Loading...
11-146-011ROUND FLEX DUCT HANGING DETAIL NTS MAX. SPAN 48" mmudem ATTACH TO TOP CORD OF JOIST WITH 5/16 NUTS,BOLT, FENDER WASHERS DUCT HANGING DETAIL NTS NOTE: HANG DUCTS ACCORDING TO SMACNA STANDARDS TYPICAL HAN STRAP & SADDLE DUCT HANGING DETAIL =14mo 1wf09VJI9RM19m1=-- pr TYPICAL CHANNEL & STRAP DUCT HANGING DETAIL "low, GENERAL MECHANICAL NOTES GENERAL MECHANICAL NOTES AC UNIT EXISTING AC UNIT 1- ALL WORK EXECUTED UNDER THESE OFFICIAL DOCUMENTS SHOULD BE PERFORMED BY A LICENSED AND INSURED MECHANICAL CONTRACTOR AND BE IN COMPLIANCE WITH THE LATEST FLORIDA BUILDING CODE (FBC), SHEET METAL & AIR CONDITIONING DUCTWORK: RIGID FOILFACED 1.5" R=6.0 SUPPORT CONTRACTOR'S ASSOCIATION (SMACNA) STANDARDS, AND ALL OTHER APPLICABLE STATE 48" O.C. ALL TURNS AND TRANSITIONS AND LOCAL CODE. ;-"7, PRESSURE TAPE AND MASTIC ,SEAL ALL SEAMS ............... . . . . . . . . . . . . . . . AND JOINTS. 2- ALL WORK SHALL BE PERFORMED IN A FIRST CLASS WORKMANSHIP MANNER TO PRODUCE A COMPLETE SYSTEM THAT IS FULLY BALANCED, AND ADHERES TO ALL FLEX UL CLASS ONE AIR DUCT, R=6 APPLICABLE CODES AND REGULATIONS. SUPPORT 48"O.C.. SPIN IN COLLARS- 3- MECHANICAL CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE THAT THE COMPLETE WITH M.V.D. TIE WRAP INNER LINER AND SYSTEM INSTALLED IS FREE OF DEFECTS OF MATERIALS AND WORKMANSHIP FOR A ��jjLO PRESSURE TAPE AND MASTIC SEAL OUTER PERIOD OF A YEAR AFTER THE WORK IS COMPLETE AND TURNED OVER TO THE OWNER. LINER WITHOUT COMPRESSING INSULATION ARCHITECTURE & 4- THE MECHANICAL CONTRACTOR IS RESP NSIBLE TO OBTAIN HIS OWN PERMIT AND PAY EXHAUST: GALVANIZED SNAP LOCK-SUPPORT, R=6 ALL PERMIT AND INSPECTION FEES. PLANNING LLC_ 48" O.C• AND AT ALL'JURNS. NO SUPPORT OR WEIGHT TO LAY ON EXHAUST FAN HOUSING 5-AT THE COMPLETION OF THE PROJE OR RESPONSIBLE TO PROVIDE A INSULATION R=6 ,SET OF PRINTS CLEARLY MARKED, D CONDITIONS TO THE AA26001717 DIFFUSERS: METALAIRE SERIE 5800 ENGINEER FOR RECORD. RETURNS: METAL*AIRE SERIES RH 6-0 .,ONTRACTOR SHALL PAY SPECIAL IPMENT, FURNITURE, AND - CARPETING TO PREVENT CONTAMI WRAPPING FURNITURE AND EXHAUST FAN :NA EQUIPMENT. ALL WASTE AND DEB 'THE END OF EACH DAY TO 5200 SUNSET DRIVE THERMOSTAT: REUSE EXISTING NEW USE BUILDING STANDARD MAINTAIN ACCEPTABLE INDOOR AIR Q ALIT L VEL U G THE CONSTRUCTION. MIAMI, FL 33143 7- ANY PORTION OF EXISTING BUILDING (FLOOR, WALL, CEILING, OR ROOF) THAT IS T- 786.2535530 AFFECTED BY EITHER REMOVAL, RELOCATIOW40R INSTALLATION OF A NEW EQUIPMENT F. 305.6612944 SHALL BE REPAIRED AND MATCHED FINISHED EXISTING CONDITIONS ACCORDING TO E-JUAN@CDG-CAP.COM ARCHITECTURAL DRAWINGS OR SPECIFICATIONS. 8- WHEREVER DUCT RUNS THROUGH STRUCTURAL ELEMENT SUCH AS BEAM PRECAUTION SHALL BE TAKEN TO COORDINATE WITH OTHER TRADES TO RELOCATE OR TO PROVIDE NECESSARY SLEEVE BEFORE CONCRETE IS BEING POURED. FRESH REQUIREMENTS PER ASHRAE 62.1 2001 9- SUPPLY 6 COPIES OF SHOP DRAWINGS FOR REVIEW TO ARCHITECT. NO EQUIPMENT IS TO BE ORDERED PRIOR TO THEIR APPROVAL. 10-MECHANICAL CONTRACTOR TO PROVIDE TWO (2) COMFORT BALANCE VISITS TO SUIT THE OFFICE AREA NEEDS OF THE CLIENTS. 5CFM/PERSON 2PEOPLE + 0.06CFM/SF X 198 = 23CFM 11-OPENINGS AND DUCT TRAVELING THROUGH FIRE RATED WALL, TENANT DEMISING WALL, MASSAGE AREA MECHANICAL AND ELECTRICAL ROOM, WALL AND FLOOR PARTITION, FLOOR AND ROOF 20CFM/PERSON X 5PEOPLE + .06CFM/SF X 446SF SLAB SHALL BE INSTALLED WITH "B"-FIRE DAMPER. 127CFM 12-NOT USED FRESH AIR REQUIRED 150 CFM FRESH AIR PROVIDED 150 CFM 13-MOTORIZED DAMPERS REQUIRED ON EXHAUST AND OUTDOOR SUPPLY WHERE AIR FLOW IS GREATER THAN 300 CFM, PER F.B.C• 2004, SECTION 13-409, VENTILATION, PARAGRAPH 13-409.1.ABC.3 VENTILATION CONTROLS. 0 M 14-H.V.A.C. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A FULLY OPERATIONAL AND BALANCED SYSTEM THAT ADHERES TO ALL APPLICABLE CODES AND REGULATIONS. 15-CONTRACTOR TO PROVIDE CERTIFIED TEST AND BALANCE FOR ALL SYSTEMS 16-IN CEILINGS BEING USED AS A PLENUM, COMBUSTIBLES OR COMBUSTIBLE CONTRUC11ON SHALL NOT BE ALLOWED. SITE VISIT < C� 1- MECHANICAL CONTRACTOR IS DULY REQUIRED TO VISIT PROJECT SITE AND VERIFY > EXISTING CONDITIONS PRIOR TO SUBMITTING BIDS. HE OR SHE SHALL NOTIFY THE 0 ENGINEER OF ANY DISCREPANCY AT ONCE. FAILURE TO DO SO, THE MECHANICAL CONTRACTOR IS PROCEEDING AT HIS OWN RISK. 2- DESIGN THAT IS CALLED FOR NEW DUCT OR PIPING TO BE CONNECTED TO EXISTING SYSTEM REQUIRES THE CONTRACTOR TO VERIFY EXISTING DUCT & PIPING SIZE BEFORE � > Lo FABRICATION AND INSTALLATION. I ^ () () 00 3- WHENEVER INTERFERENCE OR CONFLICT OCCURS WITH THE PROPOSED DESIGN, BEFORE = Lr) PROCEEDING TO ANY CHANGE OR DEVIATION FROM THE EXISTING BID, THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE CHANGE INCLUDED A DETAILED DRAWING FOR APPROVAL FROM ARCHITECT/ ENGINEER. 4- CONTRACTOR SHALL CONSULT WITH STRUCTURAL ENGINEER' MERICUTTING OR MAKING OPENING IN ANY BUILDING COMPONENT. CONTRACTOR $U4jL_Wk1FY THAT SfRUCTIURAL°l IN* "i;/ INTEGRITY OF THE BUILDING IS NOT BEING COMPROMISr:-­ z 5- POST TENSION STRUCTURAL SLAB: NO CUTTING OR DRJLLING SHALL BE TAKEN PLACE WITHOUT THE X-RAY OF THE SLAB AND THE WRITTEN !APPR6,VAL OF THE STRUCTURAL In ENGINEER OF THE BUILDING. 0 Cn u EXISTING HVAC SYSTEM L0 1- MECHANICAL CONTRACTOR MUST CHANGE THE AIR FIL6' IN-ALL ..WORKING AJ-R., \10 -CONDITIONING UNIT DURING CONSTRUCTION EVERY 21 tESS--,DEPENDING-OW4k= \10 AMBIENT ENVIRONMENT TO PREVENT AIR CONTAMINA1�1 N,-EQUIPMENTif., Vill-tift BEARING FAILURE, DAMPER MALFUNCTION, ETC... rip (A ­ - __ 2- AFTER CONSTRUCTION MECHANICAL CONTRACTOR IS T D VACUUM THOROUGHLY THE MECHANICAL ROOM TO REMOVE ALL DUSTY PARTICLES, INSPECT AND' REPLACE AIR FILTERS, BEARINGS OR BELTS FOR OPTIMAL UNIT OP RATION. A7'01� N QUIP 1 3- WHEN REUSING EXISTING AIR CONDITIONING THE CON ACTOR MUST CLEAN THE COOLING AND THE CONDENSER COILS, CHECK AND ADJUST IGERANT CHARGE TO ENSURE PROPER UNIT FUNCTION, VERIFY THE EXISTING COND ISATE PIPING IS IN GOOD WORKING CONDITION, AND MAKE NECESSARY REPAIR. CONTRAC R"-SHALL CHECK ALL ELECTRICAL COMPONENTS, TIGHTEN ALL ELECTRICAL CONNECTION FOR PROPER OPERATION. 4- DETERIORATED DUCTWORK AND CEILING INSULATION ALL BE REPLACED. ALL EXISTING r DUCTWORK SHALL BE THOROUGHLY INSPECTED AND tEPAIRED REMOVED EQUIPMENT THAT IS NOT BEING USED SHALL BE RETURNED TO THE OWNER. 5- ANY EQUIPMENT THAT WAS TEMPORARILY DISCONNECTED WITH RESPECT TO A REMOVAL OF ANY OTHER DEVICE IT SHALL BE RECONNECTED TO THE EXISTING SYSTEM AND. VERIFIED THAT IT IS FULLY OPERATIONAL. 6- CONTRACTOR SHALL VERIFY EXISTING AIR CONDITIONING AND HEATING- SYSTEMS FARE FUNCTIONING PROPERLY, ITS PERFORMANCE RANGE 'WITH RESPECT ,TO ITS VOLUME CAPACITY. SEAL: 7- EQUIPMENT THAT IS LOCATED EXTERIOR OF THE BUIIDING SHALL BE PROPERLY TIED DOWN AND BE ABLE TO WITHSTAND A 140 MILESfH r SMOKE TEST READINESS IF AP jLICABTT-- 1- BEFORE SCHEDULING SMOKE TEST CONTRACTOR IS I ,EIF ' AMIUAR--- NTH EXISTING Q BUILDING SMOKE EVACUATION SYSTEM BY COORDINATING %M_­8U1MtNG­MANAGER,- VERIFY ALL MOTORIZED DAMPERS, SUPPLY AND EXHAUST FAN ARE FULLY OPERATED, MAKE ALL NECESSARY REPAIR FOR THE TEST READINESS. JUAN A. CASTILLO AR,0017144 REVISIONS: DATE-- 01-20-11 SCALE- ASSHOWN DKAYVN lauckri EngInEErIng Inc., CHECKED BY: - J.A.C. JOB NUMBER- 11-012 conouaina eranEEro E PILHUJ RE FL FES 49832 F. ■ ■ - P.F- FL REs s24ss 4S20 np- UPI am UP- 2M ftkuJM:WP- n. 33M,4 M2 TEL (990 MS-Iffil FU WES. *M-M03WS