Final Approval, the FDOH inspector shall witness the soil boring and compare the results to the original site evaluation suhmittesi. A reinspection fee will be assessed If the contractor it not at the jobsite at the arranged time. IV vL etp F WCB' V Li O y- L r, 4 "FC.0 a 4 "F. C.0 L J SEPTIC TANK 1 0 36' -9" 5' -0" 900 GALLONS 1 LO FF' O EF,T'' LINE 150. 2' Apljrkov - i.l h11AM,I -DADE G )PTY HEALTH DEPARTMEN Pi:_RM'I'i- k—OF i 115 �g DATE; - -- The contractor (or designee) is required to perform a soil C`7 C kL (Mill) boring adjacent to the drainfield excavation at the time of final Inspection, Prior to Final Approval, the FDOH inspector shall i�?rlsN! iL.Lt7 �- - ---50, FT. (IAIN) witness the soil boring and compare the results to the original site evaluation sultrnitted. A reinspection fee will be assessed OF SLIGH -F LY LIMITED SOIL If the contractor is not at the jobsite at the arranged time. t1NDF ? DOTTOIJI OF DY:F1iNFiE. ?�1 INVCRT ELEVATION CiOTTOM OF DRAINMELD ELEVATED -,.- ----^ PERIMETER OF EXCAVATION AREA SHALL BE AT LEAST 2 FEET wIDiE R AND LONGER THAN THE !I !i t 6.12' (HIGHEST CROWN OF ROAD ELEVATION) Jl PROPOSED. AOQORPTION OLD OR DR . 0 I229.5 SF I , RESERVED �� °.� "�i, ;r'.,0 ti Iri c� 174 AREA ' PammMIMM � :.�` aaam�Qar ma I� O F IGRADE ELEV. I P.E. No 53288 459 SF +6' -3" N.G.V.D. • r Jose Antonio Mendez. I DRAINFIELD I Professional Engineer p Q II 41 � ", cu The contractor (or designee) is required to perform a soil Poring adjacent to the drainfield excavation at the time of final Inspection. Prier to Final Approval, the FDOH inspector shall witness the soil boring and compare the results to the original site evaluation suhmittesi. A reinspection fee will be assessed If the contractor it not at the jobsite at the arranged time. IV vL etp F WCB' V Li O y- L r, 4 "FC.0 a 4 "F. C.0 L J SEPTIC TANK 1 0 36' -9" 5' -0" 900 GALLONS 1 LO FF' O EF,T'' LINE 150. 2' Apljrkov - i.l h11AM,I -DADE G )PTY HEALTH DEPARTMEN Pi:_RM'I'i- k—OF i 115 �g DATE; - -- The contractor (or designee) is required to perform a soil C`7 C kL (Mill) boring adjacent to the drainfield excavation at the time of final Inspection, Prior to Final Approval, the FDOH inspector shall i�?rlsN! iL.Lt7 �- - ---50, FT. (IAIN) witness the soil boring and compare the results to the original site evaluation sultrnitted. A reinspection fee will be assessed OF SLIGH -F LY LIMITED SOIL If the contractor is not at the jobsite at the arranged time. t1NDF ? DOTTOIJI OF DY:F1iNFiE. ?�1 INVCRT ELEVATION CiOTTOM OF DRAINMELD ELEVATED -,.- ----^ PERIMETER OF EXCAVATION AREA SHALL BE AT LEAST 2 FEET wIDiE R AND LONGER THAN THE !I !i t 6.12' (HIGHEST CROWN OF ROAD ELEVATION) Jl PROPOSED. AOQORPTION OLD OR DR . 0 51TE FLUM5ING FLAN � a �� °.� "�i, ;r'.,0 ti Iri ma6memamea 174 11— I 11 &CALE:1 10 — 1 -Q� ' PammMIMM :.�` aaam�Qar ma �`: O F s~ x P.E. No 53288 • r Jose Antonio Mendez. P, sheet no. Professional Engineer p Q II 1 � ", U) =I �/ pm�ffaaauomea E- 1385 Coral Way Sulte #203 Miami, FL 33145 amoomaa ®oma RQQP. 0 PH:(305)854 -9824 FAX(305)856-1797 jese0118Qaol.com CA 00008324 • Z W A O - �..Y - -.••r° �.�T -ate - 0 • U 0 - coo ce ce C, 0 W WQW El L) O N � z�m Z c' �. O (� I �� � W GW O Z O u Q n u 0 z x w x A W �;-. I I I 01 1 1 r� O 0 � a � 174 b ` O F s~ x W o P, sheet no. H 1 U) E- 0 a�0 w • Z W A O LO W �;-. I I I 01 1 1 r� O J � � b ` O s~ x o P, sheet no. p 1 Of -