Loading...
09-929-032� PLUMBING SPECIFICATIONS 1. ALL MATERIALS AND WORKMANSHIP SHALL BE IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND ORDINANCE. ALL MATERIALS SHALL BE NEW, FREE OF DEFECTS, AND OF AMERICAN MANUFACTURE. ALL REQUIREMENTS AND MATERIALS SHALL BE AS PROVIDED FOR ORIGINAL BUILDING AND AS INDICATED IN THESE DRAWINGS AND SPECIFICATIONS. 2. SANITARY, WASTE, VENT, AND STORM PIPING SHALL BE CENTRIFIGAL CAST IRON BELL AND SPIGOT BELOW GRADE AND NO-HUB SYSTEM NTH STAINLESS STEEL COUPLINGS ABOVE GRADE EXCEPT VENTS ABOVE GRADE MAY BE SCHEDULE 40 GALVANIZED IRON. WHERE ALLOWED BY LOCAL AUTHORITIES DWV PVC MAY BE USED INSTEAD OF CAST IRON AND 3. CONDENSATE DRAINS ABOVE GROUND SHALL BE INSULATED COPPER TYPE "M" OR DWV BELOW GROUND AS SPECIFIED FOR SANITARY PIPING. 4. POTABLE WATER PIPING BELOW GROUND SHALL BE TYPE "K" SOFT TEMPER AND HOT AND COLD WATER PIPING ABOVE GROUND SHALL BE TYPE "L" OR HARD TEMPER COPPER TUBING WITH WROUGHT COPPER FITTINGS AND SOLDER-FREE JOINTS. POTABLE WATER PIPING SHALL NOT BE INSTALLED BELOW ANY FLOOR ON GRADE OR FILL. TYPE "M" COPPER IS ACCEPTABLE. 5. PIPE SUPPORTS SHALL BE PROVIDED TO BE COMPATIBLE NTH PIPING, INSULATION, STRUCTURE, AND COMPENSATE FOR CONTRACTION AND EXPANSION. 6. THE CONTRACTOR SHALL CONNECT TO ALL EQUIPMENT FURNISHED BY THE OWNER. 7. EACH NEW FIXTURE AND EQUIPMENT SUPPLY SHALL BE PROVIDED WITH A SUPPLY STOP OR SHUT-OFF VALVE AS APPLICABLE. 8. WATER HAMMER ARRESTORS SHALL BE PROVIDE AND INSTALLED INSTALLED AS PER PDI-M 201 & FPC 604.9. WATER HAMMER ARRESTORS MAY BE PROVIDED AT EACH FIXTURE SUPPLY AT CONTRACTOR'S OPTION AND AT NO ADDITIONAL COST TO OWNER. 9. PROVIDE DIELECTRIC FITTINGS IN ALL PIPING SYSTEMS WHERE CONNECTING DISSIMILAR MATERIALS AND PROTECT AGAINST CONTACT OF DISSIMILAR THRU-OUT THE INSTALLATION. 10. INSULATE ALL HOT WATER, CONDENSATE DRAINS. AND WATER COOLER WASTES PROVIDED. 11. INSULATE HOT WATER PIPING WITH 1" ARMAFLEX INSULATION. 12. INSULATE ALL AIR CONDITIONING AND REFRIGERATION CONDENSATE DRAINS IN PLENUM AREAS. FINISH WHERE EXPOSED WITH 2 COATS OF WHITE LATEX PAINT ALL AS PER THE MANUFACTURER'S INSTRUCTIONS, 13. ALL HOSE BIBBS AND HOSE CONNECTIONS THIS PROJECT SHALL BE PROVIDED WITH VACUUM BREAKERS. 14. ALL WATER PIPING PROVIDED SHALL BE TESTED AT 100 PSIG MINIMUM HYDROSTATIC PRESSURE FOR A MINIMUM OF 4 HOURS AND SANITIZED AS PER FPC 610.1. 15. ALL SOIL, WASTE, VENT, AND STORM PIPING PROVIDED SHALL BE TESTED WITH A 10 FOOT HEAD OF WATER. WATER LEVEL POINT OR HYDROSTATIC PRESSURE GAUGE, WHERE ALLOWED BY LOCAL AUTHORITIES, SHALL REMAIN UNCHANGED FOR A MINIMUM OF 4 16. CONTRACTOR SHALL OBTAIN APPROVED MANUFACTURER'S INSTALLATION DRAWINGS FOR ALL EQUIPMENT AND CASEWORK AND CASEWORK DIMENSIONED ROUGH-IN LAYOUT PRIOR TO PROCEEDING WITH ANY WORK. 17. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIXTURE, CASEWORK, AND EQUIPMENT ROUGH-IN DIMENSIONS AND CORRECT FLOOR AND WALL PENETRATION. 18. SUBMIT SHOP DRAWINGS OF ALL MATERIALS AND EQUIPMENT TO ARCHITECT FOR APPROVAL PRIOR TO PURCHASE. 19. CONTRACTOR SHALL PROVIDE ALL SYSTEMS INDICATED IN THESE SPECIFICATIONS ON THE DRAWINGS AND AS REQUIRED TO COMPLY WITH LOCAL CODES AND ORDINANCES AS APPLICABLE TO COMPLETING WORK FOR INTENDED OCCUPANCY. IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS FOR CONTRACTOR TO PROVIDE A COMPLETE AND OPERATING INSTALLATION INCLUDING ALL OBVIOUSLY NECESSARY ITEMS EVEN THOUGH ITEMS ARE NOT INCLUDED ON THE DRAWINGS OR IN THE SPECIFICATIONS. � 20. FAMILIARIZE HIMSELF WITH ALL 80SONC CONDITIONS BEFORE PROCEEDING WITH THE - WORK. 21. PROVIDE TEMPORARY POTABLE WATER SERVICE AS REQUIRED ON SITE FOR ALL TRADES. 22. VERIFY ALL DIMENSIONS WITH STRUCTURE PRIOR TO ANY FABRICATION OR INSTALLATION. 23. CDT ALL OPENINGS AND CHASES REQUIRED TO ACCOMMODATE THE WORK BY THIS CONTR&CTDH, AND REPAIR ALL FLUORS, WALLS, ETC. DAMAGED BY SUCH CUTTINGS. ALL 00RN DONE UNDER THIS HEADING MUST CONFORM IN EVERY RESPECT TO LANDLORD AND STRUCTURAL REQUIREMENTS, AND FINISH AND QUALITY OF MATERIALS AND WORKMANSHIP REQUIRED OF APPLICABLE TRADES FOR THE 8U|LD|NC, 24. PROVIDE AN ACCURATE LAYOUT, GRADES, AND ELEVATIONS; SET SLEEVES AND OPENINGS IN AMPLE TIME; TAKE PROPER PRECAUTIONS TO PROTECT ALL WORK AND EQUIPMENT FROM DAMAGE INCLUDING EXISTING. 25. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCES WITH THE PROGRESS OF CONSTRUCTION AND IN STRICT COMPLIANCE WITH ALL APPLICABLE CODES AND STANDARDS. - 26. PROVIDE FIXTURES AND WATER HEATERS AS INDICATED ON DRAWINGS. 37. CONTRACTOR SHALL PERFORM AND/OR PAY FOR ALL TESTS INDICATED AND REQUIRED FOR ALL SYSTEMS PROVIDED. 28. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS, AND TAXES REQUIRED TO INSTALL AND COMPLETE SYSTEMS INDICATED ON THE DRAWINGS AND SPECIFIED HEREIN. 29. AT COMPLETION OF WORK REMOVE ALL RUBBISH AND DEBRIS CAUSED BY THIS WORK AND THOROUGHLY CLEAN ALL RELATED FIXTURES AND EQUIPMENT. 30. CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN 1 (ONE) YEAR FROM DATE OF ACCEPTANCE. 31. CONTRACTOR TO KEEP ACCURATE AS-8UiLTS AND SHALL SUBMIT THREE (J) COP/ES TO ARCHITECT/ENGINEER SEVENTY TWO /72\ HOURS PRIOR TO FINAL INSPECTION. 32. CONTRACTOR TO NOTIFYARCH|TECT/ENQNE[R IMMEDIATELY UPON ANY DISCREPANCIES, IF FOUND. 33. ALL PLUMBING FIXTURES TO COMPLY WITH FPC TABLE 604.4 34. THE FIRST 8'-0^ OF OUTLET PIPING FOR A CONSTANT TEMPERATURE NONREC!RCULATING STORAGE SYSTEW, AND THE INLET PIPE BETWEEN THE STORAGE TANK AND A HEAT TRAP IN A NONREC|RCULATING STORAGE SYSTEM SHALL BE INSULATED TO LEVELS SHOWN IN THE FBC 13-412.1.A8C.4 35. NO DEAD ENDS SHALL BE PERMITTED. THE REMOVAL OF PLUMBING FIXTURES SHALL COMPLY WITH FPC 704.5. 36. ALL EQUIPMENT CONNECT FOR CONSUMPTION T0 HAVE BACKFL0VYPREVENTER. 37, ALL EXPOSED PIPING UNDER LAVATORIES SHALL BE INSULATED AS PER FPC 404.6.4. 38. ALL VALVES SHALL BE IDENTIFIED AS PER FPC 606.4. 30. ALL HOSE B|BBB ARE TO BE SEPARATELY VALVED AS PER FPC 606.2. 40' ALL PIPING TO BE IDENTIFIED AS PER FPC 608.8. 41. ALL INDIRECT WASTE PIPING TO BE TRAPPED AS PER FPC 802.2. | | 42. PROVIDE CLEANOUTS AT-75'-U^ ON CENTER AND AT ALL TURNS. HANGER ROD SCHEDULE PIPE SIZE ROD SIZE PIPE SIZE ROD SIZE HOT WATER 1107 Ln HOT-VIATE,"Z 1437 NONPOTABLE WATER ` � � HEAVY ~~.. CONCRETE - STEEL INSERT NTH ELONGATED STRAP INSERT NUT = �-HANGER ROD CONCRETE INSERT � WEB MEMBERS ONE ANGLE ON EACH CONCRETE ST GER NUT SIDE OF WEB MEMBERS SEE PROJECT REST ON TOP OF PLANS BOTTOM CHORDS STEEL ouv. o.°°P .,/z JOISTS BETWEEN PANEL WELDS 3/16 OVER vcR/ POINTS. SIZE FOR LOAD LESS OF ANGLES BOTTOM CHO I HEAVY DUTY CONC. OF STEEL JO|ST---~- -- JOIST CLAMP ~-� HANGER ROD ANGER ROD CONCRETE JOIST 'A�� LOCKING NUT SUPPORT NUT STRUCTURAL STEEL HANGER ROD BEAM (SEE PROJECT HEAVY DUTY PLANS ^FOR SUPPORT �-� HANGER HEAVY - -- - VAPOR BARRIER HEAVY DUTY HANGER INSULATION BEAM CLAMP ­-7T241, PIPE 16 GAUGE ZINC COATED r us S*EET STEE� 3ADDL[ AT EYE SDCnET- LEA�T 8 , -' ~�~ ^�' LONG *ANCE8 ROD-~- CLEVIS HANGER CLEVIS HANGER STEEL BEAM SINGLE HORIZONTAL RUNS SINGLE HORIZONTAL RUNS NO VAPOR BARRIER INSULATION WITH VAPOR BARRIER INSULATION SCALE: NTS IRON BODY TRAP SCREW FERRULE &c ALL BRASS FINISH GRADE CLEANOUT WITH COUNTERSUNK HEAD FINISH GRADE PROVIDE POURED CONC. MINIMUM 1" BLOCK MEN C.O. IS NOT POURED CONC, BLOCK WHEN �SAME SIZE AS CLEANOUT IS _ M) NOTIN COMBINATION SIZE 4" PAVED AREA 1/8- BEND EXTERIOR INTERIOR ELEVATION ELEVATION IRON BODY TRAP SCREW FERRULE & ALL BRASS FINISH GRADE CLEANOVT WITH COUNTERSUNK HEAD PROVIDE VALVE BOX. WITH COVER LABELED C.O. IN PACED AREA STAINLESS STEEL COVER SCREWED TO THREADED CO PLUG S . . `�--FACE OF WALL COMBINATION MAX. 1/8^ B PAVED AREA TYPICAL CLEANOUTS DETAIL SCALE: NTS � ~~ ~~ ~~ ^~ ~~ � ~~ ~~ | ~~ ~~ ^~ ~~ ,~~ 211 ,~ | 11�y '~ . ,N� NZW (2F ROON1 GO OP ZXI I m. A WIPS � 0J ROLLED AND SPUN .OSED AND SEAMLESS / P5IG AIR CHARGE PE L COPPER TUBE VEnTEDnHPp PISTON. TWO )DM O-RINGS, PRESSURE )RR|CATED NTH DOW-CORNING `A APPROVED 111 SILICONE }MPDUND AMLESS SPIN REDUCTION AD FREE SOLDER JOINT ANnAnD WROUGHT COPPER APTER NTH WRENCH HEX JOSAM SIZING CHART DIMENSIONS LEGF_N0. COLD -,QATLR_ EL HOT WATER 1107 Ln HOT-VIATE,"Z 1437 NONPOTABLE WATER ` FILTERED WATER WASTE w LL | -------� G- GREASY WASTE _G- EXISTING GREASY WASTE GAS RAIN WATER LEADER CONDENSATE ABBREVIATIONS CD CONDENSATE CID WALL CLEAN OUT CW COLD WATER 75006-1 6=mmiiiii! 15 FLUSH CLEAN OUT 15-1/8 2-1/8 WATER HAMMER ARR"ESTOR DETAIL SCALE: NT5 , HOT OUTLET COLD �/8^ CoppEe TUBING MOUNTING FLOW CONTROL l- Woumnwo plANoEs («) if \\ I M INSTANT-FLOW HEATER -� \\ 0 1 WAY | COLD INLcT wmN - ANGLE STOP VALVE | COMPRESSION FITTINGS p0 4=0 J-BOX ! ' I '�� J� / u���������� �~��~���������^������� ������ � SCALE: NTS zs 14 CON � . ~~ ~ �g COP INS, ` Qw ~ HO up . �~ . ` �' � �h 0 Nils '1�»/ � -« �u. � `'8 FLUMBING WATER RISER DIAGRAM SCALE: NJZ. ! LINE LEGF_N0. COLD -,QATLR_ EL HOT WATER 1107 Ln HOT-VIATE,"Z 1437 NONPOTABLE WATER ` FILTERED WATER WASTE w LL | -------� G- GREASY WASTE _G- EXISTING GREASY WASTE GAS RAIN WATER LEADER CONDENSATE ABBREVIATIONS CD CONDENSATE CID WALL CLEAN OUT CW COLD WATER FU FIXTURE UNITS FCO FLUSH CLEAN OUT FD FLOOR DRAIN FS FLOOR SINK FFD FUNNEL DRAIN HD HUB DRAIN LL cc HW HOT WATER HWR HOT WATER RECIRC Im ICE MACHINE ORD OVERFLOW ROOF DRAIN RD ROOF DRAIN RWL RAIN WATER LEADER SOV SHUT-OFF VALVE TP TRAP PRIMER VTR VENT THRU ROOF VIF VERIFY IN FIELD SLOPE OF HORIZONTAL DRAINAGE PIPE SIZE (INCHES) MINIMUIM SLOPE (INCH PER FOOT) 18 OR LARGER 1/16 � EL Ln � _ "-�"�N ' ^ 4°�' ` ` LL w LL | -------� � ^ ! , ~^, � � w ES L9 w LL cc gr 1 0 13 U. o - \ 0 in tn Ls CC m tn \___ i �L� cn Ln � _ "-�"�N ' ^ 4°�' ` ` w CE | -------� � ^ ! , ~^, � ol LL ui LL ^^ � ' m / � � ^ � � \~°~ � � �.� . ~ ` - ~ "-�"�N ' ^ 4°�' ` � ^ ! , ~^, � � � o - \ \___ i �L�