Loading...
10-558R-010Y" JOINT USE PREMOLDED JOINT FILLER ISOLATION JOINT (IJ) SAWCUT 1 "* BURKE KEYED KOLD FORM * SAWCUT AS SOON AS POSSIBLE AFTER CONCRETE HARDENS. SAW CUTTING MUST BE COMPLETE WITHIN 8 HRS. AFTER POURING. CONTROL JOINTS SLAB ON GRADE 8" SAW -CUT JOINT (SJ) CONSTRUCTION JOINT (CJ) 18" JJ 2 \ MASONRY WALL STARTER COLUMN AT EXISTING MASONRY CYICTIIJ/_` CI AD Y "0x4" CONCRETE SCREWS 012" O.C. 1h" EMBEDMENT INTO EXISTING CONCRETE. r NEW TO EXISTING SLAB INSTALLING ANCHORS CL 16) Will #3 1' -0" 2— C12x30 (ON EACH L8x4xNzx1' -5" SIDE OF BEAM) O 0 r O a D v: 5" D ANCHORS ON OPPOSITE SIDE CHANNEL EXISTING t— WO W.A. WITH 4" MIN. TIE BEAM EMBEDMENT AT 12" STAGGERED NOTE: EXISTING PILASTER DO NOT REMOVE EXISTING COLUMNS UNTIL CHANNELS ARE INSTALLED CHANNEL CONNECTION 0 TO PILASTER/ WALL SCALE: 1N2 " =1' -0" MINIMUM LINTEL BEARING 8" EACH END. EXTEND BARS 6" BEYOND FACE OF SUPPORT. a 2 #6 ON THICKENED SLAB OPENINGS 9' -1" TO 12' -0" WIDE 3 — % "0 W.A. WITH #6 FOR OPENINGS 3�" EMBEDMENT TO 12' -0" WIDE 2 #5 v 4. ° DRILL 3/4 "0x4" HOLES WIDE OR LESS d; b 03' -0" O.C. AND SET OPENINGS ° #5 IN EPDXY ° 2 #5 D 8 "x8" CONCRETE STARTER COLUMN o °: EXISTING WALL D GROUT SOLID TOP TO BOTTOM OF WALL 48 HOURS PRIOR TO STARTER COLUMN AT EXISTING MASONRY CYICTIIJ/_` CI AD Y "0x4" CONCRETE SCREWS 012" O.C. 1h" EMBEDMENT INTO EXISTING CONCRETE. r NEW TO EXISTING SLAB INSTALLING ANCHORS CL 16) Will #3 1' -0" 2— C12x30 (ON EACH L8x4xNzx1' -5" SIDE OF BEAM) O 0 r O a D v: 5" D ANCHORS ON OPPOSITE SIDE CHANNEL EXISTING t— WO W.A. WITH 4" MIN. TIE BEAM EMBEDMENT AT 12" STAGGERED NOTE: EXISTING PILASTER DO NOT REMOVE EXISTING COLUMNS UNTIL CHANNELS ARE INSTALLED CHANNEL CONNECTION 0 TO PILASTER/ WALL SCALE: 1N2 " =1' -0" MINIMUM LINTEL BEARING 8" EACH END. EXTEND BARS 6" BEYOND FACE OF SUPPORT. a 2 #6 FOR OPENINGS 9' -1" TO 12' -0" WIDE 2 #6 FOR OPENINGS 6' -1" TO 12' -0" WIDE 2 #5 FOR OPENINGS 6' -0" WIDE OR LESS 2 #6 FOR OPENINGS 6' -1" TO 12' -0" WIDE FOR EXTERIOR WALLS TYPICAL LINTEL DETAIL SEE ARCHITECTURAL DRAWINGS FOR LOCATION a �a COLUMN J U r M 3" CL. Z_ m r EXISTING MASONRY WALL. GROUT SOLID TOP TO BOTTOM OF WALL 48 HOURS PRIOR TO INSTALLING ANCHORS 12 "x12" COLUMN WITH 4 #6 BARS AND #3 TIES 012" O.C. U.O.N. COLUMN DOWELS TO BE SAME SIZE & QUANTITY AS COL. REINF, WITH ACI STD HOOK r 0 MI N 4'- 0 "x4' -0" FOOTING 5 #5 EACH WAY COLUMN FOOTING DETAIL Al #5x3' -6" WITH D ON BEAM STING FOOTING SLAB STEP DETAILS �6 v 4. d • d; 'v v j • v 2— C12x30 (ON EACH SIDE OF BEAM) ° ' D D I COPE ANGLE AT ° J CONTRACTORS OPTIONS - LLV*^ . 11-L 6 — % "0 W.A. WITH 4" MIN. EMBEDMENT GA:5" 6B CHANNEL TO WALL f� REFER TO 6A/S3.01 FOR ANCHOR INFO EXISTING TIE BEAM 2 SCALE: 1Ys " =1' -0" lie N EDGE OF SLAB �6 O O CITY 13 �LDINNG DEPT. STRUC T URAL CTIOft •PROVED 6Y: _ 4, PL x9 "x5" WITH 2 —' "0 J CHIP DOWN SLAB 2" W.A. WITH 1" EMBEDMENT TO RECESS PLATE STOREFRONT FRAME CONNECTION FAMILY ROOM S3.01 ADDITON & ALTERATION TO NATALIA & FERNANDO'S RESIDENCE 5901 S.W. 81 STREET SOUTH MIAMI, FL 33143 i 3 11 -03 -10 GENERAL REVISION 2 09 -02 -10 COORDINATION 1 07 -29 -10 REVIEW COMMENTS REV DATE DESCRIPTION BLISS & NYITRAY, INC. STRUCTURAL ENGINEERS Certificate of Authorization No. CA 674 800 Douglas Road, Suite 300 Coral Gables Florida, 33134 Tel. ( 305) 442 -7086 Fax(305) 442 -7092 www.bniengineers.com Paul A. Zilio, P.E. Fla. Reg. No. 47013 BNI Project No.10M14 P�TB ASSOCIATES, P.A. ARCHITECTS 500 SOUTH DIXIE HWY, SUITE 303 CORAL GABLES, R. 33146 PH. (305) 665 -064 MAY 19, 2010 JOHN E. JUNKIN AR 006454